Incident details
Operator, cause, commodity and consequences with raw source fields.
GTG incident on 2025-09-10 — MI
Operator
Consumers Energy Co
Cause
Other Incident Cause
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$172,382
Incident datetime
2025-09-10 08:49
Report number
Location
MI
Narrative
On september 10, 2025, at approximately 08:49, a consumers energy employee investigating a potential leak indication confirmed the presence of a leak on line 2600 near the johnson road valve site. Line 2600 is a 12-inch natural gas transmission pipeline located in lake city, michigan (missaukee county). Consumers energy promptly initiated an isolation procedure to further assess the situation. The affected section of line 2600 was successfully isolated and vented to 0 psig by approximately 16:46 the same day. Following excavation, the leak was discovered on a 12-inch ball valve (valve 2622). The valve was preserved in accordance with consumers energy�s failure investigation procedures and transported to the company�s laboratory for analysis. The incident response and remediation efforts were conducted without injury to the public or operating personnel. Remediation activities commenced on september 10, 2025. The scope of work included replacement of the 12-inch ball valve and approximately 9-feet of pipeline. The pipeline segment was returned to service on september 23, 2025. Further analysis of the failed valve is ongoing to determine the root cause of the failure.
Detailed record list
Report Received Date
2025-10-10 00:00:00
Iyear
2025
Report Number
20250113
Supplemental Number
41451
Report Type
Original
Operator Id
2748
Name
Consumers Energy Co
Operator Street Address
One Energy Plaza
Operator City Name
Jackson
Operator State Abbreviation
MI
Operator Postal Code
49201
Local Datetime
2025-09-10 08:49:00
Time Zone
Eastern
Daylight Savings Ind
Yes
Location Latitude
44.48038
Location Longitude
-85.05259
Nrc Rpt Num
1442442
Nrc Rpt Datetime
2025-09-10 10:39:00
Additional Nrc Report Numbers
1442589
Commodity Released Type
Natural Gas
Unintentional Release
0.59
Intentional Release
3850
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2025-09-10 16:46:00
Restart Datetime
2025-09-23 16:30:00
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Initial Responder Com Datetime
2025-09-10 12:55:00
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Close Datetime
2025-09-10 12:27:00
Downstream Action Taken
Valve Closure
Downstream Vlv Close Datetime
2025-09-10 11:35:00
Num Pub Evacuated
0
Incident Identified Datetime
2025-09-10 08:49:00
On Site Datetime
2025-09-10 08:49:00
Confirmed Discovery Datetime
2025-09-10 08:49:00
On Off Shore
Onshore
Onshore State Abbreviation
Mi
Onshore Postal Code
49651
Onshore City Name
Lake City
Onshore County Name
Missaukee
Designated Location
Not Applicable
Pipe Fac Name
Line 2600
Segment Name
Valve 2622
Federal
No
Location Type
Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
53
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Intrastate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Valve
Valve Type
Mainline
Valve Mainline Type
Ball
Valve Manufacturer
T.k. Cameron
Installation Year
1979
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
285
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
2
Est Cost Intentional Release
10665
Est Cost Prop Damage
172382
Est Cost Emergency
11384
Est Cost Other
0
Gas Cost In Mcf
2.77
Prpty
194433
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
743
Gas Flow In Pipe In Mcf
30.37
Mop Psig
1185
Mop Cfr Section
192.619(A)(2)
Maop Established Date
1979-11-03 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
95040
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Scada alarms were not triggered due to the limited size of the leak/release. As a result, a control room investigation was not needed.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Incident Cause
Cause Details
Unknown
Other Type
Unknown
Unknown Subtype
Still Under Investigation, Cause Of Incident To Be Determined* (*supplemental Report Required)
Preparer Name
C******* K***
Preparer Title
Principal Engineering Technical Analyst
Preparer Email
C************@c********.com
Preparer Telephone
9892802963
Local Contact Name
C******* K***
Local Contact Email
C************@c********.com
Local Contact Telephone
9892802963
Authorizer Name
R**** J* F*****
Authorizer Title
Gas Compliance Manager
Authorizer Telephone
5173758565
Authorizer Email
R***********@c********.com
Narrative
On september 10, 2025, at approximately 08:49, a consumers energy employee investigating a potential leak indication confirmed the presence of a leak on line 2600 near the johnson road valve site. Line 2600 is a 12-inch natural gas transmission pipeline located in lake city, michigan (missaukee county). Consumers energy promptly initiated an isolation procedure to further assess the situation. The affected section of line 2600 was successfully isolated and vented to 0 psig by approximately 16:46 the same day. Following excavation, the leak was discovered on a 12-inch ball valve (valve 2622). The valve was preserved in accordance with consumers energy�s failure investigation procedures and transported to the company�s laboratory for analysis. The incident response and remediation efforts were conducted without injury to the public or operating personnel. Remediation activities commenced on september 10, 2025. The scope of work included replacement of the 12-inch ball valve and approximately 9-feet of pipeline. The pipeline segment was returned to service on september 23, 2025. Further analysis of the failed valve is ongoing to determine the root cause of the failure.
| Report Received Date | 2025-10-10 00:00:00 |
|---|---|
| Iyear | 2025 |
| Report Number | 20250113 |
| Supplemental Number | 41451 |
| Report Type | Original |
| Operator Id | 2748 PHMSA Enforcement |
| Name | Consumers Energy Co |
| Operator Street Address | One Energy Plaza |
| Operator City Name | Jackson |
| Operator State Abbreviation | MI |
| Operator Postal Code | 49201 |
| Local Datetime | 2025-09-10 08:49:00 |
| Time Zone | Eastern |
| Daylight Savings Ind | Yes |
| Location Latitude | 44.48038 Google Maps OpenStreetMap |
| Location Longitude | -85.05259 Google Maps OpenStreetMap |
| Nrc Rpt Num | 1442442 NRC Report How to search |
| Nrc Rpt Datetime | 2025-09-10 10:39:00 |
| Additional Nrc Report Numbers | 1442589 |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 0.59 |
| Intentional Release | 3850 |
| Accompanying Liquid | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Status When Identified | Normal Operation, Includes Pauses During Maintenance |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2025-09-10 16:46:00 |
| Restart Datetime | 2025-09-23 16:30:00 |
| Communication State Fed Ind | Yes |
| Party Initiated Communication | Operator |
| Initial Responder Com Datetime | 2025-09-10 12:55:00 |
| Ignite Ind | No |
| Upstream Action Taken | Valve Closure |
| Upstream Valve Close Datetime | 2025-09-10 12:27:00 |
| Downstream Action Taken | Valve Closure |
| Downstream Vlv Close Datetime | 2025-09-10 11:35:00 |
| Num Pub Evacuated | 0 |
| Incident Identified Datetime | 2025-09-10 08:49:00 |
| On Site Datetime | 2025-09-10 08:49:00 |
| Confirmed Discovery Datetime | 2025-09-10 08:49:00 |
| On Off Shore | Onshore |
| Onshore State Abbreviation | Mi |
| Onshore Postal Code | 49651 |
| Onshore City Name | Lake City |
| Onshore County Name | Missaukee |
| Designated Location | Not Applicable |
| Pipe Fac Name | Line 2600 |
| Segment Name | Valve 2622 |
| Federal | No |
| Location Type | Operator-Controlled Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 53 |
| Other Underground Facilities | No |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| Item Involved | Valve |
| Valve Type | Mainline |
| Valve Mainline Type | Ball |
| Valve Manufacturer | T.k. Cameron |
| Installation Year | 1979 |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Class Location Type | Class 1 Location |
| Could Be Hca | No |
| Pir Radius | 285 |
| Heat Damage Ind | No |
| Non Heat Damage Ind | No |
| Did Occur In Mca Ind | No |
| Est Cost Oper Paid | 0 |
| Est Cost Unintentional Release | 2 |
| Est Cost Intentional Release | 10665 |
| Est Cost Prop Damage | 172382 |
| Est Cost Emergency | 11384 |
| Est Cost Other | 0 |
| Gas Cost In Mcf | 2.77 |
| Prpty | 194433 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Wildlife Impact Ind | No |
| Accident Psig | 743 |
| Gas Flow In Pipe In Mcf | 30.37 |
| Mop Psig | 1185 |
| Mop Cfr Section | 192.619(A)(2) View CFR 49 §192 |
| Maop Established Date | 1979-11-03 00:00:00 |
| Maop Reversal Flow Ind | No |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Pressure Restriction Ind | No |
| Gas Required Odorized Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Length Segment Isolated | 95040 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | Transmission System |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Scada alarms were not triggered due to the limited size of the leak/release. As a result, a control room investigation was not needed. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Other Incident Cause |
| Cause Details | Unknown |
| Other Type | Unknown |
| Unknown Subtype | Still Under Investigation, Cause Of Incident To Be Determined* (*supplemental Report Required) |
| Preparer Name | C******* K*** |
| Preparer Title | Principal Engineering Technical Analyst |
| Preparer Email | C************@c********.com |
| Preparer Telephone | 9892802963 |
| Local Contact Name | C******* K*** |
| Local Contact Email | C************@c********.com |
| Local Contact Telephone | 9892802963 |
| Authorizer Name | R**** J* F***** |
| Authorizer Title | Gas Compliance Manager |
| Authorizer Telephone | 5173758565 |
| Authorizer Email | R***********@c********.com |
| Narrative | On september 10, 2025, at approximately 08:49, a consumers energy employee investigating a potential leak indication confirmed the presence of a leak on line 2600 near the johnson road valve site. Line 2600 is a 12-inch natural gas transmission pipeline located in lake city, michigan (missaukee county). Consumers energy promptly initiated an isolation procedure to further assess the situation. The affected section of line 2600 was successfully isolated and vented to 0 psig by approximately 16:46 the same day. Following excavation, the leak was discovered on a 12-inch ball valve (valve 2622). The valve was preserved in accordance with consumers energy�s failure investigation procedures and transported to the company�s laboratory for analysis. The incident response and remediation efforts were conducted without injury to the public or operating personnel. Remediation activities commenced on september 10, 2025. The scope of work included replacement of the 12-inch ball valve and approximately 9-feet of pipeline. The pipeline segment was returned to service on september 23, 2025. Further analysis of the failed valve is ongoing to determine the root cause of the failure. |