GD incident on 2025-05-22 — NC

Operator
Piedmont Natural Gas Co Inc
Cause
Excavation Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$206,970
Incident datetime
2025-05-22 00:00 UTC
Report number
Location
NC, NEW HANOVER
Narrative
Contractor bored into a 6" plastic main while installing a fiber conduit. The damage resulted in 7 customer outages. Use of mechanized equipment in the tolerance zone & excavator failed to support and protect facilities. The national response center (nrc) was not notified because at the time of the incident it was not expected to meet the reporting threshold.
Detailed record list
Report Received Date
2025-05-22 00:00:00
Iyear
2025.0
Report Number
20250032.0
Supplemental Number
40926.0
Report Type
Original Final
Operator Id
Name
Piedmont Natural Gas Co Inc
Operator Street Address
525 South Tryon Street
Operator City Name
Charlotte
Operator State Abbreviation
NC
Operator Postal Code
28202.0
Time Zone
Eastern
Daylight Savings Ind
Yes
Location Street Address
6769 Gordon Road
Location City Name
Wilmington
Location County Name
New Hanover
Location State Abbreviation
NC
Location Postal Code
28411.0
Location Latitude
Location Longitude
Flow Cont Squeeze Off Ind
Yes
Commodity Released Type
Natural Gas
Unintentional Release
946.82
Intentional Release
0.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Num Pub Evacuated
0.0
Communication State Fed Ind
No
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
78.0
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Investor Owned
System Part Involved
Main
Installation Year
2003.0
Pipe Diameter
6.0
Pipe Specification
Unknown
Pipe Manufacturer
Unknown
Material Involved
Plastic
Plastic Type
Polyethylene (Pe)
Wt Plastic Unknown Ind
Unknown
Material Pe Pipe Code
Unknown
Release Type
Mechanical Puncture
Puncture Axial
2.0
Puncture Circum
2.0
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
206970.0
Est Cost Emergency
0.0
Est Cost Other
0.0
Gas Cost In Mcf
4.5
Est Cost Unintentional Release
4261.0
Est Cost Intentional Release
0.0
Prpty
211231.0
Commercial Affected
7.0
Industrial Affected
0.0
Residences Affected
0.0
Num Persons Hosp Not Ovnght
0.0
Num Injured Treated By Emt
0.0
Num Resident Building Affctd
0.0
Num Business Building Affctd
7.0
Accident Psig
55.0
Normal Psig
55.0
Mop Psig
75.0
Mop Cfr Section
192.619(A)(2)
Maop Established Date
2003-02-20 00:00:00
Accident Pressure
Pressure Did Not Exceed Maop
Gas Odorized System Type
None
Gas Odorized Lvl Not Msrd Ind
Yes
Scada In Place Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Excavation damage from a telecom install.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
State Law Exempt Ind
No
Notify Cga Dirt
No
Pipeline Easement Row Ind
Yes
Joint Trench Ind
No
Cross Bore Ind
No
Depth Of Grade
> 36�
Excavator Type
Contractor
Excavator Equipment
Boring
Work Performed
Telecommunications
One Call Notified Ind
Yes
White Lined Ind
Unknown
Locator Type
Contract Locator
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
8.0
Root Cause Category
Excavation Issue
Root Cause Type
Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name
C********** R******
Preparer Title
Gas Regulatory Compliance Analyst
Preparer Email
C******************@d**********.com
Preparer Telephone
704-731-4680
Authorizer Name
F***** B****
Authorizer Title
Pipeline Safety Governance Manager
Authorizer Telephone
704-731-4618
Authorizer Email
F***********@d**********.com
Narrative
Contractor bored into a 6" plastic main while installing a fiber conduit. The damage resulted in 7 customer outages. Use of mechanized equipment in the tolerance zone & excavator failed to support and protect facilities. The national response center (nrc) was not notified because at the time of the incident it was not expected to meet the reporting threshold.
Report Received Date 2025-05-22 00:00:00
Iyear 2025.0
Report Number 20250032.0
Supplemental Number 40926.0
Report Type Original Final
Operator Id 15518 PHMSA Enforcement
Name Piedmont Natural Gas Co Inc
Operator Street Address 525 South Tryon Street
Operator City Name Charlotte
Operator State Abbreviation NC
Operator Postal Code 28202.0
Time Zone Eastern
Daylight Savings Ind Yes
Location Street Address 6769 Gordon Road
Location City Name Wilmington
Location County Name New Hanover
Location State Abbreviation NC
Location Postal Code 28411.0
Location Latitude 34.263893 Google Maps OpenStreetMap
Location Longitude -77.831927 Google Maps OpenStreetMap
Flow Cont Squeeze Off Ind Yes
Commodity Released Type Natural Gas
Unintentional Release 946.82
Intentional Release 0.0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind No
Num Pub Evacuated 0.0
Communication State Fed Ind No
Federal No
Location Type Utility Right-Of-Way / Easement
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 78.0
Other Underground Facilities No
Crossing No
Pipe Facility Type Investor Owned
System Part Involved Main
Installation Year 2003.0
Pipe Diameter 6.0
Pipe Specification Unknown
Pipe Manufacturer Unknown
Material Involved Plastic
Plastic Type Polyethylene (Pe)
Wt Plastic Unknown Ind Unknown
Material Pe Pipe Code Unknown
Release Type Mechanical Puncture
Puncture Axial 2.0
Puncture Circum 2.0
Class Location Type Class 3 Location
Est Cost Oper Paid 0.0
Est Cost Prop Damage 206970.0
Est Cost Emergency 0.0
Est Cost Other 0.0
Gas Cost In Mcf 4.5
Est Cost Unintentional Release 4261.0
Est Cost Intentional Release 0.0
Prpty 211231.0
Commercial Affected 7.0
Industrial Affected 0.0
Residences Affected 0.0
Num Persons Hosp Not Ovnght 0.0
Num Injured Treated By Emt 0.0
Num Resident Building Affctd 0.0
Num Business Building Affctd 7.0
Accident Psig 55.0
Normal Psig 55.0
Mop Psig 75.0
Mop Cfr Section 192.619(A)(2) View CFR 49 §192
Maop Established Date 2003-02-20 00:00:00
Accident Pressure Pressure Did Not Exceed Maop
Gas Odorized System Type None
Gas Odorized Lvl Not Msrd Ind Yes
Scada In Place Ind No
Accident Identifier Notification From Third Party That Caused The Incident
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Excavation damage from a telecom install.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind Yes
One Call System Ind Yes
State Law Exempt Ind No
Notify Cga Dirt No
Pipeline Easement Row Ind Yes
Joint Trench Ind No
Cross Bore Ind No
Depth Of Grade > 36�
Excavator Type Contractor
Excavator Equipment Boring
Work Performed Telecommunications
One Call Notified Ind Yes
White Lined Ind Unknown
Locator Type Contract Locator
Visible Marks Yes
Service Interruption Yes
Service Interruption Hours 8.0
Root Cause Category Excavation Issue
Root Cause Type Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name C********** R******
Preparer Title Gas Regulatory Compliance Analyst
Preparer Email C******************@d**********.com
Preparer Telephone 704-731-4680
Authorizer Name F***** B****
Authorizer Title Pipeline Safety Governance Manager
Authorizer Telephone 704-731-4618
Authorizer Email F***********@d**********.com
Narrative Contractor bored into a 6" plastic main while installing a fiber conduit. The damage resulted in 7 customer outages. Use of mechanized equipment in the tolerance zone & excavator failed to support and protect facilities. The national response center (nrc) was not notified because at the time of the incident it was not expected to meet the reporting threshold.

All rights reserved. Copyright © by ClearPHMSA