HL incident on 2024-10-23 — TX

Operator
Dixie Pipeline Company Llc
Cause
Equipment Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$200
Incident datetime
2024-10-23 00:00 UTC
Report number
Location
TX
Narrative
On september 26, 2024, at 23:30 central time, houston control center (hcc) received an esd alarm at the dixie stegall pump station. Hcc dispatched a field technician to investigate the alarm. The company employee arrived on site at 01:01 and determined the injection filter vessel was leaking from the door seal. The vessel was isolated and bled down immediately eliminating the leak. An investigation of the door seal indicated an o-ring seal had separated and failed. A new o-ring seal was installed, and the vessel was returned to service. Revised part c5 from carbon steel with material other than carbon steel specifying fluorine kautschuk material (fkm).
Detailed record list
Report Received Date
2024-10-23 00:00:00
Iyear
2024
Report Number
20240255
Supplemental Number
40141
Report Type
Supplemental Final
Operator Id
Name
Dixie Pipeline Company Llc
Operator Street Address
1100 Louisiana St.
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Propane
Unintentional Release Bbls
1.9
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Dixie Pipeline/mont Belvieu To Apex (Main Line)
Segment Name
120
Onshore State Abbreviation
La
Onshore Postal Code
70663
Onshore City Name
Sulphur
Onshore County Name
Calcasieu
Designated Location
Survey Station No.
Designated Name
5141+40
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Filter/strainer/separator
Installation Year
2009
Manufactured Year
2009
Material Involved
Material Other Than Carbon Steel
Material Details
Fluorine Kautschuk Material (Fkm)
Release Type
Leak
Leak Type
Other
Leak Type Other
Door O-Ring
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
100
Est Cost Prop Damage
200
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
300
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
678
Mop Psig
1440
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
1962-09-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
O-Ring
Additional Defect Ind
Yes
Preparer Name
N***** G***
Preparer Title
Lead Pipeline Compliance Specialist
Preparer Email
N****@e****.com
Preparer Telephone
985-493-4629
Prepared Date
2024-10-24 00:00:00
Local Contact Name
N***** G***
Local Contact Email
N****@e****.com
Local Contact Telephone
985-493-4629
Authorizer Name
B**** B****
Authorizer Telephone
713-381-2493
Authorizer Title
Transportation Compliance Manager
Authorizer Email
B******@e****.com
Narrative
On september 26, 2024, at 23:30 central time, houston control center (hcc) received an esd alarm at the dixie stegall pump station. Hcc dispatched a field technician to investigate the alarm. The company employee arrived on site at 01:01 and determined the injection filter vessel was leaking from the door seal. The vessel was isolated and bled down immediately eliminating the leak. An investigation of the door seal indicated an o-ring seal had separated and failed. A new o-ring seal was installed, and the vessel was returned to service. Revised part c5 from carbon steel with material other than carbon steel specifying fluorine kautschuk material (fkm).
Report Received Date 2024-10-23 00:00:00
Iyear 2024
Report Number 20240255
Supplemental Number 40141
Report Type Supplemental Final
Operator Id 3445 PHMSA Enforcement
Name Dixie Pipeline Company Llc
Operator Street Address 1100 Louisiana St.
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 30.26541 Google Maps OpenStreetMap
Location Longitude -93.410997 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Other Hvl
Commodity Details Propane
Unintentional Release Bbls 1.9
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Communication State Fed Ind Yes
Party Initiated Communication Operator
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Num Pub Evacuated 0
Pipe Fac Name Dixie Pipeline/mont Belvieu To Apex (Main Line)
Segment Name 120
Onshore State Abbreviation La
Onshore Postal Code 70663
Onshore City Name Sulphur
Onshore County Name Calcasieu
Designated Location Survey Station No.
Designated Name 5141+40
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Filter/strainer/separator
Installation Year 2009
Manufactured Year 2009
Material Involved Material Other Than Carbon Steel
Material Details Fluorine Kautschuk Material (Fkm)
Release Type Leak
Leak Type Other
Leak Type Other Door O-Ring
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 100
Est Cost Prop Damage 200
Est Cost Emergency 0
Est Cost Environmental 0
Est Cost Other 0
Prpty 300
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 678
Mop Psig 1440
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 1962-09-01 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Non-Threaded Connection Failure
Eq Failure Type Non-Threaded Connection Failure
Other Non Threaded Ind O-Ring
Additional Defect Ind Yes
Preparer Name N***** G***
Preparer Title Lead Pipeline Compliance Specialist
Preparer Email N****@e****.com
Preparer Telephone 985-493-4629
Prepared Date 2024-10-24 00:00:00
Local Contact Name N***** G***
Local Contact Email N****@e****.com
Local Contact Telephone 985-493-4629
Authorizer Name B**** B****
Authorizer Telephone 713-381-2493
Authorizer Title Transportation Compliance Manager
Authorizer Email B******@e****.com
Narrative On september 26, 2024, at 23:30 central time, houston control center (hcc) received an esd alarm at the dixie stegall pump station. Hcc dispatched a field technician to investigate the alarm. The company employee arrived on site at 01:01 and determined the injection filter vessel was leaking from the door seal. The vessel was isolated and bled down immediately eliminating the leak. An investigation of the door seal indicated an o-ring seal had separated and failed. A new o-ring seal was installed, and the vessel was returned to service. Revised part c5 from carbon steel with material other than carbon steel specifying fluorine kautschuk material (fkm).

All rights reserved. Copyright © by ClearPHMSA