Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2024-12-19 — TX
Operator
Sunoco Pipeline L.p.
Cause
Incorrect Operation
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2024-12-19 00:00 UTC
Report number
Location
TX
Narrative
On 12/03/24 at approximately 11:28, a diesel fuel leak was discovered at montello pump station during maintenance activities. While readying line 6 and line 9 for hydro-test, contractors opened the first flange, introducing air into the pipe, which resulted in product flowing out of the open 10-inch pipe in the 600 manifold area. Product flow was reduced so a 10-inch blind flange could be installed. The blind stopped the flow and isolated the line. Approximately 30 bbls of diesel fuel was released. An onsite vacuum truck responded to collect free product. An osro was mobilized for additional clean-up. The investigation determined that the leak occurred due to the line not being vented at the high point. To prevent reoccurrence in similar situations, an inspector or company representative will verify the drained volume vs line fill comparison prior to completion of the drain down.
Detailed record list
Report Received Date
2024-12-19 00:00:00
Iyear
2024
Report Number
20240293
Supplemental Number
40344
Report Type
Original Final
Operator Id
18718
Name
Sunoco Pipeline L.p.
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Eastern
Daylight Savings Ind
No
Location Latitude
40.316053
Location Longitude
-76.038183
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
30
Recovered Bbls
30
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Line Already Down For Maintenace
Communication State Fed Ind
No
Nrc Rpt Num
1417894
Additional Nrc Report Numbers
1418050
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
Yes
Osro Arrived On Site Dt
12/3/2024 14:00
Num Pub Evacuated
0
Pipe Fac Name
Montello Pump Station
Segment Name
600 Manifold Piping
Onshore State Abbreviation
Pa
Onshore Postal Code
19608
Onshore City Name
Spring Township
Onshore County Name
Berks
Designated Location
Survey Station No.
Designated Name
0+00
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Flange Assembly
Installation Year
Unknown
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Product Released After Spool Piece Removed During Hydrotest Preparation.
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
100
Est Cost Prop Damage
0
Est Cost Emergency
20000
Est Cost Environmental
45000
Est Cost Other
0
Prpty
65100
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
0
Mop Psig
280
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
2018-05-11 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
Yes
Num Contractors Tested
1
Num Contractors Failed
0
Cause
Incorrect Operation
Cause Details
Other Incorrect Operation
Operation Type
Other Incorrect Operation
Operation Details
Contractor Failed To Drain Down Line Completely Prior To Hyrdo-Test.
Related Failure Follow Ind
Yes
Category Type
Other Maintenance
Operator Qualification Ind
Yes
Qualified Individuals
Yes, They Were Qualified For The Task(S)
Preparer Name
T*** N*******
Preparer Title
Director - Dot Compliance
Preparer Email
T************@e*************.com
Preparer Telephone
713-989-7126
Prepared Date
2024-12-19 00:00:00
Authorizer Name
T*** N*******
Authorizer Telephone
713-989-7126
Authorizer Title
Director - Dot Compliance
Authorizer Email
T************@e*************.com
Narrative
On 12/03/24 at approximately 11:28, a diesel fuel leak was discovered at montello pump station during maintenance activities. While readying line 6 and line 9 for hydro-test, contractors opened the first flange, introducing air into the pipe, which resulted in product flowing out of the open 10-inch pipe in the 600 manifold area. Product flow was reduced so a 10-inch blind flange could be installed. The blind stopped the flow and isolated the line. Approximately 30 bbls of diesel fuel was released. An onsite vacuum truck responded to collect free product. An osro was mobilized for additional clean-up. The investigation determined that the leak occurred due to the line not being vented at the high point. To prevent reoccurrence in similar situations, an inspector or company representative will verify the drained volume vs line fill comparison prior to completion of the drain down.
Report Received Date | 2024-12-19 00:00:00 |
---|---|
Iyear | 2024 |
Report Number | 20240293 |
Supplemental Number | 40344 |
Report Type | Original Final |
Operator Id | 18718 PHMSA Enforcement |
Name | Sunoco Pipeline L.p. |
Operator Street Address | 1300 Main Street |
Operator City Name | Houston |
Operator State Abbreviation | TX |
Operator Postal Code | 77002 |
Time Zone | Eastern |
Daylight Savings Ind | No |
Location Latitude | 40.316053 Google Maps OpenStreetMap |
Location Longitude | -76.038183 Google Maps OpenStreetMap |
Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
Commodity Subtype | Diesel, Fuel Oil, Kerosene, Jet Fuel |
Unintentional Release Bbls | 30 |
Recovered Bbls | 30 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Local Operating Personnel, Including Contractors |
Operator Type | Operator Employee |
System Part Involved | Onshore Pump/meter Station Equipment And Piping |
On Off Shore | Onshore |
Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
Shutdown Due Accident Ind | No |
Shutdown Explain | Line Already Down For Maintenace |
Communication State Fed Ind | No |
Nrc Rpt Num | 1417894 NRC Report How to search |
Additional Nrc Report Numbers | 1418050 |
Ignite Ind | No |
Notify Qualified Indiv Ind | Yes |
Oil Spill Removal Org Ind | Yes |
Osro Arrived On Site Dt | 12/3/2024 14:00 |
Num Pub Evacuated | 0 |
Pipe Fac Name | Montello Pump Station |
Segment Name | 600 Manifold Piping |
Onshore State Abbreviation | Pa |
Onshore Postal Code | 19608 |
Onshore City Name | Spring Township |
Onshore County Name | Berks |
Designated Location | Survey Station No. |
Designated Name | 0+00 |
Federal | No |
Location Type | Totally Contained On Operator-Controlled Property |
Incident Area Type | Aboveground |
Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
Crossing | No |
Pipe Facility Type | Interstate |
Item Involved | Flange Assembly |
Installation Year | Unknown |
Manufactured Year | Unknown |
Material Involved | Carbon Steel |
Release Type | Other |
Release Type Details | Product Released After Spool Piece Removed During Hydrotest Preparation. |
Wildlife Impact Ind | No |
Soil Contamination | Yes |
Long Term Assessment | No |
Remediation Ind | Yes |
Soil Remed Ind | Yes |
Water Contam Ind | No |
Could Be Hca | Yes |
Commodity Reached Hca | Yes |
High Pop Ind | Yes |
High Pop Yes No | Yes |
Usa Drinking Ind | Yes |
Usa Drinking Yes No | Yes |
Est Cost Oper Paid | 0 |
Est Cost Gas Released | 100 |
Est Cost Prop Damage | 0 |
Est Cost Emergency | 20000 |
Est Cost Environmental | 45000 |
Est Cost Other | 0 |
Prpty | 65100 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 0 |
Mop Psig | 280 |
Mop Cfr Section | Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192 |
Maop Established Date | 2018-05-11 00:00:00 |
Maop Reversal Flow Ind | No |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Cpm In Place Ind | No |
Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
Investigation Status Details | A review of the accident determined that there were no control room actions that contributed to the event. |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | Yes |
Num Contractors Tested | 1 |
Num Contractors Failed | 0 |
Cause | Incorrect Operation |
Cause Details | Other Incorrect Operation |
Operation Type | Other Incorrect Operation |
Operation Details | Contractor Failed To Drain Down Line Completely Prior To Hyrdo-Test. |
Related Failure Follow Ind | Yes |
Category Type | Other Maintenance |
Operator Qualification Ind | Yes |
Qualified Individuals | Yes, They Were Qualified For The Task(S) |
Preparer Name | T*** N******* |
Preparer Title | Director - Dot Compliance |
Preparer Email | T************@e*************.com |
Preparer Telephone | 713-989-7126 |
Prepared Date | 2024-12-19 00:00:00 |
Authorizer Name | T*** N******* |
Authorizer Telephone | 713-989-7126 |
Authorizer Title | Director - Dot Compliance |
Authorizer Email | T************@e*************.com |
Narrative | On 12/03/24 at approximately 11:28, a diesel fuel leak was discovered at montello pump station during maintenance activities. While readying line 6 and line 9 for hydro-test, contractors opened the first flange, introducing air into the pipe, which resulted in product flowing out of the open 10-inch pipe in the 600 manifold area. Product flow was reduced so a 10-inch blind flange could be installed. The blind stopped the flow and isolated the line. Approximately 30 bbls of diesel fuel was released. An onsite vacuum truck responded to collect free product. An osro was mobilized for additional clean-up. The investigation determined that the leak occurred due to the line not being vented at the high point. To prevent reoccurrence in similar situations, an inspector or company representative will verify the drained volume vs line fill comparison prior to completion of the drain down. |