GTG incident on 2025-07-02 — TX

Operator
Texas Eastern Transmission, Lp
Cause
Equipment Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$101,357
Incident datetime
2025-07-02 00:00 UTC
Report number
Location
TX
Narrative
On may 14, 2025, at approximately 9:30 a.M. Ct, a leak was discovered during an integrity dig on bate-leba line 1. While daylighting the pipeline for the anomaly investigation, slight bubbling was observed at a location unrelated to the target anomaly. The leak was identified at a vintage construction bleeder valve (approx. 1-2� diameter) located approximately six feet from the target anomaly. The feature is a 10��14� diameter metallic can, approximately 8��12� in height, tack welded to the top of the pipeline to protect the bleeder valve. Ili tool logs confirm the presence of a tap at this location and orientation. Upon confirmation of the leak, the ditch was immediately evacuated. In accordance with enbridge sop, an immediate pressure restriction to 80% of pressure at time of discovery was implemented. During a stakeholder call held at 7:15 p.M. Ct the same day, it was determined that the repair costs could exceed the reporting threshold. Following assessment by pipeline integrity, a decision was made to proceed with an in-service containment sleeve repair. Due to safety concerns, the metallic can was not removed to identify the exact leak source. All repair activities were completed, and pressure tested, and the line was safely returned to normal operating pressures on may 30, 2025.
Detailed record list
Report Received Date
2025-07-02 00:00:00
Iyear
2025
Report Number
20250075
Supplemental Number
41104
Report Type
Original Final
Operator Id
Name
Texas Eastern Transmission, Lp
Operator Street Address
915 North Eldridge Parkway
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77079
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
-84.54095851
Nrc Rpt Num
Additional Nrc Report Numbers
1431308
Commodity Released Type
Natural Gas
Unintentional Release
233
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
A Restriction Of 80% Of Pressure At Time Of Discovery Was Put Into Effect.
Communication State Fed Ind
No
Ignite Ind
No
Upstream Action Taken
Operational Control
Upstream Oprtnl Cntrl Detail
Gas Control Implemented Controls To Limit Line Pressure To 80% Of Pressure At Time Of Discovery.
Downstream Action Taken
Operational Control
Downstream Oprtnl Cntrl Detail
Gas Control Implemented Controls To Limit Line Pressure To 80% Of Pressure At Time Of Discovery.
Num Pub Evacuated
0
On Off Shore
Onshore
Onshore State Abbreviation
Oh
Onshore Postal Code
45011
Onshore City Name
Hamilton
Onshore County Name
Butler
Designated Location
Milepost
Designated Name
767.02
Pipe Fac Name
Line 1
Segment Name
Bate-Leba
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
72
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Other
Item Involved Details
Retired Bleeder Valve
Installation Year
1943
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
Source Of Leak Not Identified
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
469
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
895
Est Cost Intentional Release
0
Est Cost Prop Damage
101357
Est Cost Emergency
136260
Est Cost Other
0
Gas Cost In Mcf
3.84
Prpty
238512
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
599
Gas Flow In Pipe In Mcf
31060
Mop Psig
800
Mop Cfr Section
Maop Established Date
1970-02-28 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Length Segment Isolated
44880
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The leak was discovered on bate-leba line 1 at mp 767.02 in vs-05 during excavation of an anomaly dig. The leak was not of a size that could be identified through scada.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Other Equipment Failure
Eq Failure Type
Other Equipment Failure
Eq Failure Details
Suspected Bleeder Valve Leak
Eq Additional Other Ind
Yes
Eq Additional Other Details
Suspected Cause - Retired Bleeder Valve Leak
Preparer Name
M****** G*****
Preparer Title
Compliance Specialist Engineer
Preparer Email
M*************@e*******.com
Preparer Telephone
281-721-3190
Authorizer Name
S***** A******
Authorizer Title
Manager Operational Compliance
Authorizer Telephone
936-433-3303
Authorizer Email
S**************@e*******.com
Narrative
On may 14, 2025, at approximately 9:30 a.M. Ct, a leak was discovered during an integrity dig on bate-leba line 1. While daylighting the pipeline for the anomaly investigation, slight bubbling was observed at a location unrelated to the target anomaly. The leak was identified at a vintage construction bleeder valve (approx. 1-2� diameter) located approximately six feet from the target anomaly. The feature is a 10��14� diameter metallic can, approximately 8��12� in height, tack welded to the top of the pipeline to protect the bleeder valve. Ili tool logs confirm the presence of a tap at this location and orientation. Upon confirmation of the leak, the ditch was immediately evacuated. In accordance with enbridge sop, an immediate pressure restriction to 80% of pressure at time of discovery was implemented. During a stakeholder call held at 7:15 p.M. Ct the same day, it was determined that the repair costs could exceed the reporting threshold. Following assessment by pipeline integrity, a decision was made to proceed with an in-service containment sleeve repair. Due to safety concerns, the metallic can was not removed to identify the exact leak source. All repair activities were completed, and pressure tested, and the line was safely returned to normal operating pressures on may 30, 2025.
Report Received Date 2025-07-02 00:00:00
Iyear 2025
Report Number 20250075
Supplemental Number 41104
Report Type Original Final
Operator Id 19235 PHMSA Enforcement
Name Texas Eastern Transmission, Lp
Operator Street Address 915 North Eldridge Parkway
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77079
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 39.44759809 Google Maps OpenStreetMap
Location Longitude -84.54095851 Google Maps OpenStreetMap
Nrc Rpt Num 1431101 NRC Report How to search
Additional Nrc Report Numbers 1431308
Commodity Released Type Natural Gas
Unintentional Release 233
Intentional Release 0
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Status When Identified Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind No
Shutdown Explain A Restriction Of 80% Of Pressure At Time Of Discovery Was Put Into Effect.
Communication State Fed Ind No
Ignite Ind No
Upstream Action Taken Operational Control
Upstream Oprtnl Cntrl Detail Gas Control Implemented Controls To Limit Line Pressure To 80% Of Pressure At Time Of Discovery.
Downstream Action Taken Operational Control
Downstream Oprtnl Cntrl Detail Gas Control Implemented Controls To Limit Line Pressure To 80% Of Pressure At Time Of Discovery.
Num Pub Evacuated 0
On Off Shore Onshore
Onshore State Abbreviation Oh
Onshore Postal Code 45011
Onshore City Name Hamilton
Onshore County Name Butler
Designated Location Milepost
Designated Name 767.02
Pipe Fac Name Line 1
Segment Name Bate-Leba
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Exposed Due To Excavation
Depth Of Cover 72
Other Underground Facilities No
Crossing No
Pipe Facility Type Interstate
System Part Involved Onshore Pipeline, Including Valve Sites
Item Involved Other
Item Involved Details Retired Bleeder Valve
Installation Year 1943
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Other
Leak Type Other Source Of Leak Not Identified
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 469
Heat Damage Ind No
Non Heat Damage Ind No
Did Occur In Mca Ind No
Est Cost Oper Paid 0
Est Cost Unintentional Release 895
Est Cost Intentional Release 0
Est Cost Prop Damage 101357
Est Cost Emergency 136260
Est Cost Other 0
Gas Cost In Mcf 3.84
Prpty 238512
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Wildlife Impact Ind No
Accident Psig 599
Gas Flow In Pipe In Mcf 31060
Mop Psig 800
Mop Cfr Section 192.619(C) View CFR 49 §192
Maop Established Date 1970-02-28 00:00:00
Maop Reversal Flow Ind Bi-Directional
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Gas Required Odorized Ind No
Length Segment Isolated 44880
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Contractor Working For The Operator
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The leak was discovered on bate-leba line 1 at mp 767.02 in vs-05 during excavation of an anomaly dig. The leak was not of a size that could be identified through scada.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Other Equipment Failure
Eq Failure Type Other Equipment Failure
Eq Failure Details Suspected Bleeder Valve Leak
Eq Additional Other Ind Yes
Eq Additional Other Details Suspected Cause - Retired Bleeder Valve Leak
Preparer Name M****** G*****
Preparer Title Compliance Specialist Engineer
Preparer Email M*************@e*******.com
Preparer Telephone 281-721-3190
Authorizer Name S***** A******
Authorizer Title Manager Operational Compliance
Authorizer Telephone 936-433-3303
Authorizer Email S**************@e*******.com
Narrative On may 14, 2025, at approximately 9:30 a.M. Ct, a leak was discovered during an integrity dig on bate-leba line 1. While daylighting the pipeline for the anomaly investigation, slight bubbling was observed at a location unrelated to the target anomaly. The leak was identified at a vintage construction bleeder valve (approx. 1-2� diameter) located approximately six feet from the target anomaly. The feature is a 10��14� diameter metallic can, approximately 8��12� in height, tack welded to the top of the pipeline to protect the bleeder valve. Ili tool logs confirm the presence of a tap at this location and orientation. Upon confirmation of the leak, the ditch was immediately evacuated. In accordance with enbridge sop, an immediate pressure restriction to 80% of pressure at time of discovery was implemented. During a stakeholder call held at 7:15 p.M. Ct the same day, it was determined that the repair costs could exceed the reporting threshold. Following assessment by pipeline integrity, a decision was made to proceed with an in-service containment sleeve repair. Due to safety concerns, the metallic can was not removed to identify the exact leak source. All repair activities were completed, and pressure tested, and the line was safely returned to normal operating pressures on may 30, 2025.

All rights reserved. Copyright © by ClearPHMSA