HL incident on 2025-05-20 — GA

Operator
Colonial Pipeline Co
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2025-05-20 00:00 UTC
Report number
Location
GA
Narrative
During a yard check, a houston operator identified a gasoline release originating from the peeco flow switch on the line 01 pasadena incoming relief system at houston station. The line was shut down, relief switch was isolated, and response personnel were activated. The peeco paddle switch located upstream of the relief valves was removed, plugged, and technicians cut over to a magnatrol thermal dispersion switch located downstream of the relief valves (moc-2025-224). The line was restarted 08:11 plt while environmental remediation of the impacted area continued. Nrc report was made at 05:54 after discovery that response costs would exceed $50,000 at 05:12.
Detailed record list
Report Received Date
2025-05-20 00:00:00
Iyear
2025
Report Number
20250126
Supplemental Number
40906
Report Type
Original Final
Operator Id
Name
Colonial Pipeline Co
Operator Street Address
1000 Lake St.
Operator City Name
Alpharetta
Operator State Abbreviation
GA
Operator Postal Code
30009
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
-95.17919497
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
22
Recovered Bbls
9
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
No
Nrc Rpt Num
Additional Nrc Report Numbers
1429283
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Type Ind
Manual
Downstream Action Taken
Valve Closure
Downstream Valve Type Ind
Automatic
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
Yes
Osro Arrived On Site Dt
4/22/2025 6:31
Num Pub Evacuated
0
Pipe Fac Name
Houston Station
Segment Name
Unit 2294
Onshore State Abbreviation
Tx
Onshore Postal Code
77506
Onshore City Name
Pasadena
Onshore County Name
Harris
Designated Location
Survey Station No.
Designated Name
120
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Relief Line And Relief Equipment
Installation Year
2022
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Circumferential
Rupture Width
1
Rupture Length
1
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
27
Est Cost Prop Damage
0
Est Cost Emergency
45000
Est Cost Environmental
10000
Est Cost Other
0
Prpty
55027
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
76
Mop Psig
275
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
1963-10-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
8
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Equipment failure
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Instrumentation Ind
Yes
Additional Vibration Ind
Yes
Preparer Name
R***** D*****
Preparer Title
Sr Compliance Specialist
Preparer Email
R******@c******.com
Preparer Telephone
4097904288
Prepared Date
2025-05-20 00:00:00
Authorizer Name
Q****** F******
Authorizer Telephone
7706879672
Authorizer Email
Q*******@c******.com
Narrative
During a yard check, a houston operator identified a gasoline release originating from the peeco flow switch on the line 01 pasadena incoming relief system at houston station. The line was shut down, relief switch was isolated, and response personnel were activated. The peeco paddle switch located upstream of the relief valves was removed, plugged, and technicians cut over to a magnatrol thermal dispersion switch located downstream of the relief valves (moc-2025-224). The line was restarted 08:11 plt while environmental remediation of the impacted area continued. Nrc report was made at 05:54 after discovery that response costs would exceed $50,000 at 05:12.
Report Received Date 2025-05-20 00:00:00
Iyear 2025
Report Number 20250126
Supplemental Number 40906
Report Type Original Final
Operator Id 2552 PHMSA Enforcement
Name Colonial Pipeline Co
Operator Street Address 1000 Lake St.
Operator City Name Alpharetta
Operator State Abbreviation GA
Operator Postal Code 30009
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 29.71901833 Google Maps OpenStreetMap
Location Longitude -95.17919497 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Gasoline (Non-Ethanol)
Unintentional Release Bbls 22
Recovered Bbls 9
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Communication State Fed Ind No
Nrc Rpt Num 1429106 NRC Report How to search
Additional Nrc Report Numbers 1429283
Ignite Ind No
Upstream Action Taken Valve Closure
Upstream Valve Type Ind Manual
Downstream Action Taken Valve Closure
Downstream Valve Type Ind Automatic
Notify Qualified Indiv Ind Yes
Oil Spill Removal Org Ind Yes
Osro Arrived On Site Dt 4/22/2025 6:31
Num Pub Evacuated 0
Pipe Fac Name Houston Station
Segment Name Unit 2294
Onshore State Abbreviation Tx
Onshore Postal Code 77506
Onshore City Name Pasadena
Onshore County Name Harris
Designated Location Survey Station No.
Designated Name 120
Federal No
Location Type Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Relief Line And Relief Equipment
Installation Year 2022
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Rupture
Rupture Orient Circumferential
Rupture Width 1
Rupture Length 1
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
Other Pop Ind Yes
Other Pop Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 27
Est Cost Prop Damage 0
Est Cost Emergency 45000
Est Cost Environmental 10000
Est Cost Other 0
Prpty 55027
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 76
Mop Psig 275
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 1963-10-01 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 8
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Equipment failure
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Malfunction Of Control/relief Equipment
Eq Failure Type Malfunction Of Control/relief Equipment
Instrumentation Ind Yes
Additional Vibration Ind Yes
Preparer Name R***** D*****
Preparer Title Sr Compliance Specialist
Preparer Email R******@c******.com
Preparer Telephone 4097904288
Prepared Date 2025-05-20 00:00:00
Authorizer Name Q****** F******
Authorizer Telephone 7706879672
Authorizer Email Q*******@c******.com
Narrative During a yard check, a houston operator identified a gasoline release originating from the peeco flow switch on the line 01 pasadena incoming relief system at houston station. The line was shut down, relief switch was isolated, and response personnel were activated. The peeco paddle switch located upstream of the relief valves was removed, plugged, and technicians cut over to a magnatrol thermal dispersion switch located downstream of the relief valves (moc-2025-224). The line was restarted 08:11 plt while environmental remediation of the impacted area continued. Nrc report was made at 05:54 after discovery that response costs would exceed $50,000 at 05:12.