HL incident on 2025-09-10 — TX
Operator
Western Midstream Partners, Lp
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$5,000
Incident datetime
2025-09-10 16:16
Report number
Location
TX
Narrative
On 9/10/2025, a jumper line on the titan to atlas ctf 10" sec 1 oil line lost containment of 17 barrels of oil due to a pinhole leak caused by internal corrosion on a flange. The line was quickly isolated and the leak contained. By 10pm that night, an additional like-and-kind spool was delivered, and the pipeline was up and running by 12:10am the following morning. Further investigation showed that pooling of solids in the jumper line was the cause of corrosion and eventual pinhole leak. Corrosion engineers have recommended a more thorough pigging regime through the north and south lines that connect to the jumper line will sufficiently push out the solids and prevent recurrence. Dbm oil services llc is a subsidiary of western midstream
Detailed record list
Report Received Date
2025-09-30 00:00:00
Iyear
2025
Report Number
20250235
Supplemental Number
41619
Report Type
Supplemental Final
Operator Id
Name
Western Midstream Partners, Lp
Operator Street Address
9950 Woodloch Forest Dr Suite 2800
Operator City Name
The Woodlands
Operator State Abbreviation
TX
Operator Postal Code
77380
Local Datetime
2025-09-10 16:16:00
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
31.725687
Location Longitude
-103.942527
Commodity Released Type
Crude Oil
Unintentional Release Bbls
17
Recovered Bbls
17
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2025-09-10 16:16:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2025-09-10 16:23:00
Restart Datetime
2025-09-10 23:10:00
Communication State Fed Ind
No
On Site Datetime
2025-09-10 16:16:00
Confirmed Discovery Datetime
2025-09-10 19:00:00
Nrc Rpt Datetime
2025-09-10 19:09:00
Nrc Rpt Num
1442386
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Close Datetime
2025-09-10 16:23:00
Upstream Valve Type Ind
Manual
Downstream Action Taken
Valve Closure
Downstream Vlv Close Datetime
2025-09-10 16:24:00
Downstream Valve Type Ind
Manual
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2025-09-10 16:16:00
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Dbm Oil Services Llc
Segment Name
Titan To Atlas Ctf 10� Sec 1 Oil
Onshore State Abbreviation
Tx
Onshore Postal Code
79770
Onshore City Name
Not Within A Municipality
Onshore County Name
Reeves
Designated Location
Survey Station No.
Designated Name
Titan Ctf
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Aboveground
Incident Area Subtype
Other
Incident Area Details
Jumper Line Between Two Traps
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Scraper/pig Trap
Installation Year
2018
Manufactured Year
2017
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
1147
Est Cost Prop Damage
5000
Est Cost Emergency
200
Est Cost Environmental
40000
Est Cost Other
0
Prpty
46347
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
143
Mop Psig
1440
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2018-01-23 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
25
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Root cause was not related to the control room
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
General Corrosion
Int Corrosive Commodity Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
No
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Intrnl Cor Microbiologic Ind
Yes
Preparer Name
T***** A*****
Preparer Title
Dot Advisor
Preparer Email
T************@w***************.com
Prepared Date
2025-11-24 00:00:00
Local Contact Name
D*** A*******
Local Contact Email
D************@w***************.com
Local Contact Telephone
4328882720
Authorizer Name
T*** B****
Authorizer Telephone
7134197032
Authorizer Title
Dot Manager
Authorizer Email
T*********@w***************.com
Narrative
On 9/10/2025, a jumper line on the titan to atlas ctf 10" sec 1 oil line lost containment of 17 barrels of oil due to a pinhole leak caused by internal corrosion on a flange. The line was quickly isolated and the leak contained. By 10pm that night, an additional like-and-kind spool was delivered, and the pipeline was up and running by 12:10am the following morning. Further investigation showed that pooling of solids in the jumper line was the cause of corrosion and eventual pinhole leak. Corrosion engineers have recommended a more thorough pigging regime through the north and south lines that connect to the jumper line will sufficiently push out the solids and prevent recurrence. Dbm oil services llc is a subsidiary of western midstream
| Report Received Date | 2025-09-30 00:00:00 |
|---|---|
| Iyear | 2025 |
| Report Number | 20250235 |
| Supplemental Number | 41619 |
| Report Type | Supplemental Final |
| Operator Id | 473 PHMSA Enforcement |
| Name | Western Midstream Partners, Lp |
| Operator Street Address | 9950 Woodloch Forest Dr Suite 2800 |
| Operator City Name | The Woodlands |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77380 |
| Local Datetime | 2025-09-10 16:16:00 |
| Time Zone | Central |
| Daylight Savings Ind | Yes |
| Location Latitude | 31.725687 Google Maps OpenStreetMap |
| Location Longitude | -103.942527 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 17 |
| Recovered Bbls | 17 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2025-09-10 16:16:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2025-09-10 16:23:00 |
| Restart Datetime | 2025-09-10 23:10:00 |
| Communication State Fed Ind | No |
| On Site Datetime | 2025-09-10 16:16:00 |
| Confirmed Discovery Datetime | 2025-09-10 19:00:00 |
| Nrc Rpt Datetime | 2025-09-10 19:09:00 |
| Nrc Rpt Num | 1442386 NRC Report How to search |
| Ignite Ind | No |
| Upstream Action Taken | Valve Closure |
| Upstream Valve Close Datetime | 2025-09-10 16:23:00 |
| Upstream Valve Type Ind | Manual |
| Downstream Action Taken | Valve Closure |
| Downstream Vlv Close Datetime | 2025-09-10 16:24:00 |
| Downstream Valve Type Ind | Manual |
| Notify Qualified Indiv Ind | Yes |
| Qualified Indiv Notif Datetime | 2025-09-10 16:16:00 |
| Oil Spill Removal Org Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Dbm Oil Services Llc |
| Segment Name | Titan To Atlas Ctf 10� Sec 1 Oil |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 79770 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Reeves |
| Designated Location | Survey Station No. |
| Designated Name | Titan Ctf |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Other |
| Incident Area Details | Jumper Line Between Two Traps |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Scraper/pig Trap |
| Installation Year | 2018 |
| Manufactured Year | 2017 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 1147 |
| Est Cost Prop Damage | 5000 |
| Est Cost Emergency | 200 |
| Est Cost Environmental | 40000 |
| Est Cost Other | 0 |
| Prpty | 46347 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Accident Psig | 143 |
| Mop Psig | 1440 |
| Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
| Maop Established Date | 2018-01-23 00:00:00 |
| Maop Reversal Flow Ind | Bi-Directional |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 25 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | < 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Root cause was not related to the control room |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | General Corrosion |
| Int Corrosive Commodity Ind | Yes |
| Int Field Exam Basis Ind | Yes |
| Int Low Point Pipe Loc Ind | Yes |
| Corrosion Inhibitors | Yes |
| Corrosion Lining | No |
| Cleaning Dewatering | No |
| Corrosion Coupons | Not Applicable - Not Mainline Pipe |
| Intrnl Cor Microbiologic Ind | Yes |
| Preparer Name | T***** A***** |
| Preparer Title | Dot Advisor |
| Preparer Email | T************@w***************.com |
| Prepared Date | 2025-11-24 00:00:00 |
| Local Contact Name | D*** A******* |
| Local Contact Email | D************@w***************.com |
| Local Contact Telephone | 4328882720 |
| Authorizer Name | T*** B**** |
| Authorizer Telephone | 7134197032 |
| Authorizer Title | Dot Manager |
| Authorizer Email | T*********@w***************.com |
| Narrative | On 9/10/2025, a jumper line on the titan to atlas ctf 10" sec 1 oil line lost containment of 17 barrels of oil due to a pinhole leak caused by internal corrosion on a flange. The line was quickly isolated and the leak contained. By 10pm that night, an additional like-and-kind spool was delivered, and the pipeline was up and running by 12:10am the following morning. Further investigation showed that pooling of solids in the jumper line was the cause of corrosion and eventual pinhole leak. Corrosion engineers have recommended a more thorough pigging regime through the north and south lines that connect to the jumper line will sufficiently push out the solids and prevent recurrence. Dbm oil services llc is a subsidiary of western midstream |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA