HL incident on 2024-10-03 — KS

Operator
Flint Hills Resources, Lc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$65,000
Incident datetime
2024-10-03 00:00 UTC
Report number
Location
KS
Narrative
Final update: the investigation has been completed, and we have updated part g, internal corrosion, q7 to include microbiological. _________________________________________________________________________________ on the afternoon of september 4, 2024, at 16:38, the pipeline control center (pcc) initiated a station shutdown at the helena terminal after receiving an alarm from the mregz sensor system. By 17:00, pcc dispatched operations personnel to the terminal, initiated internal company alert messages, and contacted the leak detection team to analyze the situation. Operations personnel arrived at the terminal at approximately 17:30. At 17:35 operations personnel verified a release of crude oil coming from tank 28616 discharge manifold. Pcc closed the tank outlet valve on tank 28616. Additionally, upon advice from the operations team, pcc also closed the suction valve 0501 at 17:47 to assist with the isolation of the area. The oil spill response organization (osro) was notified at 18:15 and arrived onsite at 22:23. Clean-up efforts began on september 4, 2024, and were completed by september 5, 2024. Pipeline repair was completed on september 6, 2024. An investigation into the incident is currently ongoing, and further details will be provided once the report is finalized.
Detailed record list
Report Received Date
2024-10-03 00:00:00
Iyear
2024
Report Number
20240234
Supplemental Number
40201
Report Type
Supplemental Final
Operator Id
Name
Flint Hills Resources, Lc
Operator Street Address
4111 East 37th Street North
Operator City Name
Wichita
Operator State Abbreviation
KS
Operator Postal Code
67220
Time Zone
Central
Daylight Savings Ind
No
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
37
Recovered Bbls
13
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Other
Accident Details
Mregz Sensor
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
No
Nrc Rpt Num
Additional Nrc Report Numbers
1410109
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
Yes
Osro Arrived On Site Dt
9/4/2024 22:23
Num Pub Evacuated
0
Pipe Fac Name
Helena Terminal
Segment Name
Helena Terminal
Onshore State Abbreviation
Tx
Onshore Postal Code
78118
Onshore City Name
Karnes City
Onshore County Name
Karnes
Designated Location
Survey Station No.
Designated Name
0+00
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
20
Pipe Wall Thickness
0.5
Pipe Smys
52000
Pipe Specification
Api 5l
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Hyundai Hysco
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Coating Applied Ind
Yes
Installation Year
2013
Manufactured Year
2012
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
Internal Corrosion
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
2556
Est Cost Prop Damage
65000
Est Cost Emergency
65390
Est Cost Environmental
0
Est Cost Other
0
Prpty
132946
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
14
Mop Psig
1480
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2013-03-02 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Corrosive Commodity Ind
Yes
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Dead Leg Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
M***** P****
Preparer Title
Compliance Managment Systems Specialist
Preparer Email
M***********@f**.com
Preparer Telephone
361-242-8781
Prepared Date
2024-11-07 00:00:00
Authorizer Name
M**** T*****
Authorizer Telephone
409-273-9482
Authorizer Title
Senior Compliance Specialist
Authorizer Email
M***********@f**.com
Narrative
Final update: the investigation has been completed, and we have updated part g, internal corrosion, q7 to include microbiological. _________________________________________________________________________________ on the afternoon of september 4, 2024, at 16:38, the pipeline control center (pcc) initiated a station shutdown at the helena terminal after receiving an alarm from the mregz sensor system. By 17:00, pcc dispatched operations personnel to the terminal, initiated internal company alert messages, and contacted the leak detection team to analyze the situation. Operations personnel arrived at the terminal at approximately 17:30. At 17:35 operations personnel verified a release of crude oil coming from tank 28616 discharge manifold. Pcc closed the tank outlet valve on tank 28616. Additionally, upon advice from the operations team, pcc also closed the suction valve 0501 at 17:47 to assist with the isolation of the area. The oil spill response organization (osro) was notified at 18:15 and arrived onsite at 22:23. Clean-up efforts began on september 4, 2024, and were completed by september 5, 2024. Pipeline repair was completed on september 6, 2024. An investigation into the incident is currently ongoing, and further details will be provided once the report is finalized.
Report Received Date 2024-10-03 00:00:00
Iyear 2024
Report Number 20240234
Supplemental Number 40201
Report Type Supplemental Final
Operator Id 22855 PHMSA Enforcement
Name Flint Hills Resources, Lc
Operator Street Address 4111 East 37th Street North
Operator City Name Wichita
Operator State Abbreviation KS
Operator Postal Code 67220
Time Zone Central
Daylight Savings Ind No
Location Latitude 28.937256 Google Maps OpenStreetMap
Location Longitude -97.798827 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 37
Recovered Bbls 13
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Other
Accident Details Mregz Sensor
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Communication State Fed Ind No
Nrc Rpt Num 1409935 NRC Report How to search
Additional Nrc Report Numbers 1410109
Ignite Ind No
Notify Qualified Indiv Ind Yes
Oil Spill Removal Org Ind Yes
Osro Arrived On Site Dt 9/4/2024 22:23
Num Pub Evacuated 0
Pipe Fac Name Helena Terminal
Segment Name Helena Terminal
Onshore State Abbreviation Tx
Onshore Postal Code 78118
Onshore City Name Karnes City
Onshore County Name Karnes
Designated Location Survey Station No.
Designated Name 0+00
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Body
Puddle Weld Ind No
Pipe Diameter 20
Pipe Wall Thickness 0.5
Pipe Smys 52000
Pipe Specification Api 5l
Pipe Seam Type Erw - High Frequency
Pipe Manufacturer Hyundai Hysco
Pipe Coating Type Fusion Bonded Epoxy(Fbe)
Coating Applied Ind Yes
Installation Year 2013
Manufactured Year 2012
Material Involved Carbon Steel
Release Type Leak
Leak Type Other
Leak Type Other Internal Corrosion
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 2556
Est Cost Prop Damage 65000
Est Cost Emergency 65390
Est Cost Environmental 0
Est Cost Other 0
Prpty 132946
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 14
Mop Psig 1480
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 2013-03-02 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind Yes
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results Localized Pitting
Int Corrosive Commodity Ind Yes
Int Microbiological Ind Yes
Int Field Exam Basis Ind Yes
Int Dead Leg Loc Ind Yes
Corrosion Inhibitors Yes
Corrosion Lining No
Cleaning Dewatering Not Applicable - Not Mainline Pipe
Corrosion Coupons Not Applicable - Not Mainline Pipe
Collected Data Ind No
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name M***** P****
Preparer Title Compliance Managment Systems Specialist
Preparer Email M***********@f**.com
Preparer Telephone 361-242-8781
Prepared Date 2024-11-07 00:00:00
Authorizer Name M**** T*****
Authorizer Telephone 409-273-9482
Authorizer Title Senior Compliance Specialist
Authorizer Email M***********@f**.com
Narrative Final update: the investigation has been completed, and we have updated part g, internal corrosion, q7 to include microbiological. _________________________________________________________________________________ on the afternoon of september 4, 2024, at 16:38, the pipeline control center (pcc) initiated a station shutdown at the helena terminal after receiving an alarm from the mregz sensor system. By 17:00, pcc dispatched operations personnel to the terminal, initiated internal company alert messages, and contacted the leak detection team to analyze the situation. Operations personnel arrived at the terminal at approximately 17:30. At 17:35 operations personnel verified a release of crude oil coming from tank 28616 discharge manifold. Pcc closed the tank outlet valve on tank 28616. Additionally, upon advice from the operations team, pcc also closed the suction valve 0501 at 17:47 to assist with the isolation of the area. The oil spill response organization (osro) was notified at 18:15 and arrived onsite at 22:23. Clean-up efforts began on september 4, 2024, and were completed by september 5, 2024. Pipeline repair was completed on september 6, 2024. An investigation into the incident is currently ongoing, and further details will be provided once the report is finalized.

All rights reserved. Copyright © by ClearPHMSA