GTG incident on 2025-06-04 — TX

Operator
Sea Robin Pipeline Co
Cause
Corrosion Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$350,000
Incident datetime
2025-06-04 00:00 UTC
Report number
Location
TX
Narrative
At approximately 1212 on 05/17/25, operations received a notification from a 3rd party reporting bubbles in the area near the sea robin 716-10-1 lateral in eugene island 330 (ei 330). An overflight was conducted to verify the location of the bubbles and was confirmed at approximately 1430 on 05/17/25. Nrc was called reporting the bubbles in ei 331 (nrc#1431397, 48hr update#1431515). The pipeline was isolated on 05/17/25 at 1437. Overflights were conducted daily to monitor the area for any changes as weather permitted. Due to dsv availability, the repair contractor was not able to deploy until 5/22/25. The leak was located and a clamp was installed on 5/24/25 at 0650. The pipeline was returned to service at approximately 1346 on 05/24/25. The 48hr nrc notification was updated on 05/23/25 at 1440 to reflect the change from unknown owner to sea robin pipeline. (#1431997)
Detailed record list
Report Received Date
2025-06-04 00:00:00
Iyear
2025
Report Number
20250066
Supplemental Number
41171
Report Type
Supplemental Final
Operator Id
Name
Sea Robin Pipeline Co
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Nrc Rpt Num
Additional Nrc Report Numbers
1431515, 1431997
Commodity Released Type
Natural Gas
Unintentional Release
1587069
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Ignite Ind
No
Upstream Action Taken
Valve Closure
Downstream Action Taken
Valve Closure
Num Pub Evacuated
0
On Off Shore
Offshore
Pipe Fac Name
Sea Robin
Segment Name
Line 716-10-1
Off Water Depth
260
Off Accident Origin
On The Outer Continental Shelf (Ocs)
Ocs Type
Ocs-Gulf Of America
Off Ocs Area
Eugene Island
Off Ocs Block
330
Off Area Accident Type
Below Water, Pipe Buried Or Jetted Below Seabed
Pipe Facility Type
Interstate
System Part Involved
Offshore Pipeline, Including Riser And Riser Bend
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8.625
Puddle Weld Ind
No
Pipe Wall Thickness
0.41
Pipe Smys
24000
Pipe Specification
Api 5l X52
Pipe Seam Type
Other
Pipe Seam Details
Unknown
Pipe Manufacturer
Unknown
Pipe Coating Type
Other
Pipe Coating Details
Mastec & Concrete
Coating Applied Ind
Yes
Installation Year
1973
Manufactured Year
1973
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
215
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
5523000
Est Cost Intentional Release
0
Est Cost Prop Damage
350000
Est Cost Emergency
35000
Est Cost Other
0
Gas Cost In Mcf
3.48
Prpty
5908000
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
900
Gas Flow In Pipe In Mcf
3000
Mop Psig
1306
Mop Cfr Section
192.619(A)(1)
Maop Established Date
1977-01-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
31680
Internal Inspection Ind
No
Tight Mitered Ind
Yes
Operation Complications Ind
Yes
Low Flow Ind
Yes
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Other
Accident Details
Notified By Producer
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Leak was too small for scada to detect
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Not Cut Open
Int Corrosive Commodity Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
No
Corrosion Lining
No
Cleaning Dewatering
No
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
P**** W***
Preparer Title
Manager Dot Compliance
Preparer Email
P*********@e*************.com
Preparer Telephone
4093823918
Authorizer Name
P**** W***
Authorizer Title
Manager Dot Compliance
Authorizer Telephone
4093823918
Authorizer Email
P*********@e*************.com
Narrative
At approximately 1212 on 05/17/25, operations received a notification from a 3rd party reporting bubbles in the area near the sea robin 716-10-1 lateral in eugene island 330 (ei 330). An overflight was conducted to verify the location of the bubbles and was confirmed at approximately 1430 on 05/17/25. Nrc was called reporting the bubbles in ei 331 (nrc#1431397, 48hr update#1431515). The pipeline was isolated on 05/17/25 at 1437. Overflights were conducted daily to monitor the area for any changes as weather permitted. Due to dsv availability, the repair contractor was not able to deploy until 5/22/25. The leak was located and a clamp was installed on 5/24/25 at 0650. The pipeline was returned to service at approximately 1346 on 05/24/25. The 48hr nrc notification was updated on 05/23/25 at 1440 to reflect the change from unknown owner to sea robin pipeline. (#1431997)
Report Received Date 2025-06-04 00:00:00
Iyear 2025
Report Number 20250066
Supplemental Number 41171
Report Type Supplemental Final
Operator Id 18152 PHMSA Enforcement
Name Sea Robin Pipeline Co
Operator Street Address 1300 Main Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 28.246468 Google Maps OpenStreetMap
Location Longitude -91.70387 Google Maps OpenStreetMap
Nrc Rpt Num 1431397 NRC Report How to search
Additional Nrc Report Numbers 1431515, 1431997
Commodity Released Type Natural Gas
Unintentional Release 1587069
Intentional Release 0
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Status When Identified Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind Yes
Communication State Fed Ind Yes
Party Initiated Communication Operator
Ignite Ind No
Upstream Action Taken Valve Closure
Downstream Action Taken Valve Closure
Num Pub Evacuated 0
On Off Shore Offshore
Pipe Fac Name Sea Robin
Segment Name Line 716-10-1
Off Water Depth 260
Off Accident Origin On The Outer Continental Shelf (Ocs)
Ocs Type Ocs-Gulf Of America
Off Ocs Area Eugene Island
Off Ocs Block 330
Off Area Accident Type Below Water, Pipe Buried Or Jetted Below Seabed
Pipe Facility Type Interstate
System Part Involved Offshore Pipeline, Including Riser And Riser Bend
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 8.625
Puddle Weld Ind No
Pipe Wall Thickness 0.41
Pipe Smys 24000
Pipe Specification Api 5l X52
Pipe Seam Type Other
Pipe Seam Details Unknown
Pipe Manufacturer Unknown
Pipe Coating Type Other
Pipe Coating Details Mastec & Concrete
Coating Applied Ind Yes
Installation Year 1973
Manufactured Year 1973
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 215
Heat Damage Ind No
Non Heat Damage Ind No
Did Occur In Mca Ind No
Est Cost Oper Paid 0
Est Cost Unintentional Release 5523000
Est Cost Intentional Release 0
Est Cost Prop Damage 350000
Est Cost Emergency 35000
Est Cost Other 0
Gas Cost In Mcf 3.48
Prpty 5908000
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Wildlife Impact Ind No
Accident Psig 900
Gas Flow In Pipe In Mcf 3000
Mop Psig 1306
Mop Cfr Section 192.619(A)(1) View CFR 49 §192
Maop Established Date 1977-01-01 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Gas Required Odorized Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Length Segment Isolated 31680
Internal Inspection Ind No
Tight Mitered Ind Yes
Operation Complications Ind Yes
Low Flow Ind Yes
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Accident Identifier Other
Accident Details Notified By Producer
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Leak was too small for scada to detect
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results Not Cut Open
Int Corrosive Commodity Ind Yes
Int Field Exam Basis Ind Yes
Int Low Point Pipe Loc Ind Yes
Corrosion Inhibitors No
Corrosion Lining No
Cleaning Dewatering No
Corrosion Coupons Not Applicable - Not Mainline Pipe
Collected Data Ind No
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name P**** W***
Preparer Title Manager Dot Compliance
Preparer Email P*********@e*************.com
Preparer Telephone 4093823918
Authorizer Name P**** W***
Authorizer Title Manager Dot Compliance
Authorizer Telephone 4093823918
Authorizer Email P*********@e*************.com
Narrative At approximately 1212 on 05/17/25, operations received a notification from a 3rd party reporting bubbles in the area near the sea robin 716-10-1 lateral in eugene island 330 (ei 330). An overflight was conducted to verify the location of the bubbles and was confirmed at approximately 1430 on 05/17/25. Nrc was called reporting the bubbles in ei 331 (nrc#1431397, 48hr update#1431515). The pipeline was isolated on 05/17/25 at 1437. Overflights were conducted daily to monitor the area for any changes as weather permitted. Due to dsv availability, the repair contractor was not able to deploy until 5/22/25. The leak was located and a clamp was installed on 5/24/25 at 0650. The pipeline was returned to service at approximately 1346 on 05/24/25. The 48hr nrc notification was updated on 05/23/25 at 1440 to reflect the change from unknown owner to sea robin pipeline. (#1431997)

All rights reserved. Copyright © by ClearPHMSA