GD incident on 2025-03-21 — PA

Operator
Ugi Utilities, Inc
Cause
Natural Force Damage
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2025-03-21 00:00 UTC
Report number
Location
PA, TIOGA
Narrative
At around 06:58 on february 20, 2025, ugi received internal electronic, non-scada, low-pressure alerts at multiple local district regulator stations near blossburg pennsylvania. At 12:33, two valves were shut off, stopping the flow of gas to the line break. It was discovered that a weld joint separated on ugi's hpdl right-of-way within a state forest. In response to this incident, a 6-mile stretch of main has been isolated and abandoned. Ugi is conducting an ongoing investigation. Costs are still being calculated and remain $0 until final amounts can be compiled. A generic date has been entered for part e 3.B 'date maop established' because the date is unknown. A supplemental report shall be submitted once the cause has been confirmed and costs are finalized.
Detailed record list
Report Received Date
2025-03-21 00:00:00
Iyear
2025.0
Report Number
20250012.0
Supplemental Number
40665.0
Report Type
Original
Operator Id
Name
Ugi Utilities, Inc
Operator Street Address
1 Ugi Drive
Operator City Name
Denver
Operator State Abbreviation
PA
Operator Postal Code
17517.0
Time Zone
Eastern
Daylight Savings Ind
No
Location Street Address
Between Rose Valley Rd And Lake Rd
Location City Name
Morris Run
Location County Name
Tioga
Location State Abbreviation
PA
Location Postal Code
17771.0
Location Latitude
Location Longitude
Flow Cont Key Crit Ind
Yes
Nrc Rpt Num
Additional Nrc Report Numbers
1424111.0
Commodity Released Type
Natural Gas
Unintentional Release
8541.0
Intentional Release
15.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Num Pub Evacuated
0.0
Communication State Fed Ind
No
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
36.0
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Investor Owned
System Part Involved
Main
Pipe Diameter
5.25
Pipe Specification
Unknown
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
To Be Determined
Wt Steel
0.227
Release Type
Rupture
Rupture Orient
Circumferential
Rupture Length
15.1
Rupture Width
1
Class Location Type
Class 1 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
0.0
Est Cost Emergency
0.0
Est Cost Other
0.0
Gas Cost In Mcf
3.52
Est Cost Unintentional Release
30064.0
Est Cost Intentional Release
53.0
Prpty
30117.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
0.0
Num Persons Hosp Not Ovnght
0.0
Num Injured Treated By Emt
0.0
Num Resident Building Affctd
0.0
Num Business Building Affctd
0.0
Accident Psig
152.0
Normal Psig
155.0
Mop Psig
175.0
Mop Cfr Section
192.619(A)(3)
Maop Established Date
2025-03-21 00:00:00
Accident Pressure
Pressure Did Not Exceed Maop
Gas Odorized System Type
Injection Pump
Gas Odorized Lvl Not Msrd Ind
Yes
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Other
Accident Details
Alert From Pressure Monitoring System At District Regulator Station.
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Their actions did not warrant the need for investigation.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Natural Force Damage
Cause Details
Temperature
Natural Force Type
Temperature
Temperature Subtype
Frost Heave
Nf Extreme Weather Ind
No
Preparer Name
C*** R*****
Preparer Title
Standards Engineer
Preparer Email
C******@u**.com
Preparer Telephone
484-577-6666
Local Contact Name
P*** N*******
Local Contact Email
P********@u**.com
Local Contact Telephone
570-417-7627
Authorizer Name
P***** J*****
Authorizer Title
Vp Ehs And Technical Support
Authorizer Telephone
484-824-5508
Authorizer Email
P******@u**.com
Narrative
At around 06:58 on february 20, 2025, ugi received internal electronic, non-scada, low-pressure alerts at multiple local district regulator stations near blossburg pennsylvania. At 12:33, two valves were shut off, stopping the flow of gas to the line break. It was discovered that a weld joint separated on ugi's hpdl right-of-way within a state forest. In response to this incident, a 6-mile stretch of main has been isolated and abandoned. Ugi is conducting an ongoing investigation. Costs are still being calculated and remain $0 until final amounts can be compiled. A generic date has been entered for part e 3.B 'date maop established' because the date is unknown. A supplemental report shall be submitted once the cause has been confirmed and costs are finalized.
Report Received Date 2025-03-21 00:00:00
Iyear 2025.0
Report Number 20250012.0
Supplemental Number 40665.0
Report Type Original
Operator Id 20010 PHMSA Enforcement
Name Ugi Utilities, Inc
Operator Street Address 1 Ugi Drive
Operator City Name Denver
Operator State Abbreviation PA
Operator Postal Code 17517.0
Time Zone Eastern
Daylight Savings Ind No
Location Street Address Between Rose Valley Rd And Lake Rd
Location City Name Morris Run
Location County Name Tioga
Location State Abbreviation PA
Location Postal Code 17771.0
Location Latitude 41.654976 Google Maps OpenStreetMap
Location Longitude -77.00586 Google Maps OpenStreetMap
Flow Cont Key Crit Ind Yes
Nrc Rpt Num 1424020.0 NRC Report How to search
Additional Nrc Report Numbers 1424111.0
Commodity Released Type Natural Gas
Unintentional Release 8541.0
Intentional Release 15.0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind No
Num Pub Evacuated 0.0
Communication State Fed Ind No
Federal No
Location Type Utility Right-Of-Way / Easement
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 36.0
Other Underground Facilities No
Crossing No
Pipe Facility Type Investor Owned
System Part Involved Main
Pipe Diameter 5.25
Pipe Specification Unknown
Pipe Manufacturer Unknown
Material Involved Steel
Steel Seam Type Other
Steel Seam Type Details To Be Determined
Wt Steel 0.227
Release Type Rupture
Rupture Orient Circumferential
Rupture Length 15.1
Rupture Width 1
Class Location Type Class 1 Location
Est Cost Oper Paid 0.0
Est Cost Prop Damage 0.0
Est Cost Emergency 0.0
Est Cost Other 0.0
Gas Cost In Mcf 3.52
Est Cost Unintentional Release 30064.0
Est Cost Intentional Release 53.0
Prpty 30117.0
Commercial Affected 0.0
Industrial Affected 0.0
Residences Affected 0.0
Num Persons Hosp Not Ovnght 0.0
Num Injured Treated By Emt 0.0
Num Resident Building Affctd 0.0
Num Business Building Affctd 0.0
Accident Psig 152.0
Normal Psig 155.0
Mop Psig 175.0
Mop Cfr Section 192.619(A)(3) View CFR 49 §192
Maop Established Date 2025-03-21 00:00:00
Accident Pressure Pressure Did Not Exceed Maop
Gas Odorized System Type Injection Pump
Gas Odorized Lvl Not Msrd Ind Yes
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Accident Identifier Other
Accident Details Alert From Pressure Monitoring System At District Regulator Station.
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Their actions did not warrant the need for investigation.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Natural Force Damage
Cause Details Temperature
Natural Force Type Temperature
Temperature Subtype Frost Heave
Nf Extreme Weather Ind No
Preparer Name C*** R*****
Preparer Title Standards Engineer
Preparer Email C******@u**.com
Preparer Telephone 484-577-6666
Local Contact Name P*** N*******
Local Contact Email P********@u**.com
Local Contact Telephone 570-417-7627
Authorizer Name P***** J*****
Authorizer Title Vp Ehs And Technical Support
Authorizer Telephone 484-824-5508
Authorizer Email P******@u**.com
Narrative At around 06:58 on february 20, 2025, ugi received internal electronic, non-scada, low-pressure alerts at multiple local district regulator stations near blossburg pennsylvania. At 12:33, two valves were shut off, stopping the flow of gas to the line break. It was discovered that a weld joint separated on ugi's hpdl right-of-way within a state forest. In response to this incident, a 6-mile stretch of main has been isolated and abandoned. Ugi is conducting an ongoing investigation. Costs are still being calculated and remain $0 until final amounts can be compiled. A generic date has been entered for part e 3.B 'date maop established' because the date is unknown. A supplemental report shall be submitted once the cause has been confirmed and costs are finalized.

All rights reserved. Copyright © by ClearPHMSA