Incident details
Operator, cause, commodity and consequences with raw source fields.
GTG incident on 2025-09-12 — WV
Operator
Eastern Gas Transmission And Storage, Inc.
Cause
Corrosion Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$36,000
Incident datetime
2025-09-12 19:32
Report number
Location
WV
Narrative
On 9/12/2025 at approximately 19:32, up-24 ruptured at station 125+05 near the drip and launcher / receiver at the uw-204 well pad in forbes state forest which is located west of farmington, pa in fayette county. Gas control received initial indication of the rupture from scada pressure drop alarms on up-2, up-5, and up-7 at 19:32. Up-24 is an 8 inch diameter transmission pipeline in storage function approximately 2.3 miles long and transports gas between other transmission pipelines in storage function and uw-204 which is an underground storage well in north summit storage. The maximum allowable operating pressure of up-24 is 3377 psig. Up-24 was in normal operation with an operating pressure of 3176 psig and no flow when the incident occurred. At approximately 20:20, operations personnel called gas control and confirmed that natural gas was blowing in north summit storage. Fayette county 911 called gas control at approximately 20:31 and provided a similar notification. Operations personnel manually closed valve up-24 upstream of up-24 at approximately 20:55 and manually closed the master gate valve and lead lines on uw-204 downstream of up-24 at approximately 21:20 to complete the isolation of up-24. Gas control also initiated commands to remotely close valves up-5 and up-116 to support the isolation of up-24 at approximately 20:57. Gas ceased blowing from up-24 at approximately 21:29. The rupture resulted in the longitudinal and then circumferential failure of pipe going to the drip; an approximately 25 ft by 30 ft hole in the ground approximately 12 ft to 15 ft deep; approximately 14 ft of pipe folding up and coming out of the ground; approximately 1.5 ft of pipe being ejected approximately 73 ft away from the hole; damage to the drip and associated piping; damage to the launcher / receiver and associated piping; damage to a nearby aboveground brine storage tank at the uw-204 well pad and associated piping; approximately 26,067 mcf gas loss from up-24; approximately 3,092 mcf of gas loss from uw-204; and approximately 0.05 barrels of brine spilled to the ground. The gas did not ignite and there were no fires, injuries, fatalities, or evacuations. Initial notification (#1442611) was made to the nrc on 9/12/2025 at 20:45. Follow up notification (#1442677) was made to the nrc on 9/13/2025 at 20:50. The isolation of up-24 remains in effect until the following remediation actions are completed: the section of up-24 containing the rupture is replaced; the drip and associated piping are replaced; the launcher / receiver and associated piping are replaced; and the nearby aboveground brine storage tank and associated piping are replaced. Cleanup of the soil where the brine spilled was completed. Four pieces of up-24 pipe were cut-out at the rupture and were sent to kiefner & associates for failure analysis. The failure analysis report from kiefner is pending, but the preliminary indication is that internal corrosion was the apparent cause. As a precautionary measure, the integrity of the uw-204 wellhead and annular vent were inspected and it was confirmed that uw-204 can be safely returned to service once the remediation actions for up-24 are completed and up-24 is returned to service. A supplemental incident report will be submitted once up-24 is returned to service.
Detailed record list
Report Received Date
2025-10-10 00:00:00
Iyear
2025
Report Number
20250111
Supplemental Number
41446
Report Type
Original
Operator Id
2714
Name
Eastern Gas Transmission And Storage, Inc.
Operator Street Address
925 White Oaks Boulevard
Operator City Name
Bridgeport
Operator State Abbreviation
WV
Operator Postal Code
26330
Local Datetime
2025-09-12 19:32:00
Time Zone
Eastern
Daylight Savings Ind
Yes
Location Latitude
39.79298
Location Longitude
-79.69054
Nrc Rpt Num
1442611
Nrc Rpt Datetime
2025-09-12 20:45:00
Additional Nrc Report Numbers
1442677
Commodity Released Type
Natural Gas
Unintentional Release
29159
Intentional Release
0
Accompanying Liquid
0.05
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2025-09-12 21:20:00
Still Shutdown Ind
Yes
Communication State Fed Ind
Yes
Party Initiated Communication
Local/state/federal Emergency Responder
Initial Responder Com Datetime
2025-09-12 20:31:00
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Close Datetime
2025-09-12 20:55:00
Downstream Action Taken
Valve Closure
Downstream Vlv Close Datetime
2025-09-12 21:20:00
Num Pub Evacuated
0
Incident Identified Datetime
2025-09-12 19:32:00
On Site Datetime
2025-09-12 21:15:00
Confirmed Discovery Datetime
2025-09-12 20:20:00
On Off Shore
Onshore
Onshore State Abbreviation
Pa
Onshore Postal Code
15437
Onshore City Name
Not Within A Municipality
Onshore County Name
Fayette
Designated Location
Survey Station No.
Designated Name
125+05
Pipe Fac Name
Up-24
Segment Name
Up-24/1a
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
36
Other Underground Facilities
Yes
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8
Puddle Weld Ind
No
Pipe Wall Thickness
0.375
Pipe Smys
65000
Pipe Specification
Api 5l X65
Pipe Seam Type
Longitudinal Erw - High Frequency
Pipe Manufacturer
U.s. Steel Corporation
Pipe Coating Type
Epoxy
Coating Applied Ind
Yes
Installation Year
1998
Manufactured Year
1998
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Longitudinal
Rupture Length
16
Rupture Width
8
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
361
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
83395
Est Cost Intentional Release
0
Est Cost Prop Damage
36000
Est Cost Emergency
5000
Est Cost Other
60000
Est Cost Other Details
Failure Analysis
Gas Cost In Mcf
2.86
Prpty
184395
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
3176
Gas Flow In Pipe In Mcf
0
Mop Psig
3377
Mop Cfr Section
192.619(A)(2)
Maop Established Date
1999-11-12 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
9325
Internal Inspection Ind
No
Other Inspection Ind
Yes
Internal Inspection Details
The Incident Occurred On A Short Section Of Pipe Between The Up-24 Mainline Pipe And A Drip. The Up-24 Pipeline Is Configured To Accommodate Internal Inspection Tools.
Operation Complications Ind
Yes
Other Complications Ind
Yes
Inspect Comp Details
See Response For Item E7.
Pipeline Function
Transmission In Storage Field
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Accident Identifier
Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Water Acid Ind
Yes
Int Field Exam Basis Ind
Yes
Int Metallurgical Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Int Drop Out Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Pwf Design Ind
Yes
Pwf Construction Ind
Yes
Preparer Name
D** S****
Preparer Title
Pipeline Integrity Engineer
Preparer Email
D***********@b*****.com
Preparer Telephone
6818423365
Local Contact Name
J***** C****
Local Contact Email
J***********@b*****.com
Local Contact Telephone
7249531696
Authorizer Name
K*** W******
Authorizer Title
Manager - Pipeline Integrity
Authorizer Telephone
3048412365
Authorizer Email
K***********@b*****.com
Narrative
On 9/12/2025 at approximately 19:32, up-24 ruptured at station 125+05 near the drip and launcher / receiver at the uw-204 well pad in forbes state forest which is located west of farmington, pa in fayette county. Gas control received initial indication of the rupture from scada pressure drop alarms on up-2, up-5, and up-7 at 19:32. Up-24 is an 8 inch diameter transmission pipeline in storage function approximately 2.3 miles long and transports gas between other transmission pipelines in storage function and uw-204 which is an underground storage well in north summit storage. The maximum allowable operating pressure of up-24 is 3377 psig. Up-24 was in normal operation with an operating pressure of 3176 psig and no flow when the incident occurred. At approximately 20:20, operations personnel called gas control and confirmed that natural gas was blowing in north summit storage. Fayette county 911 called gas control at approximately 20:31 and provided a similar notification. Operations personnel manually closed valve up-24 upstream of up-24 at approximately 20:55 and manually closed the master gate valve and lead lines on uw-204 downstream of up-24 at approximately 21:20 to complete the isolation of up-24. Gas control also initiated commands to remotely close valves up-5 and up-116 to support the isolation of up-24 at approximately 20:57. Gas ceased blowing from up-24 at approximately 21:29. The rupture resulted in the longitudinal and then circumferential failure of pipe going to the drip; an approximately 25 ft by 30 ft hole in the ground approximately 12 ft to 15 ft deep; approximately 14 ft of pipe folding up and coming out of the ground; approximately 1.5 ft of pipe being ejected approximately 73 ft away from the hole; damage to the drip and associated piping; damage to the launcher / receiver and associated piping; damage to a nearby aboveground brine storage tank at the uw-204 well pad and associated piping; approximately 26,067 mcf gas loss from up-24; approximately 3,092 mcf of gas loss from uw-204; and approximately 0.05 barrels of brine spilled to the ground. The gas did not ignite and there were no fires, injuries, fatalities, or evacuations. Initial notification (#1442611) was made to the nrc on 9/12/2025 at 20:45. Follow up notification (#1442677) was made to the nrc on 9/13/2025 at 20:50. The isolation of up-24 remains in effect until the following remediation actions are completed: the section of up-24 containing the rupture is replaced; the drip and associated piping are replaced; the launcher / receiver and associated piping are replaced; and the nearby aboveground brine storage tank and associated piping are replaced. Cleanup of the soil where the brine spilled was completed. Four pieces of up-24 pipe were cut-out at the rupture and were sent to kiefner & associates for failure analysis. The failure analysis report from kiefner is pending, but the preliminary indication is that internal corrosion was the apparent cause. As a precautionary measure, the integrity of the uw-204 wellhead and annular vent were inspected and it was confirmed that uw-204 can be safely returned to service once the remediation actions for up-24 are completed and up-24 is returned to service. A supplemental incident report will be submitted once up-24 is returned to service.
| Report Received Date | 2025-10-10 00:00:00 |
|---|---|
| Iyear | 2025 |
| Report Number | 20250111 |
| Supplemental Number | 41446 |
| Report Type | Original |
| Operator Id | 2714 PHMSA Enforcement |
| Name | Eastern Gas Transmission And Storage, Inc. |
| Operator Street Address | 925 White Oaks Boulevard |
| Operator City Name | Bridgeport |
| Operator State Abbreviation | WV |
| Operator Postal Code | 26330 |
| Local Datetime | 2025-09-12 19:32:00 |
| Time Zone | Eastern |
| Daylight Savings Ind | Yes |
| Location Latitude | 39.79298 Google Maps OpenStreetMap |
| Location Longitude | -79.69054 Google Maps OpenStreetMap |
| Nrc Rpt Num | 1442611 NRC Report How to search |
| Nrc Rpt Datetime | 2025-09-12 20:45:00 |
| Additional Nrc Report Numbers | 1442677 |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 29159 |
| Intentional Release | 0 |
| Accompanying Liquid | 0.05 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Status When Identified | Normal Operation, Includes Pauses During Maintenance |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2025-09-12 21:20:00 |
| Still Shutdown Ind | Yes |
| Communication State Fed Ind | Yes |
| Party Initiated Communication | Local/state/federal Emergency Responder |
| Initial Responder Com Datetime | 2025-09-12 20:31:00 |
| Ignite Ind | No |
| Upstream Action Taken | Valve Closure |
| Upstream Valve Close Datetime | 2025-09-12 20:55:00 |
| Downstream Action Taken | Valve Closure |
| Downstream Vlv Close Datetime | 2025-09-12 21:20:00 |
| Num Pub Evacuated | 0 |
| Incident Identified Datetime | 2025-09-12 19:32:00 |
| On Site Datetime | 2025-09-12 21:15:00 |
| Confirmed Discovery Datetime | 2025-09-12 20:20:00 |
| On Off Shore | Onshore |
| Onshore State Abbreviation | Pa |
| Onshore Postal Code | 15437 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Fayette |
| Designated Location | Survey Station No. |
| Designated Name | 125+05 |
| Pipe Fac Name | Up-24 |
| Segment Name | Up-24/1a |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 36 |
| Other Underground Facilities | Yes |
| Crossing | No |
| Pipe Facility Type | Interstate |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 8 |
| Puddle Weld Ind | No |
| Pipe Wall Thickness | 0.375 |
| Pipe Smys | 65000 |
| Pipe Specification | Api 5l X65 |
| Pipe Seam Type | Longitudinal Erw - High Frequency |
| Pipe Manufacturer | U.s. Steel Corporation |
| Pipe Coating Type | Epoxy |
| Coating Applied Ind | Yes |
| Installation Year | 1998 |
| Manufactured Year | 1998 |
| Material Involved | Carbon Steel |
| Release Type | Rupture |
| Rupture Orient | Longitudinal |
| Rupture Length | 16 |
| Rupture Width | 8 |
| Class Location Type | Class 1 Location |
| Could Be Hca | No |
| Pir Radius | 361 |
| Heat Damage Ind | No |
| Non Heat Damage Ind | No |
| Did Occur In Mca Ind | No |
| Est Cost Oper Paid | 0 |
| Est Cost Unintentional Release | 83395 |
| Est Cost Intentional Release | 0 |
| Est Cost Prop Damage | 36000 |
| Est Cost Emergency | 5000 |
| Est Cost Other | 60000 |
| Est Cost Other Details | Failure Analysis |
| Gas Cost In Mcf | 2.86 |
| Prpty | 184395 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Wildlife Impact Ind | No |
| Accident Psig | 3176 |
| Gas Flow In Pipe In Mcf | 0 |
| Mop Psig | 3377 |
| Mop Cfr Section | 192.619(A)(2) View CFR 49 §192 |
| Maop Established Date | 1999-11-12 00:00:00 |
| Maop Reversal Flow Ind | No |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Pressure Restriction Ind | No |
| Gas Required Odorized Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Length Segment Isolated | 9325 |
| Internal Inspection Ind | No |
| Other Inspection Ind | Yes |
| Internal Inspection Details | The Incident Occurred On A Short Section Of Pipe Between The Up-24 Mainline Pipe And A Drip. The Up-24 Pipeline Is Configured To Accommodate Internal Inspection Tools. |
| Operation Complications Ind | Yes |
| Other Complications Ind | Yes |
| Inspect Comp Details | See Response For Item E7. |
| Pipeline Function | Transmission In Storage Field |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Accident Identifier | Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations) |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | Localized Pitting |
| Int Water Acid Ind | Yes |
| Int Field Exam Basis Ind | Yes |
| Int Metallurgical Basis Ind | Yes |
| Int Low Point Pipe Loc Ind | Yes |
| Int Drop Out Loc Ind | Yes |
| Corrosion Inhibitors | Yes |
| Corrosion Lining | No |
| Cleaning Dewatering | Not Applicable - Not Mainline Pipe |
| Corrosion Coupons | Yes |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Pwf Design Ind | Yes |
| Pwf Construction Ind | Yes |
| Preparer Name | D** S**** |
| Preparer Title | Pipeline Integrity Engineer |
| Preparer Email | D***********@b*****.com |
| Preparer Telephone | 6818423365 |
| Local Contact Name | J***** C**** |
| Local Contact Email | J***********@b*****.com |
| Local Contact Telephone | 7249531696 |
| Authorizer Name | K*** W****** |
| Authorizer Title | Manager - Pipeline Integrity |
| Authorizer Telephone | 3048412365 |
| Authorizer Email | K***********@b*****.com |
| Narrative | On 9/12/2025 at approximately 19:32, up-24 ruptured at station 125+05 near the drip and launcher / receiver at the uw-204 well pad in forbes state forest which is located west of farmington, pa in fayette county. Gas control received initial indication of the rupture from scada pressure drop alarms on up-2, up-5, and up-7 at 19:32. Up-24 is an 8 inch diameter transmission pipeline in storage function approximately 2.3 miles long and transports gas between other transmission pipelines in storage function and uw-204 which is an underground storage well in north summit storage. The maximum allowable operating pressure of up-24 is 3377 psig. Up-24 was in normal operation with an operating pressure of 3176 psig and no flow when the incident occurred. At approximately 20:20, operations personnel called gas control and confirmed that natural gas was blowing in north summit storage. Fayette county 911 called gas control at approximately 20:31 and provided a similar notification. Operations personnel manually closed valve up-24 upstream of up-24 at approximately 20:55 and manually closed the master gate valve and lead lines on uw-204 downstream of up-24 at approximately 21:20 to complete the isolation of up-24. Gas control also initiated commands to remotely close valves up-5 and up-116 to support the isolation of up-24 at approximately 20:57. Gas ceased blowing from up-24 at approximately 21:29. The rupture resulted in the longitudinal and then circumferential failure of pipe going to the drip; an approximately 25 ft by 30 ft hole in the ground approximately 12 ft to 15 ft deep; approximately 14 ft of pipe folding up and coming out of the ground; approximately 1.5 ft of pipe being ejected approximately 73 ft away from the hole; damage to the drip and associated piping; damage to the launcher / receiver and associated piping; damage to a nearby aboveground brine storage tank at the uw-204 well pad and associated piping; approximately 26,067 mcf gas loss from up-24; approximately 3,092 mcf of gas loss from uw-204; and approximately 0.05 barrels of brine spilled to the ground. The gas did not ignite and there were no fires, injuries, fatalities, or evacuations. Initial notification (#1442611) was made to the nrc on 9/12/2025 at 20:45. Follow up notification (#1442677) was made to the nrc on 9/13/2025 at 20:50. The isolation of up-24 remains in effect until the following remediation actions are completed: the section of up-24 containing the rupture is replaced; the drip and associated piping are replaced; the launcher / receiver and associated piping are replaced; and the nearby aboveground brine storage tank and associated piping are replaced. Cleanup of the soil where the brine spilled was completed. Four pieces of up-24 pipe were cut-out at the rupture and were sent to kiefner & associates for failure analysis. The failure analysis report from kiefner is pending, but the preliminary indication is that internal corrosion was the apparent cause. As a precautionary measure, the integrity of the uw-204 wellhead and annular vent were inspected and it was confirmed that uw-204 can be safely returned to service once the remediation actions for up-24 are completed and up-24 is returned to service. A supplemental incident report will be submitted once up-24 is returned to service. |