Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2025-10-07 — OK
Operator
Magellan Pipeline Company, Lp
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$200
Incident datetime
2025-10-07 09:20
Report number
Location
OK
Narrative
Oneok technician arrived on site for semi-annual valve inspection and discovered a stem packing leak. Technician notified local supervisor of the situation. Osro was dispatched to assist with clean-up efforts. Operations injected additional valve packing to stop the packing leak. The entire valve was removed and replaced with a new valve setting with a stainless-steel stem. The nickel-plated carbon steel stems are a known problem due to holidays in the nickel plating on the carbon steel stems allowing corrosion to occur resulting in stem packing damage. There are currently ongoing mitigation efforts to replace all similar valves.
Detailed record list
Report Received Date
2025-11-06 00:00:00
Iyear
2025
Report Number
20250256
Supplemental Number
41554
Report Type
Original Final
Operator Id
22610
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2025-10-07 09:20:00
Time Zone
Central
Daylight Savings Ind
No
Location Latitude
30.855313
Location Longitude
-100.658147
Commodity Released Type
Crude Oil
Unintentional Release Bbls
2.29
Recovered Bbls
1.9
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2025-10-07 09:20:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Routine Shutdown
Communication State Fed Ind
No
On Site Datetime
2025-10-07 09:20:00
Confirmed Discovery Datetime
2025-10-07 09:20:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Close Datetime
2025-10-07 07:30:00
Upstream Valve Type Ind
Remotely Controlled
Downstream Action Taken
Valve Closure
Downstream Vlv Close Datetime
2025-10-07 07:30:00
Downstream Valve Type Ind
Remotely Controlled
Notify Qualified Indiv Ind
No
Oil Spill Removal Org Ind
Yes
Osro Activated Datetime
2025-10-07 09:25:00
Osro Arrived On Site Dt
10/7/2025 13:50
Num Pub Evacuated
0
Pipe Fac Name
East Houston- El Paso
Segment Name
Line Id 6645
Onshore State Abbreviation
Tx
Onshore Postal Code
76936
Onshore City Name
Eldorado
Onshore County Name
Schleicher
Designated Location
Milepost
Designated Name
347
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Mainline
Valve Mainline Type
Gate
Valve Manufacturer
Mj 303
Installation Year
2012
Manufactured Year
Unknown
Material Involved
Material Other Than Carbon Steel
Material Details
Nickel Plated Carbon Steel Stems
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
20
Est Cost Prop Damage
200
Est Cost Emergency
10000
Est Cost Environmental
30000
Est Cost Other
0
Prpty
40220
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
107
Mop Psig
953
Mop Cfr Section
Other
Mop Cfr Section Details
Longhorn Mitigation Plan Submission
Maop Established Date
2017-05-07 00:00:00
Maop Reversal Flow Ind
Yes
Surge Analysis Date
2024-10-29 00:00:00
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
153665
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
No controller actions took place prior to the release.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
Seal (Not Pump Seal) Or Packing
Additional Defect Ind
Yes
Preparer Name
G*** C*********
Preparer Title
Regulatory Compliance Specialist Ii
Preparer Email
G**************@o****.com
Preparer Telephone
9183818066
Prepared Date
2025-11-06 00:00:00
Local Contact Name
G*** C*********
Local Contact Email
G**************@o****.com
Local Contact Telephone
9183818066
Authorizer Name
R*** M****
Authorizer Telephone
9183818066
Authorizer Title
Regulatory Compliance Manager
Authorizer Email
G**************@o****.com
Narrative
Oneok technician arrived on site for semi-annual valve inspection and discovered a stem packing leak. Technician notified local supervisor of the situation. Osro was dispatched to assist with clean-up efforts. Operations injected additional valve packing to stop the packing leak. The entire valve was removed and replaced with a new valve setting with a stainless-steel stem. The nickel-plated carbon steel stems are a known problem due to holidays in the nickel plating on the carbon steel stems allowing corrosion to occur resulting in stem packing damage. There are currently ongoing mitigation efforts to replace all similar valves.
| Report Received Date | 2025-11-06 00:00:00 |
|---|---|
| Iyear | 2025 |
| Report Number | 20250256 |
| Supplemental Number | 41554 |
| Report Type | Original Final |
| Operator Id | 22610 PHMSA Enforcement |
| Name | Magellan Pipeline Company, Lp |
| Operator Street Address | 100 West 5th Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2025-10-07 09:20:00 |
| Time Zone | Central |
| Daylight Savings Ind | No |
| Location Latitude | 30.855313 Google Maps OpenStreetMap |
| Location Longitude | -100.658147 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 2.29 |
| Recovered Bbls | 1.9 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2025-10-07 09:20:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Status When Identified | Routine Shutdown |
| Communication State Fed Ind | No |
| On Site Datetime | 2025-10-07 09:20:00 |
| Confirmed Discovery Datetime | 2025-10-07 09:20:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Upstream Action Taken | Valve Closure |
| Upstream Valve Close Datetime | 2025-10-07 07:30:00 |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Action Taken | Valve Closure |
| Downstream Vlv Close Datetime | 2025-10-07 07:30:00 |
| Downstream Valve Type Ind | Remotely Controlled |
| Notify Qualified Indiv Ind | No |
| Oil Spill Removal Org Ind | Yes |
| Osro Activated Datetime | 2025-10-07 09:25:00 |
| Osro Arrived On Site Dt | 10/7/2025 13:50 |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | East Houston- El Paso |
| Segment Name | Line Id 6645 |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 76936 |
| Onshore City Name | Eldorado |
| Onshore County Name | Schleicher |
| Designated Location | Milepost |
| Designated Name | 347 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Valve |
| Valve Type | Mainline |
| Valve Mainline Type | Gate |
| Valve Manufacturer | Mj 303 |
| Installation Year | 2012 |
| Manufactured Year | Unknown |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | Nickel Plated Carbon Steel Stems |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 20 |
| Est Cost Prop Damage | 200 |
| Est Cost Emergency | 10000 |
| Est Cost Environmental | 30000 |
| Est Cost Other | 0 |
| Prpty | 40220 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Accident Psig | 107 |
| Mop Psig | 953 |
| Mop Cfr Section | Other View CFR 49 §192 |
| Mop Cfr Section Details | Longhorn Mitigation Plan Submission |
| Maop Established Date | 2017-05-07 00:00:00 |
| Maop Reversal Flow Ind | Yes |
| Surge Analysis Date | 2024-10-29 00:00:00 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 153665 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | No controller actions took place prior to the release. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Non-Threaded Connection Failure |
| Eq Failure Type | Non-Threaded Connection Failure |
| Other Non Threaded Ind | Seal (Not Pump Seal) Or Packing |
| Additional Defect Ind | Yes |
| Preparer Name | G*** C********* |
| Preparer Title | Regulatory Compliance Specialist Ii |
| Preparer Email | G**************@o****.com |
| Preparer Telephone | 9183818066 |
| Prepared Date | 2025-11-06 00:00:00 |
| Local Contact Name | G*** C********* |
| Local Contact Email | G**************@o****.com |
| Local Contact Telephone | 9183818066 |
| Authorizer Name | R*** M**** |
| Authorizer Telephone | 9183818066 |
| Authorizer Title | Regulatory Compliance Manager |
| Authorizer Email | G**************@o****.com |
| Narrative | Oneok technician arrived on site for semi-annual valve inspection and discovered a stem packing leak. Technician notified local supervisor of the situation. Osro was dispatched to assist with clean-up efforts. Operations injected additional valve packing to stop the packing leak. The entire valve was removed and replaced with a new valve setting with a stainless-steel stem. The nickel-plated carbon steel stems are a known problem due to holidays in the nickel plating on the carbon steel stems allowing corrosion to occur resulting in stem packing damage. There are currently ongoing mitigation efforts to replace all similar valves. |