Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2025-06-05 — TX
Operator
Enterprise Products Operating Llc
Cause
Material Failure Of Pipe Or Weld
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$496,000
Incident datetime
2025-06-05 00:00 UTC
Report number
Location
TX
Narrative
On 5/7/2025 at 13:50 a third party notified enterprise that he observed bubbles in a field near the p2 pipeline right-of-way. Enterprise shut down the pipeline at 14:00 as a safety precaution and sent a technician to the site, who confirmed the presence of lel and also observed a small amount of diesel. Confirmed discovery was at 15:06. The incident was reported to the nrc due to repair costs expected to exceed $50,000. Metallurgical analysis confirmed a seam failure due to a lack of fusion defect. Nrc #1430497/1430499 48-hour update #1430635/1430643
Detailed record list
Report Received Date
2025-06-05 00:00:00
Iyear
2025
Report Number
20250141
Supplemental Number
41080
Report Type
Supplemental Final
Operator Id
31618
Name
Enterprise Products Operating Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
36.376667
Location Longitude
-90.431806
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Mixture Of Refined Products (Transmix Or Other Mixture)
Unintentional Release Bbls
1
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
No
Nrc Rpt Num
1430497
Additional Nrc Report Numbers
1430499, 1430635, 1430643
Ignite Ind
No
Upstream Action Taken
Operational Control
Upstream Oprtnl Cntrl Detail
Shut Down Pumps Upstream At Eldorado At 14:00.
Downstream Action Taken
Valve Closure
Downstream Valve Type Ind
Remotely Controlled
Notify Qualified Indiv Ind
No
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Beaumont To Lebanon Pipeline
Segment Name
P2
Onshore State Abbreviation
Ar
Onshore Postal Code
72422
Onshore City Name
Corning
Onshore County Name
Clay
Designated Location
Milepost
Designated Name
502.57
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
Unknown
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Seam
Pipe Diameter
20
Pipe Wall Thickness
0.312
Pipe Smys
35000
Pipe Specification
Api 5l Grade B
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Youngstown Sheet Tube
Pipe Coating Type
Coal Tar
Coating Applied Ind
Unknown
Installation Year
1944
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
Seam Failure
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
100
Est Cost Prop Damage
496000
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
496100
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
261
Mop Psig
690
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
1957-07-23 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Neither controller nor control room contributed to accident.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Metallurgical Ind
Yes
Failure Type
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Additional Lack Fusion Ind
Yes
Collected Data Ind
Yes
Cir Trn Wave Mgn Flx Lkg Ind
Yes
Ultrasonic Ind
Yes
Geometry Deformation Ind
Yes
Circ Wave Recent Year
2022
Circ Wv Rcnt Propul Method
Free Swimming
Circ Wv Rcnt Resolution
Standard Resolution
Circ Wv Previous Year
2017
Circ Wv Prev Propul Method
Free Swimming
Circ Wv Prev Resolution
Standard Resolution
Ultrasonic Recent Year
2017
Ultrasonic Rcnt Propul Method
Free Swimming
Ultrasonic Rcnt Attuned
Crack
Ultr Previous Year
2017
Ultra Prev Propul Method
Free Swimming
Ultra Prev Attuned
Crack
Geometry Recent Year
2022
Geometry Rcnt Propul Method
Free Swimming
Geometry Rcnt Resolution
Standard Resolution
Geometrt Rcnt Measur Cups
No Cups
Geometry Previous Year
2017
Geometry Prev Propul Method
Free Swimming
Geometry Prev Resolution
Standard Resolution
Geometrt Prev Measur Cups
No Cups
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
T****** A* G********
Preparer Title
Senior Staff Pipeline Compliance Engineer
Preparer Email
T**********@e****.com
Preparer Telephone
713-381-6433
Prepared Date
2025-06-26 00:00:00
Local Contact Name
T****** G********
Local Contact Email
Senior Staff Pipeline Compliance Engineer
Local Contact Telephone
713-381-6433
Authorizer Name
T****** A* G********
Authorizer Telephone
713-381-6433
Authorizer Title
Senior Staff Pipeline Compliance Engineer
Authorizer Email
T**********@e****.com
Narrative
On 5/7/2025 at 13:50 a third party notified enterprise that he observed bubbles in a field near the p2 pipeline right-of-way. Enterprise shut down the pipeline at 14:00 as a safety precaution and sent a technician to the site, who confirmed the presence of lel and also observed a small amount of diesel. Confirmed discovery was at 15:06. The incident was reported to the nrc due to repair costs expected to exceed $50,000. Metallurgical analysis confirmed a seam failure due to a lack of fusion defect. Nrc #1430497/1430499 48-hour update #1430635/1430643
Report Received Date | 2025-06-05 00:00:00 |
---|---|
Iyear | 2025 |
Report Number | 20250141 |
Supplemental Number | 41080 |
Report Type | Supplemental Final |
Operator Id | 31618 PHMSA Enforcement |
Name | Enterprise Products Operating Llc |
Operator Street Address | 1100 Louisiana Street |
Operator City Name | Houston |
Operator State Abbreviation | TX |
Operator Postal Code | 77002 |
Time Zone | Central |
Daylight Savings Ind | Yes |
Location Latitude | 36.376667 Google Maps OpenStreetMap |
Location Longitude | -90.431806 Google Maps OpenStreetMap |
Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
Commodity Subtype | Mixture Of Refined Products (Transmix Or Other Mixture) |
Unintentional Release Bbls | 1 |
Recovered Bbls | 0 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Notification From Public |
System Part Involved | Onshore Pipeline, Including Valve Sites |
On Off Shore | Onshore |
Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
Shutdown Due Accident Ind | Yes |
Communication State Fed Ind | No |
Nrc Rpt Num | 1430497 NRC Report How to search |
Additional Nrc Report Numbers | 1430499, 1430635, 1430643 |
Ignite Ind | No |
Upstream Action Taken | Operational Control |
Upstream Oprtnl Cntrl Detail | Shut Down Pumps Upstream At Eldorado At 14:00. |
Downstream Action Taken | Valve Closure |
Downstream Valve Type Ind | Remotely Controlled |
Notify Qualified Indiv Ind | No |
Oil Spill Removal Org Ind | No |
Num Pub Evacuated | 0 |
Pipe Fac Name | Beaumont To Lebanon Pipeline |
Segment Name | P2 |
Onshore State Abbreviation | Ar |
Onshore Postal Code | 72422 |
Onshore City Name | Corning |
Onshore County Name | Clay |
Designated Location | Milepost |
Designated Name | 502.57 |
Federal | No |
Location Type | Pipeline Right-Of-Way |
Incident Area Type | Underground |
Incident Area Subtype | Under Soil |
Depth Of Cover | Unknown |
Crossing | No |
Pipe Facility Type | Interstate |
Item Involved | Pipe |
Pipe Type | Pipe Seam |
Pipe Diameter | 20 |
Pipe Wall Thickness | 0.312 |
Pipe Smys | 35000 |
Pipe Specification | Api 5l Grade B |
Pipe Seam Type | Erw - High Frequency |
Pipe Manufacturer | Youngstown Sheet Tube |
Pipe Coating Type | Coal Tar |
Coating Applied Ind | Unknown |
Installation Year | 1944 |
Manufactured Year | Unknown |
Material Involved | Carbon Steel |
Release Type | Leak |
Leak Type | Other |
Leak Type Other | Seam Failure |
Wildlife Impact Ind | No |
Soil Contamination | No |
Long Term Assessment | No |
Remediation Ind | No |
Water Contam Ind | No |
Could Be Hca | No |
Commodity Reached Hca | No |
Est Cost Oper Paid | 0 |
Est Cost Gas Released | 100 |
Est Cost Prop Damage | 496000 |
Est Cost Emergency | 0 |
Est Cost Environmental | 0 |
Est Cost Other | 0 |
Prpty | 496100 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 261 |
Mop Psig | 690 |
Mop Cfr Section | Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192 |
Maop Established Date | 1957-07-23 00:00:00 |
Maop Reversal Flow Ind | No |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Internal Inspection Ind | Yes |
Operation Complications Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Cpm In Place Ind | Yes |
Cpm Operating Ind | Yes |
Cpm Functional Ind | Yes |
Cpm Detection Ind | No |
Cpm Conf Ind | No |
Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
Investigation Status Details | Neither controller nor control room contributed to accident. |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Material Failure Of Pipe Or Weld |
Cause Details | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
Metallurgical Ind | Yes |
Failure Type | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
Additional Lack Fusion Ind | Yes |
Collected Data Ind | Yes |
Cir Trn Wave Mgn Flx Lkg Ind | Yes |
Ultrasonic Ind | Yes |
Geometry Deformation Ind | Yes |
Circ Wave Recent Year | 2022 |
Circ Wv Rcnt Propul Method | Free Swimming |
Circ Wv Rcnt Resolution | Standard Resolution |
Circ Wv Previous Year | 2017 |
Circ Wv Prev Propul Method | Free Swimming |
Circ Wv Prev Resolution | Standard Resolution |
Ultrasonic Recent Year | 2017 |
Ultrasonic Rcnt Propul Method | Free Swimming |
Ultrasonic Rcnt Attuned | Crack |
Ultr Previous Year | 2017 |
Ultra Prev Propul Method | Free Swimming |
Ultra Prev Attuned | Crack |
Geometry Recent Year | 2022 |
Geometry Rcnt Propul Method | Free Swimming |
Geometry Rcnt Resolution | Standard Resolution |
Geometrt Rcnt Measur Cups | No Cups |
Geometry Previous Year | 2017 |
Geometry Prev Propul Method | Free Swimming |
Geometry Prev Resolution | Standard Resolution |
Geometrt Prev Measur Cups | No Cups |
Has Hydrtst Conduc Before Ind | No |
Direct Asmnt Conducted | No |
Non Destructive Exam Ind | No |
Preparer Name | T****** A* G******** |
Preparer Title | Senior Staff Pipeline Compliance Engineer |
Preparer Email | T**********@e****.com |
Preparer Telephone | 713-381-6433 |
Prepared Date | 2025-06-26 00:00:00 |
Local Contact Name | T****** G******** |
Local Contact Email | Senior Staff Pipeline Compliance Engineer |
Local Contact Telephone | 713-381-6433 |
Authorizer Name | T****** A* G******** |
Authorizer Telephone | 713-381-6433 |
Authorizer Title | Senior Staff Pipeline Compliance Engineer |
Authorizer Email | T**********@e****.com |
Narrative | On 5/7/2025 at 13:50 a third party notified enterprise that he observed bubbles in a field near the p2 pipeline right-of-way. Enterprise shut down the pipeline at 14:00 as a safety precaution and sent a technician to the site, who confirmed the presence of lel and also observed a small amount of diesel. Confirmed discovery was at 15:06. The incident was reported to the nrc due to repair costs expected to exceed $50,000. Metallurgical analysis confirmed a seam failure due to a lack of fusion defect. Nrc #1430497/1430499 48-hour update #1430635/1430643 |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA