GTG incident on 2025-04-04 — NE

Operator
Northern Natural Gas Co
Cause
Natural Force Damage
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$170,000
Incident datetime
2025-04-04 00:00 UTC
Report number
Location
NE
Narrative
On march 11, 2025, at 1335 hours, a technician arrived on-site at the blooming prairie, mn branch line regulator station (mnr-0103) for regular maintenance and found bubbles coming up from below ground near pipeline facilities. A plan was developed to reduce pressure for investigation and evaluation of the cause of the leak. Third-party contractors were mobilized to preform excavation and repairs. After excavation, it was determined that a 1/4-inch nipple on the cbc01 valve body bleed riser had cracked and was leaking. On march 13, 2025, at 1240 hours, repairs were completed with new components and tested for leaks. Leak checks were performed at 100psig intervals as pressure was restored with no leaks identified. Field operations completed returning the mnb73202 pipeline back to regular operating configuration and pressure on march 13, 2025, at 1813 hours. Investigation concluded the body bleed riser was not sufficiently supported and due to years of ground freeze and thaws, the nipple body cracked causing the event. The replacement body bleed riser was installed with a rigid connection to prevent reoccurrence.
Detailed record list
Report Received Date
2025-04-04 00:00:00
Iyear
2025
Report Number
20250033
Supplemental Number
40785
Report Type
Supplemental Final
Operator Id
Name
Northern Natural Gas Co
Operator Street Address
1111 South 103rd Street
Operator City Name
Omaha
Operator State Abbreviation
NE
Operator Postal Code
68124
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Nrc Rpt Num
Additional Nrc Report Numbers
1425735
Commodity Released Type
Natural Gas
Unintentional Release
24
Intentional Release
8037
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Pressure Was Lowered To Approximately 25 Pounds To Make Repairs.
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Ignite Ind
No
Upstream Action Taken
Valve Closure
Downstream Action Taken
Valve Closure
Num Pub Evacuated
0
On Off Shore
Onshore
Onshore State Abbreviation
Mn
Onshore Postal Code
55917
Onshore City Name
Not Within A Municipality
Onshore County Name
Freeborn
Designated Location
Milepost
Designated Name
15.51
Pipe Fac Name
La Crosse 12-Inch Loop
Segment Name
Mnb73202
Federal
No
Location Type
Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
40
Other Underground Facilities
Yes
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Tubing
Tubing Material
Carbon Steel
Tubing Type
Rigid
Installation Year
1993
Manufactured Year
1993
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
294
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
88
Est Cost Intentional Release
29576
Est Cost Prop Damage
170000
Est Cost Emergency
0
Est Cost Other
0
Gas Cost In Mcf
3.68
Prpty
199664
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
841
Gas Flow In Pipe In Mcf
25000
Mop Psig
1000
Mop Cfr Section
192.619(A)(2)
Maop Established Date
1993-12-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
124080
Internal Inspection Ind
No
Unsuitable Mainline Ind
Yes
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The event was driven by a small leak that did not produce a noticeable pressure change. The cost of repair classified the event as a reportable incident.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Natural Force Damage
Cause Details
Temperature
Natural Force Type
Temperature
Temperature Subtype
Frost Heave
Nf Extreme Weather Ind
No
Nf Temperature Ind
Yes
Eqf Equipment Body Ind
Yes
Preparer Name
D**** C*******
Preparer Title
Sr. Pipeline Safety Engineer Ii
Preparer Email
D*************@n****.com
Preparer Telephone
4023987439
Authorizer Name
D**** C*******
Authorizer Title
Sr. Pipeline Safety Engineer Ii
Authorizer Telephone
4023987439
Authorizer Email
D*************@n****.com
Narrative
On march 11, 2025, at 1335 hours, a technician arrived on-site at the blooming prairie, mn branch line regulator station (mnr-0103) for regular maintenance and found bubbles coming up from below ground near pipeline facilities. A plan was developed to reduce pressure for investigation and evaluation of the cause of the leak. Third-party contractors were mobilized to preform excavation and repairs. After excavation, it was determined that a 1/4-inch nipple on the cbc01 valve body bleed riser had cracked and was leaking. On march 13, 2025, at 1240 hours, repairs were completed with new components and tested for leaks. Leak checks were performed at 100psig intervals as pressure was restored with no leaks identified. Field operations completed returning the mnb73202 pipeline back to regular operating configuration and pressure on march 13, 2025, at 1813 hours. Investigation concluded the body bleed riser was not sufficiently supported and due to years of ground freeze and thaws, the nipple body cracked causing the event. The replacement body bleed riser was installed with a rigid connection to prevent reoccurrence.
Report Received Date 2025-04-04 00:00:00
Iyear 2025
Report Number 20250033
Supplemental Number 40785
Report Type Supplemental Final
Operator Id 13750 PHMSA Enforcement
Name Northern Natural Gas Co
Operator Street Address 1111 South 103rd Street
Operator City Name Omaha
Operator State Abbreviation NE
Operator Postal Code 68124
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 43.844013 Google Maps OpenStreetMap
Location Longitude -93.089433 Google Maps OpenStreetMap
Nrc Rpt Num 1425565 NRC Report How to search
Additional Nrc Report Numbers 1425735
Commodity Released Type Natural Gas
Unintentional Release 24
Intentional Release 8037
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Status When Identified Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind No
Shutdown Explain Pressure Was Lowered To Approximately 25 Pounds To Make Repairs.
Communication State Fed Ind Yes
Party Initiated Communication Operator
Ignite Ind No
Upstream Action Taken Valve Closure
Downstream Action Taken Valve Closure
Num Pub Evacuated 0
On Off Shore Onshore
Onshore State Abbreviation Mn
Onshore Postal Code 55917
Onshore City Name Not Within A Municipality
Onshore County Name Freeborn
Designated Location Milepost
Designated Name 15.51
Pipe Fac Name La Crosse 12-Inch Loop
Segment Name Mnb73202
Federal No
Location Type Operator-Controlled Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 40
Other Underground Facilities Yes
Crossing No
Pipe Facility Type Interstate
System Part Involved Onshore Pipeline, Including Valve Sites
Item Involved Tubing
Tubing Material Carbon Steel
Tubing Type Rigid
Installation Year 1993
Manufactured Year 1993
Material Involved Carbon Steel
Release Type Leak
Leak Type Crack
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 294
Heat Damage Ind No
Non Heat Damage Ind No
Did Occur In Mca Ind No
Est Cost Oper Paid 0
Est Cost Unintentional Release 88
Est Cost Intentional Release 29576
Est Cost Prop Damage 170000
Est Cost Emergency 0
Est Cost Other 0
Gas Cost In Mcf 3.68
Prpty 199664
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Wildlife Impact Ind No
Accident Psig 841
Gas Flow In Pipe In Mcf 25000
Mop Psig 1000
Mop Cfr Section 192.619(A)(2) View CFR 49 §192
Maop Established Date 1993-12-01 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Gas Required Odorized Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Length Segment Isolated 124080
Internal Inspection Ind No
Unsuitable Mainline Ind Yes
Operation Complications Ind No
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The event was driven by a small leak that did not produce a noticeable pressure change. The cost of repair classified the event as a reportable incident.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Natural Force Damage
Cause Details Temperature
Natural Force Type Temperature
Temperature Subtype Frost Heave
Nf Extreme Weather Ind No
Nf Temperature Ind Yes
Eqf Equipment Body Ind Yes
Preparer Name D**** C*******
Preparer Title Sr. Pipeline Safety Engineer Ii
Preparer Email D*************@n****.com
Preparer Telephone 4023987439
Authorizer Name D**** C*******
Authorizer Title Sr. Pipeline Safety Engineer Ii
Authorizer Telephone 4023987439
Authorizer Email D*************@n****.com
Narrative On march 11, 2025, at 1335 hours, a technician arrived on-site at the blooming prairie, mn branch line regulator station (mnr-0103) for regular maintenance and found bubbles coming up from below ground near pipeline facilities. A plan was developed to reduce pressure for investigation and evaluation of the cause of the leak. Third-party contractors were mobilized to preform excavation and repairs. After excavation, it was determined that a 1/4-inch nipple on the cbc01 valve body bleed riser had cracked and was leaking. On march 13, 2025, at 1240 hours, repairs were completed with new components and tested for leaks. Leak checks were performed at 100psig intervals as pressure was restored with no leaks identified. Field operations completed returning the mnb73202 pipeline back to regular operating configuration and pressure on march 13, 2025, at 1813 hours. Investigation concluded the body bleed riser was not sufficiently supported and due to years of ground freeze and thaws, the nipple body cracked causing the event. The replacement body bleed riser was installed with a rigid connection to prevent reoccurrence.