Browse PHMSA incidents
Filter by program, year, and state. Click a date for details with operator, cause, commodity, and consequences.
Showing page 11 of 13 (121 total)
| (2021) Report update | Program | State | Operator | Cause | Consequences | Damage |
|---|---|---|---|---|---|---|
| 2021-02-15 | GTG | TX | Phillips 66 Company - Sweeny Refinery | Equipment Failure | $4,000,000 | |
| 2021-02-15 | GTG | OK | Transcontinental Gas Pipe Line Company | Equipment Failure | $100 | |
| 2021-02-11 | GTG | TX | Ozark Gas Transmission, L.l.c | Natural Force Damage | $0 | |
| 2021-02-09 | GTG | CO | Public Service Co Of Colorado | Excavation Issue | $45,000 | |
| 2021-01-30 | GTG | TX | Enable Midstream Partners, Lp | Corrosion Failure | $60,000 | |
| 2021-01-28 | GTG | TX | Gulf South Pipeline Company, Llc | Equipment Failure | $134,950 | |
| 2021-01-27 | GTG | TX | Gulf South Pipeline Company, Llc | Equipment Failure | $82,500 | |
| 2021-01-19 | GTG | TX | Atmos Pipeline - Texas | Locating Issue | $161,563 | |
| 2021-01-18 | GTG | CO | East Cheyenne Gas Storage, Llc | Natural Force Damage | $15,000 | |
| 2021-01-17 | GTG | TX | Venice Gathering System, L.l.c. | Corrosion Failure | $1,025,000 |
Showing page 11 of 13 (121 total)
Browse recent PHMSA incidents by program, year, and state. Click any incident date to open the detail page with operator, cause, commodity and consequences.
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA