HL incident on 2025-05-30 — OK

Operator
Oneok Ngl Pipeline, Llc
Cause
Equipment Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$780
Incident datetime
2025-05-30 00:00 UTC
Report number
Location
OK
Narrative
At 4:25am on may 2, 2025, pipeline control received a call from a oneok plant operator indicating a release from a psv on the arbuckle ii prover. At 4:53am a oneok pipeline operator isolated the psv stopping the release. The cause of the psv failure is under investigation supplemental- investigation results indicate the psv released at 1,329 psi. It failed to re-seat due to damage to the stem and sealing surface of the psv and continued to release until manually isolated.
Detailed record list
Report Received Date
2025-05-30 00:00:00
Iyear
2025
Report Number
20250135
Supplemental Number
41093
Report Type
Supplemental Final
Operator Id
Name
Oneok Ngl Pipeline, Llc
Operator Street Address
100 West Fifth Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls
306
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Able To Isolate The Prover And Manually Block In Psv 1/2 Inch Root Valve
Communication State Fed Ind
No
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Medford Arbuckle 2 Pump Station
Segment Name
Site 799
Onshore State Abbreviation
Ok
Onshore Postal Code
73759
Onshore City Name
Medford
Onshore County Name
Grant
Designated Location
Survey Station No.
Designated Name
0+00
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Relief Line And Relief Equipment
Installation Year
2025
Manufactured Year
2020
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
1/2 Inch Psv Failure
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
9180
Est Cost Prop Damage
780
Est Cost Emergency
600
Est Cost Environmental
0
Est Cost Other
0
Prpty
10560
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
1329
Mop Psig
1480
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2020-03-18 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest Incorrect Action Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
2
Num Employees Failed
0
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Relief Valve Ind
Yes
Eq Additional Other Ind
Yes
Eq Additional Other Details
Cause Of Psv Release Still Under Investigation
Preparer Name
G*** C*********
Preparer Email
G**************@o****.com
Preparer Telephone
9183818066
Prepared Date
2025-07-01 00:00:00
Local Contact Name
R*** M****
Local Contact Email
R*********@o****.com
Local Contact Telephone
5807410185
Authorizer Name
R*** M****
Authorizer Telephone
9183818066
Authorizer Title
Regulatory Compliance Manager
Authorizer Email
G**************@o****.com
Narrative
At 4:25am on may 2, 2025, pipeline control received a call from a oneok plant operator indicating a release from a psv on the arbuckle ii prover. At 4:53am a oneok pipeline operator isolated the psv stopping the release. The cause of the psv failure is under investigation supplemental- investigation results indicate the psv released at 1,329 psi. It failed to re-seat due to damage to the stem and sealing surface of the psv and continued to release until manually isolated.
Report Received Date 2025-05-30 00:00:00
Iyear 2025
Report Number 20250135
Supplemental Number 41093
Report Type Supplemental Final
Operator Id 32109 PHMSA Enforcement
Name Oneok Ngl Pipeline, Llc
Operator Street Address 100 West Fifth Street
Operator City Name Tulsa
Operator State Abbreviation OK
Operator Postal Code 74103
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 36.77511 Google Maps OpenStreetMap
Location Longitude -97.76291 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls 306
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind No
Shutdown Explain Able To Isolate The Prover And Manually Block In Psv 1/2 Inch Root Valve
Communication State Fed Ind No
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Num Pub Evacuated 0
Pipe Fac Name Medford Arbuckle 2 Pump Station
Segment Name Site 799
Onshore State Abbreviation Ok
Onshore Postal Code 73759
Onshore City Name Medford
Onshore County Name Grant
Designated Location Survey Station No.
Designated Name 0+00
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Relief Line And Relief Equipment
Installation Year 2025
Manufactured Year 2020
Material Involved Carbon Steel
Release Type Leak
Leak Type Other
Leak Type Other 1/2 Inch Psv Failure
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
Usa Ecological Ind Yes
Usa Ecological Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 9180
Est Cost Prop Damage 780
Est Cost Emergency 600
Est Cost Environmental 0
Est Cost Other 0
Prpty 10560
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 1329
Mop Psig 1480
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 2020-03-18 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind Yes
Invest No Control Room Ind Yes
Invest Incorrect Action Ind Yes
Employee Drug Test Ind Yes
Contractor Drug Test Ind No
Num Employees Tested 2
Num Employees Failed 0
Cause Equipment Failure
Cause Details Malfunction Of Control/relief Equipment
Eq Failure Type Malfunction Of Control/relief Equipment
Relief Valve Ind Yes
Eq Additional Other Ind Yes
Eq Additional Other Details Cause Of Psv Release Still Under Investigation
Preparer Name G*** C*********
Preparer Email G**************@o****.com
Preparer Telephone 9183818066
Prepared Date 2025-07-01 00:00:00
Local Contact Name R*** M****
Local Contact Email R*********@o****.com
Local Contact Telephone 5807410185
Authorizer Name R*** M****
Authorizer Telephone 9183818066
Authorizer Title Regulatory Compliance Manager
Authorizer Email G**************@o****.com
Narrative At 4:25am on may 2, 2025, pipeline control received a call from a oneok plant operator indicating a release from a psv on the arbuckle ii prover. At 4:53am a oneok pipeline operator isolated the psv stopping the release. The cause of the psv failure is under investigation supplemental- investigation results indicate the psv released at 1,329 psi. It failed to re-seat due to damage to the stem and sealing surface of the psv and continued to release until manually isolated.

All rights reserved. Copyright © by ClearPHMSA