HL incident on 2024-10-18 — OK

Operator
Magellan Pipeline Company, Lp
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2024-10-18 00:00 UTC
Report number
Location
OK
Narrative
At 17:30 operations discovered a leak on the east houston to hearne pipeline fast loop sample pump. East houston to hearne was pumping outbound and the fast loop sample pump was running under normal operating conditions. Once it was determined the fast loop sample pump had failed the manual suction and discharge valve to the fast loop pump were closed. Contaminated soil was removed and put in roll-off boxes and pump was replaced.
Detailed record list
Report Received Date
2024-10-18 00:00:00
Iyear
2024
Report Number
20240252
Supplemental Number
40125
Report Type
Original
Operator Id
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
3.29
Recovered Bbls
0.48
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Fast Loop Was Isolated From Pipeline Immediately Upon Discovery
Communication State Fed Ind
No
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Notify Qualified Indiv Ind
No
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
East Houston
Segment Name
Fac Id 357
Onshore State Abbreviation
Tx
Onshore Postal Code
77029
Onshore City Name
Houston
Onshore County Name
Harris
Designated Location
Milepost
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pump
Pump Type
Positive Displacement
Pump Service Type
Other
Pump Service Type Details
Fast Loop Closed Sampling System
Installation Year
2019
Manufactured Year
2018
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
450
Est Cost Prop Damage
0
Est Cost Emergency
12306
Est Cost Environmental
1800
Est Cost Other
0
Prpty
14556
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
91
Mop Psig
500
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2019-04-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
There was no indication that the control room was involved in the release nor that the controller was involved. Scada nor cpm did not indicate that there was a release of any kind.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Pump Or Pump-Related Equipment
Eq Failure Type
Pump Or Pump-Related Equipment
Other Pump Ind
Seal/packing Failure
Ief Addl Misalignment Ind
Yes
Eqf Pump Equipment Ind
Yes
Preparer Name
G*** C*********
Preparer Title
Regulatory Compliance Specialist Ii
Preparer Email
G**************@o****.com
Preparer Telephone
9183818066
Prepared Date
2024-10-18 00:00:00
Authorizer Name
R*** M****
Authorizer Telephone
5807410185
Authorizer Title
Regulatory Compliance Manager
Authorizer Email
R*********@o****.com
Narrative
At 17:30 operations discovered a leak on the east houston to hearne pipeline fast loop sample pump. East houston to hearne was pumping outbound and the fast loop sample pump was running under normal operating conditions. Once it was determined the fast loop sample pump had failed the manual suction and discharge valve to the fast loop pump were closed. Contaminated soil was removed and put in roll-off boxes and pump was replaced.
Report Received Date 2024-10-18 00:00:00
Iyear 2024
Report Number 20240252
Supplemental Number 40125
Report Type Original
Operator Id 22610 PHMSA Enforcement
Name Magellan Pipeline Company, Lp
Operator Street Address 100 West 5th Street
Operator City Name Tulsa
Operator State Abbreviation OK
Operator Postal Code 74103
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 29.794674 Google Maps OpenStreetMap
Location Longitude -95.280781 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Gasoline (Non-Ethanol)
Unintentional Release Bbls 3.29
Recovered Bbls 0.48
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind No
Shutdown Explain Fast Loop Was Isolated From Pipeline Immediately Upon Discovery
Communication State Fed Ind No
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Notify Qualified Indiv Ind No
Oil Spill Removal Org Ind No
Num Pub Evacuated 0
Pipe Fac Name East Houston
Segment Name Fac Id 357
Onshore State Abbreviation Tx
Onshore Postal Code 77029
Onshore City Name Houston
Onshore County Name Harris
Designated Location Milepost
Designated Name 0
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Pump
Pump Type Positive Displacement
Pump Service Type Other
Pump Service Type Details Fast Loop Closed Sampling System
Installation Year 2019
Manufactured Year 2018
Material Involved Carbon Steel
Release Type Leak
Leak Type Seal Or Packing
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 450
Est Cost Prop Damage 0
Est Cost Emergency 12306
Est Cost Environmental 1800
Est Cost Other 0
Prpty 14556
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 91
Mop Psig 500
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 2019-04-01 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details There was no indication that the control room was involved in the release nor that the controller was involved. Scada nor cpm did not indicate that there was a release of any kind.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Pump Or Pump-Related Equipment
Eq Failure Type Pump Or Pump-Related Equipment
Other Pump Ind Seal/packing Failure
Ief Addl Misalignment Ind Yes
Eqf Pump Equipment Ind Yes
Preparer Name G*** C*********
Preparer Title Regulatory Compliance Specialist Ii
Preparer Email G**************@o****.com
Preparer Telephone 9183818066
Prepared Date 2024-10-18 00:00:00
Authorizer Name R*** M****
Authorizer Telephone 5807410185
Authorizer Title Regulatory Compliance Manager
Authorizer Email R*********@o****.com
Narrative At 17:30 operations discovered a leak on the east houston to hearne pipeline fast loop sample pump. East houston to hearne was pumping outbound and the fast loop sample pump was running under normal operating conditions. Once it was determined the fast loop sample pump had failed the manual suction and discharge valve to the fast loop pump were closed. Contaminated soil was removed and put in roll-off boxes and pump was replaced.

All rights reserved. Copyright © by ClearPHMSA