HL incident on 2024-11-21 — KS

Operator
Flint Hills Resources, Lc
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$83,508
Incident datetime
2024-11-21 00:00 UTC
Report number
Location
KS
Narrative
At approximately 12:10 on october 22, 2024, an fhr operator discovered a hydrocarbon odor and sheen on groundwater inside the check valve and block valve pit while performing a routine inspection. The fhr operator detected no lel readings inside the valve pits or at ground level. There was no indication of an active release at the time of discovery. The quantity of released product was estimated to be less than 1 gallon of diesel. At 15:00, a vacuum truck arrived on site and removed the water with sheen from valve pits. The valves and piping were inspected using a 360 camera and no leak was identified. On wednesday, october 23, 2024, fhr excavated the valves. No contaminated soil was discovered during excavation. On thursday, october 24, 2024, the coating on the check valve and block valve was removed. Once removed, fhr personnel noticed staining around the flange lid on the check valve. No staining was observed on the block valve. Onsite personnel retorqued the lid bolts on the check valve and discovered one bolt was loose. A function test was performed once all bolts were retorqued. There were no signs of an active release upon completion of the function test. The check valve was monitored while a repair plan was developed, and contractors were mobilized to the site to complete the repair. While some small staining was noted, no free product was present. On wednesday, november 6, 2024, a hot bolt injection repair was performed to seal the flange lid. No signs of staining have been observed since the check valve lid repair was complete.
Detailed record list
Report Received Date
2024-11-21 00:00:00
Iyear
2024
Report Number
20240277
Supplemental Number
40242
Report Type
Original Final
Operator Id
Name
Flint Hills Resources, Lc
Operator Street Address
4111 East 37th Street North
Operator City Name
Wichita
Operator State Abbreviation
KS
Operator Postal Code
67220
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
0.1
Recovered Bbls
0.1
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Routine Shutdown
Communication State Fed Ind
No
Nrc Rpt Num
Additional Nrc Report Numbers
1414631
Ignite Ind
No
Upstream Action Taken
Operational Control
Upstream Oprtnl Cntrl Detail
Line Was Already Shutdown, No Active Release.
Downstream Action Taken
Operational Control
Downstream Oprtnl Cntrl Detail
Line Was Already Shutdown, No Active Release.
Notify Qualified Indiv Ind
No
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Wpl Refined Products 10"
Segment Name
Waupun To Milwaukee / 5403
Onshore State Abbreviation
Wi
Onshore Postal Code
53091
Onshore City Name
Theresa
Onshore County Name
Dodge
Designated Location
Survey Station No.
Designated Name
985+63
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
In Underground Enclosed Space (E.g. Vault)
Depth Of Cover
48
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Mainline
Valve Mainline Type
Check
Valve Manufacturer
Judd Valve Co.
Installation Year
1988
Manufactured Year
1988
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
Yes
Groundwater Contam Ind
Yes
Amount Released
0.1
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
2
Est Cost Prop Damage
83508
Est Cost Emergency
0
Est Cost Environmental
1155
Est Cost Other
0
Prpty
84665
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
178
Mop Psig
1440
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
1988-07-17 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
It was determined that neither controller actions, nor control room issues contributed to the accident.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
O-Ring
Eq Additional Other Ind
Yes
Eq Additional Other Details
Loose Bolt
Preparer Name
M***** P****
Preparer Title
Compliance Managment System Specialist
Preparer Email
M***********@f**.com
Preparer Telephone
361-242-8781
Prepared Date
2024-11-21 00:00:00
Authorizer Name
K**** W**********
Authorizer Telephone
316-847-6538
Authorizer Title
Compliance Specialist
Authorizer Email
K****************@f**.com
Narrative
At approximately 12:10 on october 22, 2024, an fhr operator discovered a hydrocarbon odor and sheen on groundwater inside the check valve and block valve pit while performing a routine inspection. The fhr operator detected no lel readings inside the valve pits or at ground level. There was no indication of an active release at the time of discovery. The quantity of released product was estimated to be less than 1 gallon of diesel. At 15:00, a vacuum truck arrived on site and removed the water with sheen from valve pits. The valves and piping were inspected using a 360 camera and no leak was identified. On wednesday, october 23, 2024, fhr excavated the valves. No contaminated soil was discovered during excavation. On thursday, october 24, 2024, the coating on the check valve and block valve was removed. Once removed, fhr personnel noticed staining around the flange lid on the check valve. No staining was observed on the block valve. Onsite personnel retorqued the lid bolts on the check valve and discovered one bolt was loose. A function test was performed once all bolts were retorqued. There were no signs of an active release upon completion of the function test. The check valve was monitored while a repair plan was developed, and contractors were mobilized to the site to complete the repair. While some small staining was noted, no free product was present. On wednesday, november 6, 2024, a hot bolt injection repair was performed to seal the flange lid. No signs of staining have been observed since the check valve lid repair was complete.
Report Received Date 2024-11-21 00:00:00
Iyear 2024
Report Number 20240277
Supplemental Number 40242
Report Type Original Final
Operator Id 22855 PHMSA Enforcement
Name Flint Hills Resources, Lc
Operator Street Address 4111 East 37th Street North
Operator City Name Wichita
Operator State Abbreviation KS
Operator Postal Code 67220
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 43.504 Google Maps OpenStreetMap
Location Longitude -88.4601 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls 0.1
Recovered Bbls 0.1
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Routine Shutdown
Communication State Fed Ind No
Nrc Rpt Num 1414404 NRC Report How to search
Additional Nrc Report Numbers 1414631
Ignite Ind No
Upstream Action Taken Operational Control
Upstream Oprtnl Cntrl Detail Line Was Already Shutdown, No Active Release.
Downstream Action Taken Operational Control
Downstream Oprtnl Cntrl Detail Line Was Already Shutdown, No Active Release.
Notify Qualified Indiv Ind No
Oil Spill Removal Org Ind No
Num Pub Evacuated 0
Pipe Fac Name Wpl Refined Products 10"
Segment Name Waupun To Milwaukee / 5403
Onshore State Abbreviation Wi
Onshore Postal Code 53091
Onshore City Name Theresa
Onshore County Name Dodge
Designated Location Survey Station No.
Designated Name 985+63
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype In Underground Enclosed Space (E.g. Vault)
Depth Of Cover 48
Crossing No
Pipe Facility Type Interstate
Item Involved Valve
Valve Type Mainline
Valve Mainline Type Check
Valve Manufacturer Judd Valve Co.
Installation Year 1988
Manufactured Year 1988
Material Involved Carbon Steel
Release Type Leak
Leak Type Connection Failure
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind Yes
Groundwater Contam Ind Yes
Amount Released 0.1
Could Be Hca Yes
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 2
Est Cost Prop Damage 83508
Est Cost Emergency 0
Est Cost Environmental 1155
Est Cost Other 0
Prpty 84665
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 178
Mop Psig 1440
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 1988-07-17 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details It was determined that neither controller actions, nor control room issues contributed to the accident.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Non-Threaded Connection Failure
Eq Failure Type Non-Threaded Connection Failure
Other Non Threaded Ind O-Ring
Eq Additional Other Ind Yes
Eq Additional Other Details Loose Bolt
Preparer Name M***** P****
Preparer Title Compliance Managment System Specialist
Preparer Email M***********@f**.com
Preparer Telephone 361-242-8781
Prepared Date 2024-11-21 00:00:00
Authorizer Name K**** W**********
Authorizer Telephone 316-847-6538
Authorizer Title Compliance Specialist
Authorizer Email K****************@f**.com
Narrative At approximately 12:10 on october 22, 2024, an fhr operator discovered a hydrocarbon odor and sheen on groundwater inside the check valve and block valve pit while performing a routine inspection. The fhr operator detected no lel readings inside the valve pits or at ground level. There was no indication of an active release at the time of discovery. The quantity of released product was estimated to be less than 1 gallon of diesel. At 15:00, a vacuum truck arrived on site and removed the water with sheen from valve pits. The valves and piping were inspected using a 360 camera and no leak was identified. On wednesday, october 23, 2024, fhr excavated the valves. No contaminated soil was discovered during excavation. On thursday, october 24, 2024, the coating on the check valve and block valve was removed. Once removed, fhr personnel noticed staining around the flange lid on the check valve. No staining was observed on the block valve. Onsite personnel retorqued the lid bolts on the check valve and discovered one bolt was loose. A function test was performed once all bolts were retorqued. There were no signs of an active release upon completion of the function test. The check valve was monitored while a repair plan was developed, and contractors were mobilized to the site to complete the repair. While some small staining was noted, no free product was present. On wednesday, november 6, 2024, a hot bolt injection repair was performed to seal the flange lid. No signs of staining have been observed since the check valve lid repair was complete.