GD incident on 2025-07-01 — TX

Operator
Atmos Energy Corporation - Mid-Tex
Cause
Excavation Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$461,744
Incident datetime
2025-07-01 00:00 UTC
Report number
Location
TX, TAYLOR
Narrative
On june 5, 2025, at approximately 3:18 p.M., atmos energy received a call reporting a damage to our facilities at 174 cypress street, abilene, texas. The 10-inch low pressure main was dented several times and punctured in one location causing a release of gas. This area was accurately marked by atmos energy�s locator contractor on may 30, 2025 in response to a locate ticket received on may 28, 2025. The third-party contractor was removing trees along the city sidewalk, with mechanized equipment, and failed to maintain clearance of the marked lines. The release was secured at 3:13 a.M. On june 6, 2025. Confirmed discovery of this event occurred on june 25, 2025, at 2:55 p.M., when the estimate to replace the damaged segments of main was prepared. Note that the number in a22 reflects the number of businesses that were evacuated. The number of individuals who exited those businesses is unknown.
Detailed record list
Report Received Date
2025-07-01 00:00:00
Iyear
2025.0
Report Number
20250037.0
Supplemental Number
41092.0
Report Type
Original Final
Operator Id
Name
Atmos Energy Corporation - Mid-Tex
Operator Street Address
5430 Lbj Freeway Suite 1800
Operator City Name
Dallas
Operator State Abbreviation
TX
Operator Postal Code
75240.0
Time Zone
Central
Daylight Savings Ind
Yes
Location Street Address
174 Cypress St
Location City Name
Abilene
Location County Name
Taylor
Location State Abbreviation
TX
Location Postal Code
79602.0
Location Latitude
Location Longitude
Flow Cont Main Valve Ind
Yes
Flow Cont Stopple Fitng Ind
Yes
Nrc Rpt Num
Additional Nrc Report Numbers
1433347.0
Commodity Released Type
Natural Gas
Unintentional Release
204.0
Intentional Release
0.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Num Pub Evacuated
10.0
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Under Pavement
Depth Of Cover
36.0
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Investor Owned
System Part Involved
Main
Installation Year
1969.0
Pipe Diameter
10.0
Pipe Specification
Api 5l
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Unknown
Release Type
Mechanical Puncture
Puncture Axial
6.0
Puncture Circum
8.0
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
461744.0
Est Cost Emergency
0.0
Est Cost Other
0.0
Gas Cost In Mcf
10.159
Est Cost Unintentional Release
2072.0
Est Cost Intentional Release
0.0
Prpty
463816.0
Commercial Affected
10.0
Industrial Affected
0.0
Residences Affected
0.0
Num Persons Hosp Not Ovnght
0.0
Num Injured Treated By Emt
0.0
Num Resident Building Affctd
0.0
Num Business Building Affctd
10.0
Accident Psig
0.4
Normal Psig
0.4
Mop Psig
0.75
Mop Cfr Section
192.619(A)(1)
Maop Established Date
1969-11-12 00:00:00
Accident Pressure
Pressure Did Not Exceed Maop
Gas Odorized System Type
Odorized By Others
Gas Odorized Lvl Not Msrd Ind
Yes
Scada In Place Ind
No
Accident Identifier
Notification From Public
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
State Law Exempt Ind
No
Notify Cga Dirt
No
Public Row Ind
Yes
Public Subtype
City Street
Joint Trench Ind
No
Cross Bore Ind
No
Depth Of Grade
18� � 36�
Excavator Type
Contractor
Excavator Equipment
Backhoe/trackhoe
Work Performed
Curb/sidewalk
One Call Notified Ind
Yes
One Call Ticket Num
2564834420.0
One Call Center Name
Texas 811
White Lined Ind
Yes
Locator Type
Contract Locator
Visible Marks
Yes
Service Interruption
No
Root Cause Category
Excavation Issue
Root Cause Type
Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name
B*** B*****
Preparer Title
Director Of Regulatory And Compliance
Preparer Email
B**********@a**********.com
Preparer Telephone
806-787-9422
Local Contact Name
E** D******
Local Contact Email
E**********@a**********.com
Local Contact Telephone
325-690-7506
Authorizer Name
M*** R********
Authorizer Title
Vp Compliance And Regulatory Reporting
Authorizer Telephone
214-206-2912
Authorizer Email
M*************@a**********.com
Narrative
On june 5, 2025, at approximately 3:18 p.M., atmos energy received a call reporting a damage to our facilities at 174 cypress street, abilene, texas. The 10-inch low pressure main was dented several times and punctured in one location causing a release of gas. This area was accurately marked by atmos energy�s locator contractor on may 30, 2025 in response to a locate ticket received on may 28, 2025. The third-party contractor was removing trees along the city sidewalk, with mechanized equipment, and failed to maintain clearance of the marked lines. The release was secured at 3:13 a.M. On june 6, 2025. Confirmed discovery of this event occurred on june 25, 2025, at 2:55 p.M., when the estimate to replace the damaged segments of main was prepared. Note that the number in a22 reflects the number of businesses that were evacuated. The number of individuals who exited those businesses is unknown.
Report Received Date 2025-07-01 00:00:00
Iyear 2025.0
Report Number 20250037.0
Supplemental Number 41092.0
Report Type Original Final
Operator Id 31348 PHMSA Enforcement
Name Atmos Energy Corporation - Mid-Tex
Operator Street Address 5430 Lbj Freeway Suite 1800
Operator City Name Dallas
Operator State Abbreviation TX
Operator Postal Code 75240.0
Time Zone Central
Daylight Savings Ind Yes
Location Street Address 174 Cypress St
Location City Name Abilene
Location County Name Taylor
Location State Abbreviation TX
Location Postal Code 79602.0
Location Latitude 32.4503116 Google Maps OpenStreetMap
Location Longitude -99.7341724 Google Maps OpenStreetMap
Flow Cont Main Valve Ind Yes
Flow Cont Stopple Fitng Ind Yes
Nrc Rpt Num 1433245.0 NRC Report How to search
Additional Nrc Report Numbers 1433347.0
Commodity Released Type Natural Gas
Unintentional Release 204.0
Intentional Release 0.0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind No
Num Pub Evacuated 10.0
Communication State Fed Ind Yes
Party Initiated Communication Operator
Federal No
Location Type Utility Right-Of-Way / Easement
Incident Area Type Underground
Incident Area Subtype Under Pavement
Depth Of Cover 36.0
Other Underground Facilities No
Crossing No
Pipe Facility Type Investor Owned
System Part Involved Main
Installation Year 1969.0
Pipe Diameter 10.0
Pipe Specification Api 5l
Pipe Manufacturer Unknown
Material Involved Steel
Steel Seam Type Other
Steel Seam Type Details Unknown
Release Type Mechanical Puncture
Puncture Axial 6.0
Puncture Circum 8.0
Class Location Type Class 3 Location
Est Cost Oper Paid 0.0
Est Cost Prop Damage 461744.0
Est Cost Emergency 0.0
Est Cost Other 0.0
Gas Cost In Mcf 10.159
Est Cost Unintentional Release 2072.0
Est Cost Intentional Release 0.0
Prpty 463816.0
Commercial Affected 10.0
Industrial Affected 0.0
Residences Affected 0.0
Num Persons Hosp Not Ovnght 0.0
Num Injured Treated By Emt 0.0
Num Resident Building Affctd 0.0
Num Business Building Affctd 10.0
Accident Psig 0.4
Normal Psig 0.4
Mop Psig 0.75
Mop Cfr Section 192.619(A)(1) View CFR 49 §192
Maop Established Date 1969-11-12 00:00:00
Accident Pressure Pressure Did Not Exceed Maop
Gas Odorized System Type Odorized By Others
Gas Odorized Lvl Not Msrd Ind Yes
Scada In Place Ind No
Accident Identifier Notification From Public
Investigation Status No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind Yes
One Call System Ind Yes
State Law Exempt Ind No
Notify Cga Dirt No
Public Row Ind Yes
Public Subtype City Street
Joint Trench Ind No
Cross Bore Ind No
Depth Of Grade 18� � 36�
Excavator Type Contractor
Excavator Equipment Backhoe/trackhoe
Work Performed Curb/sidewalk
One Call Notified Ind Yes
One Call Ticket Num 2564834420.0
One Call Center Name Texas 811
White Lined Ind Yes
Locator Type Contract Locator
Visible Marks Yes
Service Interruption No
Root Cause Category Excavation Issue
Root Cause Type Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name B*** B*****
Preparer Title Director Of Regulatory And Compliance
Preparer Email B**********@a**********.com
Preparer Telephone 806-787-9422
Local Contact Name E** D******
Local Contact Email E**********@a**********.com
Local Contact Telephone 325-690-7506
Authorizer Name M*** R********
Authorizer Title Vp Compliance And Regulatory Reporting
Authorizer Telephone 214-206-2912
Authorizer Email M*************@a**********.com
Narrative On june 5, 2025, at approximately 3:18 p.M., atmos energy received a call reporting a damage to our facilities at 174 cypress street, abilene, texas. The 10-inch low pressure main was dented several times and punctured in one location causing a release of gas. This area was accurately marked by atmos energy�s locator contractor on may 30, 2025 in response to a locate ticket received on may 28, 2025. The third-party contractor was removing trees along the city sidewalk, with mechanized equipment, and failed to maintain clearance of the marked lines. The release was secured at 3:13 a.M. On june 6, 2025. Confirmed discovery of this event occurred on june 25, 2025, at 2:55 p.M., when the estimate to replace the damaged segments of main was prepared. Note that the number in a22 reflects the number of businesses that were evacuated. The number of individuals who exited those businesses is unknown.

All rights reserved. Copyright © by ClearPHMSA