Year:
State:
Total
6
YoY vs prior year
-94.8%
Severe
Damage (nominal)
$3,143,308
(2011) Report update Program State Operator Cause Consequences Damage
2011-12-12 GTG TX Tennessee Gas Pipeline Co (El Paso) Natural Force Damage $400,000
2011-12-07 GTG OH Duke Energy Ohio Excavation Issue $24,341
2011-10-02 GTG TX Columbia Gas Transmission Corp Equipment Failure $642
2011-08-04 GTG TX Columbia Gas Transmission Corp Corrosion Failure $17,500
2011-03-28 GTG TX Tennessee Gas Pipeline Co (El Paso) Material Failure Of Pipe Or Weld $200,825
2011-03-04 GTG TX Tennessee Gas Pipeline Co (El Paso) Material Failure Of Pipe Or Weld $2,500,000