Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2025-07-26 — TX
Operator
Enbridge Ingleside, Llc
Cause
Incorrect Operation
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2025-07-26 17:13
Report number
Location
TX
Narrative
On july 26, 2025, at approximately 5:13 pm cdt, technicians at the taft terminal arrived for a pigging operation and discovered the sump overflowing. The control center was promptly notified, and the line was shut down and the facility was isolated. Management was notified and cleanup activities were started. Approximately 600 barrels of crude oil was released with 53 barrels being returned to the system. The remaining 547 barrels was part of contaminated soil and was properly disposed of at a disposal facility. The nrc was notified on july 26, 2025, at 6:04 pm cdt (report # 1438054) and the 48-hour update was made on july 28, 2025, at 12:21 pm cdt (report # 1438187). The railroad commission of texas was notified on july 26, 2025, at 6:27 pm cdt (report # inci 3376). The internal investigation determined the immediate cause as a failure to adhere to pipeline pigging procedures. Specifically, the pigging launcher 2-inch drain valve was left in the open position. The open drain valve permitted product to flow into the sump which caused the sump to overfill.
Detailed record list
Report Received Date
2025-08-25 00:00:00
Iyear
2025
Report Number
20250197
Supplemental Number
41407
Report Type
Supplemental Final
Operator Id
39474
Name
Enbridge Ingleside, Llc
Operator Street Address
915 N. Eldridge Parkway Suite 1100
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77079
Local Datetime
2025-07-26 17:13:00
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
27.90851
Location Longitude
-97.417513
Commodity Released Type
Crude Oil
Unintentional Release Bbls
600
Recovered Bbls
600
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2025-07-26 17:13:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2025-07-26 17:14:00
Restart Datetime
2025-07-26 22:12:00
Communication State Fed Ind
No
On Site Datetime
2025-07-26 17:13:00
Confirmed Discovery Datetime
2025-07-26 17:29:00
Nrc Rpt Datetime
2025-07-26 18:04:00
Nrc Rpt Num
1438054
Additional Nrc Report Numbers
1438187
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2025-07-26 17:18:00
Oil Spill Removal Org Ind
Yes
Osro Activated Datetime
2025-07-26 17:40:00
Osro Arrived On Site Dt
7/26/2025 19:30
Num Pub Evacuated
0
Pipe Fac Name
Enbridge Ingleside Oil Pipeline
Segment Name
Taft Terminal
Onshore State Abbreviation
Tx
Onshore Postal Code
78390
Onshore City Name
Taft
Onshore County Name
San Patricio
Designated Location
Milepost
Designated Name
9.02
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Valve
Valve Type
Auxiliary Or Other Valve
Installation Year
2015
Manufactured Year
2015
Material Involved
Carbon Steel
Release Type
Overfill Or Overflow
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
38920
Est Cost Prop Damage
0
Est Cost Emergency
100000
Est Cost Environmental
1620150
Est Cost Other
0
Prpty
1759070
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
320
Mop Psig
1480
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
2015-11-11 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest Incorrect Action Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Incorrect Operation
Cause Details
Tank, Vessel, Or Sump/separator Allowed Or Caused To Overfill Or Overflow
Operation Type
Tank, Vessel, Or Sump/separator Allowed Or Caused To Overfill Or Overflow
Overflow Other Ind
Valve Misalignment
Related Failure Follow Ind
Yes
Category Type
Normal Operating Conditions
Operator Qualification Ind
Yes
Qualified Individuals
Yes, They Were Qualified For The Task(S)
Other Type
Unknown
Unknown Subtype
Still Under Investigation, Cause Of Accident To Be Determined* (*supplemental Report Required)
Preparer Name
S**** S****
Preparer Title
Advisor Regulatory Compliance
Preparer Email
S**********@e*******.com
Preparer Telephone
7153953620
Prepared Date
2025-09-25 00:00:00
Authorizer Name
L*** S**********
Authorizer Telephone
7153941584
Authorizer Title
Supervisor Regulatory Compliance
Authorizer Email
L***************@e*******.com
Narrative
On july 26, 2025, at approximately 5:13 pm cdt, technicians at the taft terminal arrived for a pigging operation and discovered the sump overflowing. The control center was promptly notified, and the line was shut down and the facility was isolated. Management was notified and cleanup activities were started. Approximately 600 barrels of crude oil was released with 53 barrels being returned to the system. The remaining 547 barrels was part of contaminated soil and was properly disposed of at a disposal facility. The nrc was notified on july 26, 2025, at 6:04 pm cdt (report # 1438054) and the 48-hour update was made on july 28, 2025, at 12:21 pm cdt (report # 1438187). The railroad commission of texas was notified on july 26, 2025, at 6:27 pm cdt (report # inci 3376). The internal investigation determined the immediate cause as a failure to adhere to pipeline pigging procedures. Specifically, the pigging launcher 2-inch drain valve was left in the open position. The open drain valve permitted product to flow into the sump which caused the sump to overfill.
| Report Received Date | 2025-08-25 00:00:00 |
|---|---|
| Iyear | 2025 |
| Report Number | 20250197 |
| Supplemental Number | 41407 |
| Report Type | Supplemental Final |
| Operator Id | 39474 PHMSA Enforcement |
| Name | Enbridge Ingleside, Llc |
| Operator Street Address | 915 N. Eldridge Parkway Suite 1100 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77079 |
| Local Datetime | 2025-07-26 17:13:00 |
| Time Zone | Central |
| Daylight Savings Ind | Yes |
| Location Latitude | 27.90851 Google Maps OpenStreetMap |
| Location Longitude | -97.417513 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 600 |
| Recovered Bbls | 600 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2025-07-26 17:13:00 |
| System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
| On Off Shore | Onshore |
| Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2025-07-26 17:14:00 |
| Restart Datetime | 2025-07-26 22:12:00 |
| Communication State Fed Ind | No |
| On Site Datetime | 2025-07-26 17:13:00 |
| Confirmed Discovery Datetime | 2025-07-26 17:29:00 |
| Nrc Rpt Datetime | 2025-07-26 18:04:00 |
| Nrc Rpt Num | 1438054 NRC Report How to search |
| Additional Nrc Report Numbers | 1438187 |
| Ignite Ind | No |
| Notify Qualified Indiv Ind | Yes |
| Qualified Indiv Notif Datetime | 2025-07-26 17:18:00 |
| Oil Spill Removal Org Ind | Yes |
| Osro Activated Datetime | 2025-07-26 17:40:00 |
| Osro Arrived On Site Dt | 7/26/2025 19:30 |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Enbridge Ingleside Oil Pipeline |
| Segment Name | Taft Terminal |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 78390 |
| Onshore City Name | Taft |
| Onshore County Name | San Patricio |
| Designated Location | Milepost |
| Designated Name | 9.02 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Valve |
| Valve Type | Auxiliary Or Other Valve |
| Installation Year | 2015 |
| Manufactured Year | 2015 |
| Material Involved | Carbon Steel |
| Release Type | Overfill Or Overflow |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Other Pop Ind | Yes |
| Other Pop Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 38920 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 100000 |
| Est Cost Environmental | 1620150 |
| Est Cost Other | 0 |
| Prpty | 1759070 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Accident Psig | 320 |
| Mop Psig | 1480 |
| Mop Cfr Section | Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192 |
| Maop Established Date | 2015-11-11 00:00:00 |
| Maop Reversal Flow Ind | No |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest Incorrect Action Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Incorrect Operation |
| Cause Details | Tank, Vessel, Or Sump/separator Allowed Or Caused To Overfill Or Overflow |
| Operation Type | Tank, Vessel, Or Sump/separator Allowed Or Caused To Overfill Or Overflow |
| Overflow Other Ind | Valve Misalignment |
| Related Failure Follow Ind | Yes |
| Category Type | Normal Operating Conditions |
| Operator Qualification Ind | Yes |
| Qualified Individuals | Yes, They Were Qualified For The Task(S) |
| Other Type | Unknown |
| Unknown Subtype | Still Under Investigation, Cause Of Accident To Be Determined* (*supplemental Report Required) |
| Preparer Name | S**** S**** |
| Preparer Title | Advisor Regulatory Compliance |
| Preparer Email | S**********@e*******.com |
| Preparer Telephone | 7153953620 |
| Prepared Date | 2025-09-25 00:00:00 |
| Authorizer Name | L*** S********** |
| Authorizer Telephone | 7153941584 |
| Authorizer Title | Supervisor Regulatory Compliance |
| Authorizer Email | L***************@e*******.com |
| Narrative | On july 26, 2025, at approximately 5:13 pm cdt, technicians at the taft terminal arrived for a pigging operation and discovered the sump overflowing. The control center was promptly notified, and the line was shut down and the facility was isolated. Management was notified and cleanup activities were started. Approximately 600 barrels of crude oil was released with 53 barrels being returned to the system. The remaining 547 barrels was part of contaminated soil and was properly disposed of at a disposal facility. The nrc was notified on july 26, 2025, at 6:04 pm cdt (report # 1438054) and the 48-hour update was made on july 28, 2025, at 12:21 pm cdt (report # 1438187). The railroad commission of texas was notified on july 26, 2025, at 6:27 pm cdt (report # inci 3376). The internal investigation determined the immediate cause as a failure to adhere to pipeline pigging procedures. Specifically, the pigging launcher 2-inch drain valve was left in the open position. The open drain valve permitted product to flow into the sump which caused the sump to overfill. |