HL incident on 2025-06-30 — TX
Operator
Crestwood Midstream Partners Lp
Cause
Other Accident Cause
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$25,000
Incident datetime
2025-06-30 00:00 UTC
Report number
Location
TX
Narrative
On 06/06/25 at approximately 17:35, an operator employee discovered a small fire on pump c3 in the pump room. The fire was immediately extinguished with a fire extinguisher. Operations discovered crude oil leaking from a seal on the 8inch 100 line inside arrow central delivery point (cdp). Approximately 1 gallon of crude oil was released. A small amount of product was consumed by the fire. The remaining product was cleaned-up by local personnel. The pump was removed and flanges blinded. The pump has been sent to a third party for analysis, inspection and repair. The line was restarted on 06/07/25 at 07:50. The cause of the accident is still under investigation by a third party. A supplemental report will be submitted once the investigation is complete.
Detailed record list
Report Received Date
2025-06-30 00:00:00
Iyear
2025
Report Number
20250158
Supplemental Number
41089
Report Type
Original
Operator Id
39368
Name
Crestwood Midstream Partners Lp
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
47.80288
Location Longitude
-102.8753
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.1
Recovered Bbls
0.1
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
No
Nrc Rpt Num
1433356
Additional Nrc Report Numbers
1433488
Ignite Ind
Yes
How Extinguished
Operator/contractor
Consumed By Fire In Barrels
0.1
Explode Ind
No
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Arrow Central Delivery Point
Segment Name
8-Inch 100 Line
Onshore State Abbreviation
Nd
Onshore Postal Code
58847
Onshore City Name
Not Within A Municipality
Onshore County Name
Mckenzie
Designated Location
Survey Station No.
Designated Name
0+00
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Inside A Building
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pump
Pump Type
Centrifugal
Pump Service Type
Injection
Installation Year
2018
Manufactured Year
2018
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
5
Est Cost Prop Damage
25000
Est Cost Emergency
100
Est Cost Environmental
0
Est Cost Other
0
Prpty
25105
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
256
Mop Psig
740
Mop Cfr Section
Four Hour Test Or Operation �195.406(A)(5)
Maop Established Date
2017-04-13 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Accident Cause
Cause Details
Unknown
Other Type
Unknown
Unknown Subtype
Still Under Investigation, Cause Of Accident To Be Determined* (*supplemental Report Required)
Preparer Name
T*** N*******
Preparer Title
Director - Dot Compliance
Preparer Email
T************@e*************.com
Preparer Telephone
713-989-7126
Prepared Date
2025-06-30 00:00:00
Authorizer Name
T*** N*******
Authorizer Telephone
713-989-7126
Authorizer Title
Director - Dot Compliance
Authorizer Email
T************@e*************.com
Narrative
On 06/06/25 at approximately 17:35, an operator employee discovered a small fire on pump c3 in the pump room. The fire was immediately extinguished with a fire extinguisher. Operations discovered crude oil leaking from a seal on the 8inch 100 line inside arrow central delivery point (cdp). Approximately 1 gallon of crude oil was released. A small amount of product was consumed by the fire. The remaining product was cleaned-up by local personnel. The pump was removed and flanges blinded. The pump has been sent to a third party for analysis, inspection and repair. The line was restarted on 06/07/25 at 07:50. The cause of the accident is still under investigation by a third party. A supplemental report will be submitted once the investigation is complete.
Report Received Date | 2025-06-30 00:00:00 |
---|---|
Iyear | 2025 |
Report Number | 20250158 |
Supplemental Number | 41089 |
Report Type | Original |
Operator Id | 39368 PHMSA Enforcement |
Name | Crestwood Midstream Partners Lp |
Operator Street Address | 1300 Main Street |
Operator City Name | Houston |
Operator State Abbreviation | TX |
Operator Postal Code | 77002 |
Time Zone | Central |
Daylight Savings Ind | Yes |
Location Latitude | 47.80288 Google Maps OpenStreetMap |
Location Longitude | -102.8753 Google Maps OpenStreetMap |
Commodity Released Type | Crude Oil |
Unintentional Release Bbls | 0.1 |
Recovered Bbls | 0.1 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Local Operating Personnel, Including Contractors |
Operator Type | Operator Employee |
System Part Involved | Onshore Pump/meter Station Equipment And Piping |
On Off Shore | Onshore |
Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
Shutdown Due Accident Ind | Yes |
Communication State Fed Ind | No |
Nrc Rpt Num | 1433356 NRC Report How to search |
Additional Nrc Report Numbers | 1433488 |
Ignite Ind | Yes |
How Extinguished | Operator/contractor |
Consumed By Fire In Barrels | 0.1 |
Explode Ind | No |
Notify Qualified Indiv Ind | Yes |
Oil Spill Removal Org Ind | No |
Num Pub Evacuated | 0 |
Pipe Fac Name | Arrow Central Delivery Point |
Segment Name | 8-Inch 100 Line |
Onshore State Abbreviation | Nd |
Onshore Postal Code | 58847 |
Onshore City Name | Not Within A Municipality |
Onshore County Name | Mckenzie |
Designated Location | Survey Station No. |
Designated Name | 0+00 |
Federal | No |
Location Type | Totally Contained On Operator-Controlled Property |
Incident Area Type | Aboveground |
Incident Area Subtype | Inside A Building |
Crossing | No |
Pipe Facility Type | Intrastate |
Item Involved | Pump |
Pump Type | Centrifugal |
Pump Service Type | Injection |
Installation Year | 2018 |
Manufactured Year | 2018 |
Material Involved | Carbon Steel |
Release Type | Leak |
Leak Type | Seal Or Packing |
Wildlife Impact Ind | No |
Soil Contamination | No |
Long Term Assessment | No |
Remediation Ind | No |
Water Contam Ind | No |
Could Be Hca | No |
Commodity Reached Hca | No |
Est Cost Oper Paid | 0 |
Est Cost Gas Released | 5 |
Est Cost Prop Damage | 25000 |
Est Cost Emergency | 100 |
Est Cost Environmental | 0 |
Est Cost Other | 0 |
Prpty | 25105 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 256 |
Mop Psig | 740 |
Mop Cfr Section | Four Hour Test Or Operation �195.406(A)(5) View CFR 49 §192 |
Maop Established Date | 2017-04-13 00:00:00 |
Maop Reversal Flow Ind | No |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | Yes |
Scada Conf Ind | No |
Cpm In Place Ind | Yes |
Cpm Operating Ind | Yes |
Cpm Functional Ind | Yes |
Cpm Detection Ind | No |
Cpm Conf Ind | No |
Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
Investigation Status Details | A review of the accident determined that there were no control room actions that contributed to the event. |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Other Accident Cause |
Cause Details | Unknown |
Other Type | Unknown |
Unknown Subtype | Still Under Investigation, Cause Of Accident To Be Determined* (*supplemental Report Required) |
Preparer Name | T*** N******* |
Preparer Title | Director - Dot Compliance |
Preparer Email | T************@e*************.com |
Preparer Telephone | 713-989-7126 |
Prepared Date | 2025-06-30 00:00:00 |
Authorizer Name | T*** N******* |
Authorizer Telephone | 713-989-7126 |
Authorizer Title | Director - Dot Compliance |
Authorizer Email | T************@e*************.com |
Narrative | On 06/06/25 at approximately 17:35, an operator employee discovered a small fire on pump c3 in the pump room. The fire was immediately extinguished with a fire extinguisher. Operations discovered crude oil leaking from a seal on the 8inch 100 line inside arrow central delivery point (cdp). Approximately 1 gallon of crude oil was released. A small amount of product was consumed by the fire. The remaining product was cleaned-up by local personnel. The pump was removed and flanges blinded. The pump has been sent to a third party for analysis, inspection and repair. The line was restarted on 06/07/25 at 07:50. The cause of the accident is still under investigation by a third party. A supplemental report will be submitted once the investigation is complete. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA