HL incident on 2025-06-16 — TX

Operator
Coffeyville Resources Crude Transportation, Llc
Cause
Notification Issue
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$36,000
Incident datetime
2025-06-16 00:00 UTC
Report number
Location
TX
Narrative
At approximately 1300 hrs on may 19, 2025, a county road grader struck the velma to antioch pipeline while grading camelback road in stephens county oklahoma. The grader operator contacted coffeyville resources crude transportation, llc (crct) to notify of the strike. Crct personnel immediately shut the line down and responded to the downstream valve to close.
Detailed record list
Report Received Date
2025-06-16 00:00:00
Iyear
2025
Report Number
20250145
Supplemental Number
41120
Report Type
Supplemental Final
Operator Id
Name
Coffeyville Resources Crude Transportation, Llc
Operator Street Address
2277 Plaza Drive Suite 500
Operator City Name
Sugar Land
Operator State Abbreviation
TX
Operator Postal Code
77479
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
4.5
Recovered Bbls
4.5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Third Party That Caused The Accident
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
No
Nrc Rpt Num
Additional Nrc Report Numbers
1431743
Ignite Ind
No
Upstream Action Taken
Operational Control
Upstream Oprtnl Cntrl Detail
Shut Down Main Pump Associated With Affected Pipeline.
Downstream Action Taken
Valve Closure
Downstream Valve Type Ind
Manual
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Southern Oklahoma
Segment Name
Velma To Antioch
Onshore State Abbreviation
Ok
Onshore Postal Code
73488
Onshore City Name
Not Within A Municipality
Onshore County Name
Stephens
Designated Location
Milepost
Designated Name
7.112
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
3
Crossing
Yes
Road Crossing Ind
Yes
Road Type
Uncased
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
8
Pipe Wall Thickness
0.322
Pipe Smys
24000
Pipe Specification
Unknown
Pipe Seam Type
Erw � Unknown Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Coating Applied Ind
Yes
Installation Year
Unknown
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
1
Puncture Circum
1
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
5000
Est Cost Gas Released
270
Est Cost Prop Damage
36000
Est Cost Emergency
5000
Est Cost Environmental
3000
Est Cost Other
0
Prpty
49270
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
160
Mop Psig
250
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
2014-04-03 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The accident was caused by excavation damage by third party
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
No
State Law Exempt Ind
No
Notify Cga Dirt
Yes
Public Row Ind
Yes
Public Subtype
County Road
Joint Trench Ind
No
Cross Bore Ind
No
Depth Of Grade
Measured Depth From Grade
Depth Of Grade Detail
3
Excavator Type
County
Excavator Equipment
Grader/scraper
Work Performed
Grading
One Call Notified Ind
No
Locator Type
Facility Owner
Visible Marks
No
Service Interruption
Yes
Service Interruption Hours
31
Root Cause Category
Notification Issue
Root Cause Type
No Notification Made To The One-Call Center/811
Excvtn Dmg Third Party Ind
Yes
Preparer Name
B**** R*****
Preparer Title
Pipeline Compliance Specialist
Preparer Email
B******@c********.com
Preparer Telephone
4052500910
Prepared Date
2025-07-07 00:00:00
Local Contact Name
B**** R*****
Local Contact Email
B******@c********.com
Local Contact Telephone
4052500910
Authorizer Name
B**** R*****
Authorizer Telephone
4052500910
Authorizer Title
Pipeline Compliance Specialist
Authorizer Email
B******@c********.com
Narrative
At approximately 1300 hrs on may 19, 2025, a county road grader struck the velma to antioch pipeline while grading camelback road in stephens county oklahoma. The grader operator contacted coffeyville resources crude transportation, llc (crct) to notify of the strike. Crct personnel immediately shut the line down and responded to the downstream valve to close.
Report Received Date 2025-06-16 00:00:00
Iyear 2025
Report Number 20250145
Supplemental Number 41120
Report Type Supplemental Final
Operator Id 5081 PHMSA Enforcement
Name Coffeyville Resources Crude Transportation, Llc
Operator Street Address 2277 Plaza Drive Suite 500
Operator City Name Sugar Land
Operator State Abbreviation TX
Operator Postal Code 77479
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 34.550568 Google Maps OpenStreetMap
Location Longitude -97.598807 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 4.5
Recovered Bbls 4.5
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Notification From Third Party That Caused The Accident
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Communication State Fed Ind No
Nrc Rpt Num 1431559 NRC Report How to search
Additional Nrc Report Numbers 1431743
Ignite Ind No
Upstream Action Taken Operational Control
Upstream Oprtnl Cntrl Detail Shut Down Main Pump Associated With Affected Pipeline.
Downstream Action Taken Valve Closure
Downstream Valve Type Ind Manual
Notify Qualified Indiv Ind Yes
Oil Spill Removal Org Ind No
Num Pub Evacuated 0
Pipe Fac Name Southern Oklahoma
Segment Name Velma To Antioch
Onshore State Abbreviation Ok
Onshore Postal Code 73488
Onshore City Name Not Within A Municipality
Onshore County Name Stephens
Designated Location Milepost
Designated Name 7.112
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Exposed Due To Excavation
Depth Of Cover 3
Crossing Yes
Road Crossing Ind Yes
Road Type Uncased
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Body
Puddle Weld Ind No
Pipe Diameter 8
Pipe Wall Thickness 0.322
Pipe Smys 24000
Pipe Specification Unknown
Pipe Seam Type Erw � Unknown Frequency
Pipe Manufacturer Unknown
Pipe Coating Type Coal Tar
Coating Applied Ind Yes
Installation Year Unknown
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 1
Puncture Circum 1
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 5000
Est Cost Gas Released 270
Est Cost Prop Damage 36000
Est Cost Emergency 5000
Est Cost Environmental 3000
Est Cost Other 0
Prpty 49270
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 160
Mop Psig 250
Mop Cfr Section Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192
Maop Established Date 2014-04-03 00:00:00
Maop Reversal Flow Ind Bi-Directional
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function < 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The accident was caused by excavation damage by third party
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind No
State Law Exempt Ind No
Notify Cga Dirt Yes
Public Row Ind Yes
Public Subtype County Road
Joint Trench Ind No
Cross Bore Ind No
Depth Of Grade Measured Depth From Grade
Depth Of Grade Detail 3
Excavator Type County
Excavator Equipment Grader/scraper
Work Performed Grading
One Call Notified Ind No
Locator Type Facility Owner
Visible Marks No
Service Interruption Yes
Service Interruption Hours 31
Root Cause Category Notification Issue
Root Cause Type No Notification Made To The One-Call Center/811
Excvtn Dmg Third Party Ind Yes
Preparer Name B**** R*****
Preparer Title Pipeline Compliance Specialist
Preparer Email B******@c********.com
Preparer Telephone 4052500910
Prepared Date 2025-07-07 00:00:00
Local Contact Name B**** R*****
Local Contact Email B******@c********.com
Local Contact Telephone 4052500910
Authorizer Name B**** R*****
Authorizer Telephone 4052500910
Authorizer Title Pipeline Compliance Specialist
Authorizer Email B******@c********.com
Narrative At approximately 1300 hrs on may 19, 2025, a county road grader struck the velma to antioch pipeline while grading camelback road in stephens county oklahoma. The grader operator contacted coffeyville resources crude transportation, llc (crct) to notify of the strike. Crct personnel immediately shut the line down and responded to the downstream valve to close.

All rights reserved. Copyright © by ClearPHMSA