Operator, cause, commodity and consequences with raw source fields.
HL incident on 2024-11-22 — CO
Operator
Elevation Midstream
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$700
Incident datetime
2024-11-22 00:00 UTC
Report number
Location
CO
Narrative
While preparing the pipeline to send the ili tool down the line; operators contacted mvp control room to let them know that they were placing the valves in local operation. Mvp control room operated the main valve to the closed position, opened up bypass, closed kicker valve, control room confirmed valves 0% open and then on-site operations confirmed that the valves were closed then put in manual operations by operations. Drained barrel to sump . Bypass was open everything else was closed. When control room started the flow; liquid began spraying out of kicker valve. Operations immediately called control room to stop flow. It appears the cause was failure of the valve to fully seat. Update: elevation physically tested the valve and could not recreate the situation. The valve is fully operational. Programming of the valve closure was also tested and no issues identified. It appears that there was some paraffin debris that may have prevented the valve from fully seating. Elevation is updating the site specific procedure to address this potential issue, paraffin debris preventing full seating of the valve, in the future.
Detailed record list
Report Received Date
2024-11-22 00:00:00
Iyear
2024
Report Number
20240279
Supplemental Number
40476
Report Type
Supplemental
Operator Id
39746
Name
Elevation Midstream
Operator Street Address
1200 17th Street, Suite 750
Operator City Name
Denver
Operator State Abbreviation
CO
Operator Postal Code
80202
Time Zone
Mountain
Daylight Savings Ind
Yes
Location Latitude
40.20235
Location Longitude
-104.60803
Commodity Released Type
Crude Oil
Unintentional Release Bbls
10
Recovered Bbls
8
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
No
Nrc Rpt Num
1414462
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Type Ind
Remotely Controlled
Downstream Action Taken
Valve Closure
Downstream Valve Type Ind
Remotely Controlled
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Freedom Pipeline
Segment Name
Saddlehorn Freedom Launcher
Onshore State Abbreviation
Co
Onshore Postal Code
80642
Onshore City Name
Not Within A Municipality
Onshore County Name
Weld
Designated Location
Milepost
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Valve
Valve Type
Mainline
Valve Mainline Type
Other
Valve Mainline Details
Kicker Valve
Valve Manufacturer
M&j
Installation Year
2020
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
May Have Not Been Fully Seated
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
700
Est Cost Emergency
0
Est Cost Environmental
125000
Est Cost Other
0
Prpty
125700
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
110
Mop Psig
1480
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2020-05-07 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
20
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
3
Num Employees Failed
0
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Control Valve Ind
Yes
Ief Addl Misalignment Ind
Yes
Eqf Control Releaf Ind
Yes
Preparer Name
L** K****
Preparer Title
Vice President Ehs Regulatory Compliance
Preparer Email
L*****@e*****************.com
Preparer Telephone
3038824404
Prepared Date
2025-02-04 00:00:00
Local Contact Name
K**** S******
Local Contact Email
K*******@e*****************.com
Local Contact Telephone
9703965494
Authorizer Name
L** K****
Authorizer Telephone
3038824404
Authorizer Title
Vice President Ehs Regulatory Compliance
Authorizer Email
L*****@e*****************.com
Narrative
While preparing the pipeline to send the ili tool down the line; operators contacted mvp control room to let them know that they were placing the valves in local operation. Mvp control room operated the main valve to the closed position, opened up bypass, closed kicker valve, control room confirmed valves 0% open and then on-site operations confirmed that the valves were closed then put in manual operations by operations. Drained barrel to sump . Bypass was open everything else was closed. When control room started the flow; liquid began spraying out of kicker valve. Operations immediately called control room to stop flow. It appears the cause was failure of the valve to fully seat. Update: elevation physically tested the valve and could not recreate the situation. The valve is fully operational. Programming of the valve closure was also tested and no issues identified. It appears that there was some paraffin debris that may have prevented the valve from fully seating. Elevation is updating the site specific procedure to address this potential issue, paraffin debris preventing full seating of the valve, in the future.
Report Received Date | 2024-11-22 00:00:00 |
---|---|
Iyear | 2024 |
Report Number | 20240279 |
Supplemental Number | 40476 |
Report Type | Supplemental |
Operator Id | 39746 PHMSA Enforcement |
Name | Elevation Midstream |
Operator Street Address | 1200 17th Street, Suite 750 |
Operator City Name | Denver |
Operator State Abbreviation | CO |
Operator Postal Code | 80202 |
Time Zone | Mountain |
Daylight Savings Ind | Yes |
Location Latitude | 40.20235 Google Maps OpenStreetMap |
Location Longitude | -104.60803 Google Maps OpenStreetMap |
Commodity Released Type | Crude Oil |
Unintentional Release Bbls | 10 |
Recovered Bbls | 8 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Local Operating Personnel, Including Contractors |
Operator Type | Operator Employee |
System Part Involved | Onshore Pipeline, Including Valve Sites |
On Off Shore | Onshore |
Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
Shutdown Due Accident Ind | Yes |
Communication State Fed Ind | No |
Nrc Rpt Num | 1414462 NRC Report How to search |
Ignite Ind | No |
Upstream Action Taken | Valve Closure |
Upstream Valve Type Ind | Remotely Controlled |
Downstream Action Taken | Valve Closure |
Downstream Valve Type Ind | Remotely Controlled |
Notify Qualified Indiv Ind | Yes |
Oil Spill Removal Org Ind | No |
Num Pub Evacuated | 0 |
Pipe Fac Name | Freedom Pipeline |
Segment Name | Saddlehorn Freedom Launcher |
Onshore State Abbreviation | Co |
Onshore Postal Code | 80642 |
Onshore City Name | Not Within A Municipality |
Onshore County Name | Weld |
Designated Location | Milepost |
Designated Name | 0 |
Federal | No |
Location Type | Totally Contained On Operator-Controlled Property |
Incident Area Type | Aboveground |
Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
Crossing | No |
Pipe Facility Type | Intrastate |
Item Involved | Valve |
Valve Type | Mainline |
Valve Mainline Type | Other |
Valve Mainline Details | Kicker Valve |
Valve Manufacturer | M&j |
Installation Year | 2020 |
Manufactured Year | Unknown |
Material Involved | Carbon Steel |
Release Type | Leak |
Leak Type | Other |
Leak Type Other | May Have Not Been Fully Seated |
Wildlife Impact Ind | No |
Soil Contamination | Yes |
Long Term Assessment | No |
Remediation Ind | Yes |
Soil Remed Ind | Yes |
Water Contam Ind | No |
Could Be Hca | No |
Commodity Reached Hca | No |
Est Cost Oper Paid | 0 |
Est Cost Gas Released | 0 |
Est Cost Prop Damage | 700 |
Est Cost Emergency | 0 |
Est Cost Environmental | 125000 |
Est Cost Other | 0 |
Prpty | 125700 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 110 |
Mop Psig | 1480 |
Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
Maop Established Date | 2020-05-07 00:00:00 |
Maop Reversal Flow Ind | No |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Length Segment Isolated | 20 |
Internal Inspection Ind | Yes |
Operation Complications Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Cpm In Place Ind | No |
Investigation Status | Yes, specify investigation result(s): (select all that apply) |
Invest No Control Room Ind | Yes |
Invest No Controller Ind | Yes |
Employee Drug Test Ind | Yes |
Contractor Drug Test Ind | No |
Num Employees Tested | 3 |
Num Employees Failed | 0 |
Cause | Equipment Failure |
Cause Details | Malfunction Of Control/relief Equipment |
Eq Failure Type | Malfunction Of Control/relief Equipment |
Control Valve Ind | Yes |
Ief Addl Misalignment Ind | Yes |
Eqf Control Releaf Ind | Yes |
Preparer Name | L** K**** |
Preparer Title | Vice President Ehs Regulatory Compliance |
Preparer Email | L*****@e*****************.com |
Preparer Telephone | 3038824404 |
Prepared Date | 2025-02-04 00:00:00 |
Local Contact Name | K**** S****** |
Local Contact Email | K*******@e*****************.com |
Local Contact Telephone | 9703965494 |
Authorizer Name | L** K**** |
Authorizer Telephone | 3038824404 |
Authorizer Title | Vice President Ehs Regulatory Compliance |
Authorizer Email | L*****@e*****************.com |
Narrative | While preparing the pipeline to send the ili tool down the line; operators contacted mvp control room to let them know that they were placing the valves in local operation. Mvp control room operated the main valve to the closed position, opened up bypass, closed kicker valve, control room confirmed valves 0% open and then on-site operations confirmed that the valves were closed then put in manual operations by operations. Drained barrel to sump . Bypass was open everything else was closed. When control room started the flow; liquid began spraying out of kicker valve. Operations immediately called control room to stop flow. It appears the cause was failure of the valve to fully seat. Update: elevation physically tested the valve and could not recreate the situation. The valve is fully operational. Programming of the valve closure was also tested and no issues identified. It appears that there was some paraffin debris that may have prevented the valve from fully seating. Elevation is updating the site specific procedure to address this potential issue, paraffin debris preventing full seating of the valve, in the future. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA