HL incident on 2025-08-28 — TX

Operator
Energy Transfer Company
Cause
Other Accident Cause
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$5,000
Incident datetime
2025-08-28 10:20
Report number
Location
TX
Narrative
On 08/28/25 at approximately 10:20, dead vegetation was discovered near the vlc-3 naples to bradley 8-inch line. The pipeline was shut down and valves isolated. The area was excavated and leak was confirmed to be coming from a pinhole on the bottom of the vlc-3 naples to bradley 8-inch line. Approximately 5 barrels of crude oil was released and migrated to a unnamed tributary of roaring creek. An osro cleaned up released product and contaminated soil. A clamp was installed to prevent any further release. The accident is still under investigation. A supplemental report will be submitted once the root cause analysis is completed.
Detailed record list
Report Received Date
2025-09-26 00:00:00
Iyear
2025
Report Number
20250231
Supplemental Number
41408
Report Type
Original
Operator Id
Name
Energy Transfer Company
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2025-08-28 10:20:00
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
5
Recovered Bbls
5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2025-08-28 10:20:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2025-08-28 10:20:00
Restart Datetime
2025-08-28 17:00:00
Communication State Fed Ind
No
On Site Datetime
2025-08-28 10:45:00
Confirmed Discovery Datetime
2025-08-28 15:03:00
Nrc Rpt Datetime
2025-08-28 10:49:00
Nrc Rpt Num
Additional Nrc Report Numbers
1441276
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Close Datetime
2025-08-28 10:40:00
Upstream Valve Type Ind
Manual
Downstream Action Taken
Valve Closure
Downstream Vlv Close Datetime
2025-08-28 10:40:00
Downstream Valve Type Ind
Manual
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2025-08-28 10:22:00
Oil Spill Removal Org Ind
Yes
Osro Activated Datetime
2025-08-28 10:21:00
Osro Arrived On Site Dt
8/28/2025 10:58
Num Pub Evacuated
0
Pipe Fac Name
Velocity Vlc-3
Segment Name
Naples To Bradley 8-Inch
Onshore State Abbreviation
Ok
Onshore Postal Code
73011
Onshore City Name
Not Within A Municipality
Onshore County Name
Grady
Designated Location
Milepost
Designated Name
750+85
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
48
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
8
Pipe Wall Thickness
0.188
Pipe Smys
52000
Pipe Specification
Api-5l X-52
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Tex-Tube Co
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Coating Applied Ind
No
Installation Year
2015
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
Yes
Surface Contam Ind
Yes
Amount Released
5
Rel Water Name
Unnamed Tributary Of Roaring Creek
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
5000
Est Cost Gas Released
0
Est Cost Prop Damage
5000
Est Cost Emergency
3800
Est Cost Environmental
12000
Est Cost Other
0
Prpty
25800
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
150
Mop Psig
1440
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
2015-07-07 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
54053
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Accident Cause
Cause Details
Unknown
Other Type
Unknown
Unknown Subtype
Still Under Investigation, Cause Of Accident To Be Determined* (*supplemental Report Required)
Preparer Name
T*** N*******
Preparer Title
Director - Dot Compliance
Preparer Email
T************@e*************.com
Preparer Telephone
713-989-7126
Prepared Date
2025-09-26 00:00:00
Authorizer Name
T*** N*******
Authorizer Telephone
713-989-7126
Authorizer Title
Director - Dot Compliance
Authorizer Email
T************@e*************.com
Narrative
On 08/28/25 at approximately 10:20, dead vegetation was discovered near the vlc-3 naples to bradley 8-inch line. The pipeline was shut down and valves isolated. The area was excavated and leak was confirmed to be coming from a pinhole on the bottom of the vlc-3 naples to bradley 8-inch line. Approximately 5 barrels of crude oil was released and migrated to a unnamed tributary of roaring creek. An osro cleaned up released product and contaminated soil. A clamp was installed to prevent any further release. The accident is still under investigation. A supplemental report will be submitted once the root cause analysis is completed.
Report Received Date 2025-09-26 00:00:00
Iyear 2025
Report Number 20250231
Supplemental Number 41408
Report Type Original
Operator Id 32099 PHMSA Enforcement
Name Energy Transfer Company
Operator Street Address 1300 Main Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2025-08-28 10:20:00
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 34.8978333 Google Maps OpenStreetMap
Location Longitude -97.7581944 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 5
Recovered Bbls 5
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2025-08-28 10:20:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Shutdown Datetime 2025-08-28 10:20:00
Restart Datetime 2025-08-28 17:00:00
Communication State Fed Ind No
On Site Datetime 2025-08-28 10:45:00
Confirmed Discovery Datetime 2025-08-28 15:03:00
Nrc Rpt Datetime 2025-08-28 10:49:00
Nrc Rpt Num 1441098 NRC Report How to search
Additional Nrc Report Numbers 1441276
Ignite Ind No
Upstream Action Taken Valve Closure
Upstream Valve Close Datetime 2025-08-28 10:40:00
Upstream Valve Type Ind Manual
Downstream Action Taken Valve Closure
Downstream Vlv Close Datetime 2025-08-28 10:40:00
Downstream Valve Type Ind Manual
Notify Qualified Indiv Ind Yes
Qualified Indiv Notif Datetime 2025-08-28 10:22:00
Oil Spill Removal Org Ind Yes
Osro Activated Datetime 2025-08-28 10:21:00
Osro Arrived On Site Dt 8/28/2025 10:58
Num Pub Evacuated 0
Pipe Fac Name Velocity Vlc-3
Segment Name Naples To Bradley 8-Inch
Onshore State Abbreviation Ok
Onshore Postal Code 73011
Onshore City Name Not Within A Municipality
Onshore County Name Grady
Designated Location Milepost
Designated Name 750+85
Federal No
Location Type Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 48
Crossing No
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Body
Puddle Weld Ind No
Pipe Diameter 8
Pipe Wall Thickness 0.188
Pipe Smys 52000
Pipe Specification Api-5l X-52
Pipe Seam Type Erw - High Frequency
Pipe Manufacturer Tex-Tube Co
Pipe Coating Type Fusion Bonded Epoxy(Fbe)
Coating Applied Ind No
Installation Year 2015
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind Yes
Surface Contam Ind Yes
Amount Released 5
Rel Water Name Unnamed Tributary Of Roaring Creek
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 5000
Est Cost Gas Released 0
Est Cost Prop Damage 5000
Est Cost Emergency 3800
Est Cost Environmental 12000
Est Cost Other 0
Prpty 25800
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 150
Mop Psig 1440
Mop Cfr Section Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192
Maop Established Date 2015-07-07 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 54053
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Other Accident Cause
Cause Details Unknown
Other Type Unknown
Unknown Subtype Still Under Investigation, Cause Of Accident To Be Determined* (*supplemental Report Required)
Preparer Name T*** N*******
Preparer Title Director - Dot Compliance
Preparer Email T************@e*************.com
Preparer Telephone 713-989-7126
Prepared Date 2025-09-26 00:00:00
Authorizer Name T*** N*******
Authorizer Telephone 713-989-7126
Authorizer Title Director - Dot Compliance
Authorizer Email T************@e*************.com
Narrative On 08/28/25 at approximately 10:20, dead vegetation was discovered near the vlc-3 naples to bradley 8-inch line. The pipeline was shut down and valves isolated. The area was excavated and leak was confirmed to be coming from a pinhole on the bottom of the vlc-3 naples to bradley 8-inch line. Approximately 5 barrels of crude oil was released and migrated to a unnamed tributary of roaring creek. An osro cleaned up released product and contaminated soil. A clamp was installed to prevent any further release. The accident is still under investigation. A supplemental report will be submitted once the root cause analysis is completed.

All rights reserved. Copyright © by ClearPHMSA