Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2024-11-27 — TX
Operator
Plains Pipeline Midcon Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$32,230
Incident datetime
2024-11-27 00:00 UTC
Report number
Location
TX
Narrative
Approximately 200 barrels of crude oil were released from the orion to stockholm 8inch pipeline. The date and time of the release (part a q4) are indicative of the earliest possible time the release could have started based on control center data. The cause and preventative measure for the release are under investigation and a supplemental report will be submitted. Supplemental: the date/time provided in part a q4 were determined during the investigation into the release; there were no activities on 10/26/2024 which may have contributed to the release. The potential release was discovered by a controller monitoring the system in the control center, and the release was later confirmed by personnel in the field. The nrc notification was placed within one-hour of discovering estimated costs were expected to exceed $50,000. The cause of the release is attributed to internal corrosion as result of microbiologically induced bacteria (mic). To prevent future incidents, plains cut out, replaced, performed an in-line inspection (ili), and will take further mitigative action as needed based on the ili report.
Detailed record list
Report Received Date
2024-11-27 00:00:00
Iyear
2024
Report Number
20240282
Supplemental Number
40397
Report Type
Supplemental Final
Operator Id
40498
Name
Plains Pipeline Midcon Llc
Operator Street Address
333 Clay Street, Suite 1900
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
36.66959
Location Longitude
-99.64398
Commodity Released Type
Crude Oil
Unintentional Release Bbls
200
Recovered Bbls
200
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Controller
Operator Type
Operator Employee
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Nrc Rpt Num
1415230
Additional Nrc Report Numbers
1415347
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Type Ind
Remotely Controlled
Downstream Action Taken
Valve Closure
Downstream Valve Type Ind
Manual
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Orion To Stockholm 8 Inch
Segment Name
Orion To Stockholm 8 Inch
Onshore State Abbreviation
Ok
Onshore Postal Code
73848
Onshore City Name
Laverne
Onshore County Name
Harper
Designated Location
Milepost
Designated Name
0+4.4mi
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
42
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
8
Pipe Wall Thickness
0.188
Pipe Smys
52000
Pipe Specification
Api 5l
Pipe Seam Type
Erw - Low Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Coating Applied Ind
Yes
Installation Year
1960
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
10000
Est Cost Gas Released
12250
Est Cost Prop Damage
32230
Est Cost Emergency
7000
Est Cost Environmental
155500
Est Cost Other
0
Prpty
216980
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
45
Mop Psig
1250
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
2016-01-01 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
96360
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Schedule Ind
Yes
Invest No Schedule Ind Details
No Indications That The Controller Contributed To Or Caused The Incident
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Microbiological Ind
Yes
Int Metallurgical Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Yes
Corrosion Coupons
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Axial Recent Year
2021
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Metal Loss
Axial Rcnt Atnd Dtct Metal
High Resolution
Axial Previous Year
2018
Axial Prev Propul Method
Free Swimming
Axial Prev Attuned Detect
Metal Loss
Axial Prev Atnd Dtct Metal
High Resolution
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2016
Hydrtst Most Rcnt Pressure
1986
Direct Asmnt Conducted
No
Non Destructive Exam Ind
Yes
Exm Handl Ultrasonic Rcnt Year
2021
Exm Handl Ultrasonic Rcnt Ind
Yes
Preparer Name
N****** A G*******
Preparer Title
Hse Regulatory Compliance Supervisor
Preparer Email
N***************@p*****.com
Preparer Telephone
7136464376
Prepared Date
2025-01-10 00:00:00
Local Contact Name
N****** A G*******
Local Contact Email
N***************@p*****.com
Local Contact Telephone
7136464376
Authorizer Name
N****** A G*******
Authorizer Telephone
7136464376
Authorizer Title
Hse Regulatory Compliance Supervisor
Authorizer Email
N***************@p*****.com
Narrative
Approximately 200 barrels of crude oil were released from the orion to stockholm 8inch pipeline. The date and time of the release (part a q4) are indicative of the earliest possible time the release could have started based on control center data. The cause and preventative measure for the release are under investigation and a supplemental report will be submitted. Supplemental: the date/time provided in part a q4 were determined during the investigation into the release; there were no activities on 10/26/2024 which may have contributed to the release. The potential release was discovered by a controller monitoring the system in the control center, and the release was later confirmed by personnel in the field. The nrc notification was placed within one-hour of discovering estimated costs were expected to exceed $50,000. The cause of the release is attributed to internal corrosion as result of microbiologically induced bacteria (mic). To prevent future incidents, plains cut out, replaced, performed an in-line inspection (ili), and will take further mitigative action as needed based on the ili report.
Report Received Date | 2024-11-27 00:00:00 |
---|---|
Iyear | 2024 |
Report Number | 20240282 |
Supplemental Number | 40397 |
Report Type | Supplemental Final |
Operator Id | 40498 PHMSA Enforcement |
Name | Plains Pipeline Midcon Llc |
Operator Street Address | 333 Clay Street, Suite 1900 |
Operator City Name | Houston |
Operator State Abbreviation | TX |
Operator Postal Code | 77002 |
Time Zone | Central |
Daylight Savings Ind | Yes |
Location Latitude | 36.66959 Google Maps OpenStreetMap |
Location Longitude | -99.64398 Google Maps OpenStreetMap |
Commodity Released Type | Crude Oil |
Unintentional Release Bbls | 200 |
Recovered Bbls | 200 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Controller |
Operator Type | Operator Employee |
System Part Involved | Onshore Pipeline, Including Valve Sites |
On Off Shore | Onshore |
Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
Shutdown Due Accident Ind | Yes |
Communication State Fed Ind | Yes |
Party Initiated Communication | Operator |
Nrc Rpt Num | 1415230 NRC Report How to search |
Additional Nrc Report Numbers | 1415347 |
Ignite Ind | No |
Upstream Action Taken | Valve Closure |
Upstream Valve Type Ind | Remotely Controlled |
Downstream Action Taken | Valve Closure |
Downstream Valve Type Ind | Manual |
Notify Qualified Indiv Ind | Yes |
Oil Spill Removal Org Ind | No |
Num Pub Evacuated | 0 |
Pipe Fac Name | Orion To Stockholm 8 Inch |
Segment Name | Orion To Stockholm 8 Inch |
Onshore State Abbreviation | Ok |
Onshore Postal Code | 73848 |
Onshore City Name | Laverne |
Onshore County Name | Harper |
Designated Location | Milepost |
Designated Name | 0+4.4mi |
Federal | No |
Location Type | Pipeline Right-Of-Way |
Incident Area Type | Underground |
Incident Area Subtype | Under Soil |
Depth Of Cover | 42 |
Crossing | No |
Pipe Facility Type | Interstate |
Item Involved | Pipe |
Pipe Type | Pipe Body |
Puddle Weld Ind | No |
Pipe Diameter | 8 |
Pipe Wall Thickness | 0.188 |
Pipe Smys | 52000 |
Pipe Specification | Api 5l |
Pipe Seam Type | Erw - Low Frequency |
Pipe Manufacturer | Unknown |
Pipe Coating Type | Coal Tar |
Coating Applied Ind | Yes |
Installation Year | 1960 |
Manufactured Year | Unknown |
Material Involved | Carbon Steel |
Release Type | Leak |
Leak Type | Pinhole |
Wildlife Impact Ind | No |
Soil Contamination | Yes |
Long Term Assessment | No |
Remediation Ind | No |
Water Contam Ind | No |
Could Be Hca | No |
Commodity Reached Hca | No |
Est Cost Oper Paid | 10000 |
Est Cost Gas Released | 12250 |
Est Cost Prop Damage | 32230 |
Est Cost Emergency | 7000 |
Est Cost Environmental | 155500 |
Est Cost Other | 0 |
Prpty | 216980 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 45 |
Mop Psig | 1250 |
Mop Cfr Section | Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192 |
Maop Established Date | 2016-01-01 00:00:00 |
Maop Reversal Flow Ind | Bi-Directional |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Length Segment Isolated | 96360 |
Internal Inspection Ind | Yes |
Operation Complications Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | Yes |
Scada Conf Ind | Yes |
Cpm In Place Ind | Yes |
Cpm Operating Ind | Yes |
Cpm Functional Ind | Yes |
Cpm Detection Ind | Yes |
Cpm Conf Ind | Yes |
Investigation Status | Yes, specify investigation result(s): (select all that apply) |
Invest No Schedule Ind | Yes |
Invest No Schedule Ind Details | No Indications That The Controller Contributed To Or Caused The Incident |
Invest No Control Room Ind | Yes |
Invest No Controller Ind | Yes |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Corrosion Failure |
Cause Details | Internal Corrosion |
Internal External | Internal Corrosion |
Int Visual Exam Results | Localized Pitting |
Int Microbiological Ind | Yes |
Int Metallurgical Basis Ind | Yes |
Int Low Point Pipe Loc Ind | Yes |
Corrosion Inhibitors | Yes |
Corrosion Lining | No |
Cleaning Dewatering | Yes |
Corrosion Coupons | Yes |
Collected Data Ind | Yes |
Axial Magnetic Flx Lkg Ind | Yes |
Axial Recent Year | 2021 |
Axial Rcnt Propul Method | Free Swimming |
Axial Rcnt Attuned Detect | Metal Loss |
Axial Rcnt Atnd Dtct Metal | High Resolution |
Axial Previous Year | 2018 |
Axial Prev Propul Method | Free Swimming |
Axial Prev Attuned Detect | Metal Loss |
Axial Prev Atnd Dtct Metal | High Resolution |
Has Hydrtst Conduc Before Ind | Yes |
Hydrtst Most Rcnt Year | 2016 |
Hydrtst Most Rcnt Pressure | 1986 |
Direct Asmnt Conducted | No |
Non Destructive Exam Ind | Yes |
Exm Handl Ultrasonic Rcnt Year | 2021 |
Exm Handl Ultrasonic Rcnt Ind | Yes |
Preparer Name | N****** A G******* |
Preparer Title | Hse Regulatory Compliance Supervisor |
Preparer Email | N***************@p*****.com |
Preparer Telephone | 7136464376 |
Prepared Date | 2025-01-10 00:00:00 |
Local Contact Name | N****** A G******* |
Local Contact Email | N***************@p*****.com |
Local Contact Telephone | 7136464376 |
Authorizer Name | N****** A G******* |
Authorizer Telephone | 7136464376 |
Authorizer Title | Hse Regulatory Compliance Supervisor |
Authorizer Email | N***************@p*****.com |
Narrative | Approximately 200 barrels of crude oil were released from the orion to stockholm 8inch pipeline. The date and time of the release (part a q4) are indicative of the earliest possible time the release could have started based on control center data. The cause and preventative measure for the release are under investigation and a supplemental report will be submitted. Supplemental: the date/time provided in part a q4 were determined during the investigation into the release; there were no activities on 10/26/2024 which may have contributed to the release. The potential release was discovered by a controller monitoring the system in the control center, and the release was later confirmed by personnel in the field. The nrc notification was placed within one-hour of discovering estimated costs were expected to exceed $50,000. The cause of the release is attributed to internal corrosion as result of microbiologically induced bacteria (mic). To prevent future incidents, plains cut out, replaced, performed an in-line inspection (ili), and will take further mitigative action as needed based on the ili report. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA