HL incident on 2025-07-03 — TX
Operator
Energy Transfer Company
Cause
Other Accident Cause
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$9,815
Incident datetime
2025-07-03 00:00 UTC
Report number
Location
TX
Narrative
On 6/12/2025 at approximately 19:00, while preparing for start-up, local operations discovered a crude oil release coming from a butt weld on the 13002 cmar-ctol-16inch line. The line was between delivery points and already shutdown. Approximately 0.5 barrel of crude oil was released. Osros were mobilized to cleanup free product and contaminated soil. The leak was repaired by cutting out the failed below grade section. The section was replaced and rebuilt above grade. The line was started on 6/13/2025 at 11:35. The cause of the leak is still under investigation. The failed section of pipe will be sent to a third party laboratory for analysis. A supplemental report will be submitted once the investigation is complete.
Detailed record list
Report Received Date
2025-07-03 00:00:00
Iyear
2025
Report Number
20250165
Supplemental Number
41115
Report Type
Original
Operator Id
32099
Name
Energy Transfer Company
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Eastern
Daylight Savings Ind
Yes
Location Latitude
41.666291
Location Longitude
-83.471391
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.5
Recovered Bbls
0.5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Status When Identified
Routine Start-Up
Shutdown Due Accident Ind
No
Shutdown Explain
Line Located Between Delivery Points
Communication State Fed Ind
No
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
Yes
Osro Arrived On Site Dt
6/12/2025 21:00
Num Pub Evacuated
0
Pipe Fac Name
York Street Station
Segment Name
13002 - 16" Marysville-Toledo
Onshore State Abbreviation
Oh
Onshore Postal Code
43605
Onshore City Name
Oregon
Onshore County Name
Lucas
Designated Location
Survey Station No.
Designated Name
0+00
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
30
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Weld, Including Heat-Affected Zone
Weld Subtype
Other Butt Weld
Installation Year
1967
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
Under Investigation
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
34
Est Cost Prop Damage
9815
Est Cost Emergency
14000
Est Cost Environmental
12500
Est Cost Other
0
Prpty
36349
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
120
Mop Psig
1300
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
1987-04-21 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Accident Cause
Cause Details
Unknown
Other Type
Unknown
Unknown Subtype
Still Under Investigation, Cause Of Accident To Be Determined* (*supplemental Report Required)
Preparer Name
T*** N*******
Preparer Title
Director - Dot Compliance
Preparer Email
T************@e*************.com
Preparer Telephone
713-989-7126
Prepared Date
2025-07-03 00:00:00
Authorizer Name
T*** N*******
Authorizer Telephone
713-989-7126
Authorizer Title
Director - Dot Compliance
Authorizer Email
T************@e*************.com
Narrative
On 6/12/2025 at approximately 19:00, while preparing for start-up, local operations discovered a crude oil release coming from a butt weld on the 13002 cmar-ctol-16inch line. The line was between delivery points and already shutdown. Approximately 0.5 barrel of crude oil was released. Osros were mobilized to cleanup free product and contaminated soil. The leak was repaired by cutting out the failed below grade section. The section was replaced and rebuilt above grade. The line was started on 6/13/2025 at 11:35. The cause of the leak is still under investigation. The failed section of pipe will be sent to a third party laboratory for analysis. A supplemental report will be submitted once the investigation is complete.
Report Received Date | 2025-07-03 00:00:00 |
---|---|
Iyear | 2025 |
Report Number | 20250165 |
Supplemental Number | 41115 |
Report Type | Original |
Operator Id | 32099 PHMSA Enforcement |
Name | Energy Transfer Company |
Operator Street Address | 1300 Main Street |
Operator City Name | Houston |
Operator State Abbreviation | TX |
Operator Postal Code | 77002 |
Time Zone | Eastern |
Daylight Savings Ind | Yes |
Location Latitude | 41.666291 Google Maps OpenStreetMap |
Location Longitude | -83.471391 Google Maps OpenStreetMap |
Commodity Released Type | Crude Oil |
Unintentional Release Bbls | 0.5 |
Recovered Bbls | 0.5 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Local Operating Personnel, Including Contractors |
Operator Type | Operator Employee |
System Part Involved | Onshore Pump/meter Station Equipment And Piping |
On Off Shore | Onshore |
Status When Identified | Routine Start-Up |
Shutdown Due Accident Ind | No |
Shutdown Explain | Line Located Between Delivery Points |
Communication State Fed Ind | No |
Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
Ignite Ind | No |
Notify Qualified Indiv Ind | Yes |
Oil Spill Removal Org Ind | Yes |
Osro Arrived On Site Dt | 6/12/2025 21:00 |
Num Pub Evacuated | 0 |
Pipe Fac Name | York Street Station |
Segment Name | 13002 - 16" Marysville-Toledo |
Onshore State Abbreviation | Oh |
Onshore Postal Code | 43605 |
Onshore City Name | Oregon |
Onshore County Name | Lucas |
Designated Location | Survey Station No. |
Designated Name | 0+00 |
Federal | No |
Location Type | Totally Contained On Operator-Controlled Property |
Incident Area Type | Underground |
Incident Area Subtype | Under Soil |
Depth Of Cover | 30 |
Crossing | No |
Pipe Facility Type | Interstate |
Item Involved | Weld, Including Heat-Affected Zone |
Weld Subtype | Other Butt Weld |
Installation Year | 1967 |
Manufactured Year | Unknown |
Material Involved | Carbon Steel |
Release Type | Leak |
Leak Type | Other |
Leak Type Other | Under Investigation |
Wildlife Impact Ind | No |
Soil Contamination | Yes |
Long Term Assessment | No |
Remediation Ind | Yes |
Soil Remed Ind | Yes |
Water Contam Ind | No |
Could Be Hca | Yes |
Commodity Reached Hca | Yes |
High Pop Ind | Yes |
High Pop Yes No | Yes |
Est Cost Oper Paid | 0 |
Est Cost Gas Released | 34 |
Est Cost Prop Damage | 9815 |
Est Cost Emergency | 14000 |
Est Cost Environmental | 12500 |
Est Cost Other | 0 |
Prpty | 36349 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 120 |
Mop Psig | 1300 |
Mop Cfr Section | Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192 |
Maop Established Date | 1987-04-21 00:00:00 |
Maop Reversal Flow Ind | No |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Cpm In Place Ind | Yes |
Cpm Operating Ind | Yes |
Cpm Functional Ind | Yes |
Cpm Detection Ind | No |
Cpm Conf Ind | No |
Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
Investigation Status Details | A review of the accident determined that there were no control room actions that contributed to the event. |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Other Accident Cause |
Cause Details | Unknown |
Other Type | Unknown |
Unknown Subtype | Still Under Investigation, Cause Of Accident To Be Determined* (*supplemental Report Required) |
Preparer Name | T*** N******* |
Preparer Title | Director - Dot Compliance |
Preparer Email | T************@e*************.com |
Preparer Telephone | 713-989-7126 |
Prepared Date | 2025-07-03 00:00:00 |
Authorizer Name | T*** N******* |
Authorizer Telephone | 713-989-7126 |
Authorizer Title | Director - Dot Compliance |
Authorizer Email | T************@e*************.com |
Narrative | On 6/12/2025 at approximately 19:00, while preparing for start-up, local operations discovered a crude oil release coming from a butt weld on the 13002 cmar-ctol-16inch line. The line was between delivery points and already shutdown. Approximately 0.5 barrel of crude oil was released. Osros were mobilized to cleanup free product and contaminated soil. The leak was repaired by cutting out the failed below grade section. The section was replaced and rebuilt above grade. The line was started on 6/13/2025 at 11:35. The cause of the leak is still under investigation. The failed section of pipe will be sent to a third party laboratory for analysis. A supplemental report will be submitted once the investigation is complete. |