HL incident on 2024-12-23 — TX

Operator
Copano Ngl Services Llc
Cause
Equipment Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$203,000
Incident datetime
2024-12-23 00:00 UTC
Report number
Location
TX
Narrative
On november 11, 2024, copano field personnel discovered a small patch of ice at mlv-1 and heard a "leaking" sound while completing routine valve maintenance. The "cop6-brenham" line was promptly isolated and the remaining product in the line was flared to start repairs. A fatigued flange gasket on an underground valve was determined to be the cause of the leak at mlv-1. Repairs included installing a new spiral wound 304 stainless gasket on mlv-1. The ngl line was returned to service on november 22, 2024.
Detailed record list
Report Received Date
2024-12-23 00:00:00
Iyear
2024
Report Number
20240297
Supplemental Number
40484
Report Type
Supplemental Final
Operator Id
Name
Copano Ngl Services Llc
Operator Street Address
1001 Louisiana St, Suite 1000
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls
0.1
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
No
Nrc Rpt Num
Additional Nrc Report Numbers
1416212
Ignite Ind
No
Upstream Action Taken
Operational Control
Upstream Oprtnl Cntrl Detail
Isolation Of Affected Segment By Shutting In The System Initially.
Downstream Action Taken
Operational Control
Downstream Oprtnl Cntrl Detail
Isolation Of Affected Segment By Shutting In The System Initially.
Num Pub Evacuated
0
Pipe Fac Name
Copano
Segment Name
Cop6-Brenham
Onshore State Abbreviation
Tx
Onshore Postal Code
78934
Onshore City Name
Not Within A Municipality
Onshore County Name
Colorado
Designated Location
Survey Station No.
Designated Name
Sta 82473.03
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
96
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Flange Assembly
Installation Year
1987
Manufactured Year
Unknown
Material Involved
Material Other Than Carbon Steel
Material Details
Cellulose Fiber Base Gasket
Release Type
Leak
Leak Type
Other
Leak Type Other
Gasket Outside Of Valve Body
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
85000
Est Cost Prop Damage
203000
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
288000
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
786
Mop Psig
1440
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
1987-01-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Cr or controller actions did not contribute to gasket failure.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
Gasket
Eq Additional Other Ind
Yes
Eq Additional Other Details
Gasket Material Fatigue Due To Age; Original Installation In 1987.
Preparer Name
V*******
Preparer Title
Pipeline Engineer
Preparer Email
V**************@k***********.com
Prepared Date
2025-02-07 00:00:00
Authorizer Name
V*******
Authorizer Telephone
7134202595
Authorizer Title
Pipeline Engineer
Authorizer Email
V**************@k***********.com
Narrative
On november 11, 2024, copano field personnel discovered a small patch of ice at mlv-1 and heard a "leaking" sound while completing routine valve maintenance. The "cop6-brenham" line was promptly isolated and the remaining product in the line was flared to start repairs. A fatigued flange gasket on an underground valve was determined to be the cause of the leak at mlv-1. Repairs included installing a new spiral wound 304 stainless gasket on mlv-1. The ngl line was returned to service on november 22, 2024.
Report Received Date 2024-12-23 00:00:00
Iyear 2024
Report Number 20240297
Supplemental Number 40484
Report Type Supplemental Final
Operator Id 32114 PHMSA Enforcement
Name Copano Ngl Services Llc
Operator Street Address 1001 Louisiana St, Suite 1000
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 29.693369 Google Maps OpenStreetMap
Location Longitude -96.642615 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls 0.1
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Communication State Fed Ind No
Nrc Rpt Num 1416081 NRC Report How to search
Additional Nrc Report Numbers 1416212
Ignite Ind No
Upstream Action Taken Operational Control
Upstream Oprtnl Cntrl Detail Isolation Of Affected Segment By Shutting In The System Initially.
Downstream Action Taken Operational Control
Downstream Oprtnl Cntrl Detail Isolation Of Affected Segment By Shutting In The System Initially.
Num Pub Evacuated 0
Pipe Fac Name Copano
Segment Name Cop6-Brenham
Onshore State Abbreviation Tx
Onshore Postal Code 78934
Onshore City Name Not Within A Municipality
Onshore County Name Colorado
Designated Location Survey Station No.
Designated Name Sta 82473.03
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 96
Crossing No
Pipe Facility Type Intrastate
Item Involved Flange Assembly
Installation Year 1987
Manufactured Year Unknown
Material Involved Material Other Than Carbon Steel
Material Details Cellulose Fiber Base Gasket
Release Type Leak
Leak Type Other
Leak Type Other Gasket Outside Of Valve Body
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 85000
Est Cost Prop Damage 203000
Est Cost Emergency 0
Est Cost Environmental 0
Est Cost Other 0
Prpty 288000
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 786
Mop Psig 1440
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 1987-01-01 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Cr or controller actions did not contribute to gasket failure.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Non-Threaded Connection Failure
Eq Failure Type Non-Threaded Connection Failure
Other Non Threaded Ind Gasket
Eq Additional Other Ind Yes
Eq Additional Other Details Gasket Material Fatigue Due To Age; Original Installation In 1987.
Preparer Name V*******
Preparer Title Pipeline Engineer
Preparer Email V**************@k***********.com
Prepared Date 2025-02-07 00:00:00
Authorizer Name V*******
Authorizer Telephone 7134202595
Authorizer Title Pipeline Engineer
Authorizer Email V**************@k***********.com
Narrative On november 11, 2024, copano field personnel discovered a small patch of ice at mlv-1 and heard a "leaking" sound while completing routine valve maintenance. The "cop6-brenham" line was promptly isolated and the remaining product in the line was flared to start repairs. A fatigued flange gasket on an underground valve was determined to be the cause of the leak at mlv-1. Repairs included installing a new spiral wound 304 stainless gasket on mlv-1. The ngl line was returned to service on november 22, 2024.

All rights reserved. Copyright © by ClearPHMSA