Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2024-09-18 — TX
Operator
Energy Transfer Company
Cause
Other Accident Cause
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$225,580
Incident datetime
2024-09-18 00:00 UTC
Report number
Location
TX
Narrative
On 8/20/2024 at 08:57, operations received a notification concerning visible product leaking from a sidewalk on 13002 cmar-ctol-16inch line. Line was immediately shutdown and isolated. Approximately 5 barrels of crude oil was released. An osro was mobilized to cleanup free product and contaminated soil. The failed pipe was cutout and replaced. The line was restarted on 8/24/2024 at 09:45. The cause of the leak is still under investigation. A supplemental report will be submitted once the investigation is complete.
Detailed record list
Report Received Date
2024-09-18 00:00:00
Iyear
2024
Report Number
20240219
Supplemental Number
40008
Report Type
Original
Operator Id
32099
Name
Energy Transfer Company
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Eastern
Daylight Savings Ind
Yes
Location Latitude
42.384495
Location Longitude
-83.353622
Commodity Released Type
Crude Oil
Unintentional Release Bbls
5
Recovered Bbls
5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
No
Nrc Rpt Num
1408478
Additional Nrc Report Numbers
1408663
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Type Ind
Manual
Downstream Action Taken
Valve Closure
Downstream Valve Type Ind
Manual
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
Yes
Osro Arrived On Site Dt
8/20/2024 12:10
Num Pub Evacuated
0
Pipe Fac Name
Marysville To Toledo
Segment Name
13002 Cmar-Ctol-16inch
Onshore State Abbreviation
Mi
Onshore Postal Code
48154
Onshore City Name
Livonia
Onshore County Name
Wayne
Designated Location
Survey Station No.
Designated Name
344498.8
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
42
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
16
Pipe Wall Thickness
0.25
Pipe Smys
60000
Pipe Specification
X-60
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Republic Steel
Pipe Coating Type
Coal Tar
Coating Applied Ind
Yes
Installation Year
1967
Manufactured Year
1967
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Still Under Investigation
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
18000
Est Cost Gas Released
360
Est Cost Prop Damage
225580
Est Cost Emergency
155995
Est Cost Environmental
275000
Est Cost Other
0
Prpty
674935
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
1205
Mop Psig
1300
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
1987-04-21 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
55986
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Accident Cause
Cause Details
Unknown
Other Type
Unknown
Unknown Subtype
Still Under Investigation, Cause Of Accident To Be Determined* (*supplemental Report Required)
Preparer Name
T*** N*******
Preparer Title
Director - Dot Compliance
Preparer Email
T************@e*************.com
Preparer Telephone
713-989-7126
Prepared Date
2024-09-18 00:00:00
Authorizer Name
T*** N*******
Authorizer Telephone
713-989-7126
Authorizer Title
Director - Dot Compliance
Authorizer Email
T************@e*************.com
Narrative
On 8/20/2024 at 08:57, operations received a notification concerning visible product leaking from a sidewalk on 13002 cmar-ctol-16inch line. Line was immediately shutdown and isolated. Approximately 5 barrels of crude oil was released. An osro was mobilized to cleanup free product and contaminated soil. The failed pipe was cutout and replaced. The line was restarted on 8/24/2024 at 09:45. The cause of the leak is still under investigation. A supplemental report will be submitted once the investigation is complete.
Report Received Date | 2024-09-18 00:00:00 |
---|---|
Iyear | 2024 |
Report Number | 20240219 |
Supplemental Number | 40008 |
Report Type | Original |
Operator Id | 32099 PHMSA Enforcement |
Name | Energy Transfer Company |
Operator Street Address | 1300 Main Street |
Operator City Name | Houston |
Operator State Abbreviation | TX |
Operator Postal Code | 77002 |
Time Zone | Eastern |
Daylight Savings Ind | Yes |
Location Latitude | 42.384495 Google Maps OpenStreetMap |
Location Longitude | -83.353622 Google Maps OpenStreetMap |
Commodity Released Type | Crude Oil |
Unintentional Release Bbls | 5 |
Recovered Bbls | 5 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Notification From Public |
System Part Involved | Onshore Pipeline, Including Valve Sites |
On Off Shore | Onshore |
Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
Shutdown Due Accident Ind | Yes |
Communication State Fed Ind | No |
Nrc Rpt Num | 1408478 NRC Report How to search |
Additional Nrc Report Numbers | 1408663 |
Ignite Ind | No |
Upstream Action Taken | Valve Closure |
Upstream Valve Type Ind | Manual |
Downstream Action Taken | Valve Closure |
Downstream Valve Type Ind | Manual |
Notify Qualified Indiv Ind | Yes |
Oil Spill Removal Org Ind | Yes |
Osro Arrived On Site Dt | 8/20/2024 12:10 |
Num Pub Evacuated | 0 |
Pipe Fac Name | Marysville To Toledo |
Segment Name | 13002 Cmar-Ctol-16inch |
Onshore State Abbreviation | Mi |
Onshore Postal Code | 48154 |
Onshore City Name | Livonia |
Onshore County Name | Wayne |
Designated Location | Survey Station No. |
Designated Name | 344498.8 |
Federal | No |
Location Type | Pipeline Right-Of-Way |
Incident Area Type | Underground |
Incident Area Subtype | Under Soil |
Depth Of Cover | 42 |
Crossing | No |
Pipe Facility Type | Interstate |
Item Involved | Pipe |
Pipe Type | Pipe Body |
Puddle Weld Ind | No |
Pipe Diameter | 16 |
Pipe Wall Thickness | 0.25 |
Pipe Smys | 60000 |
Pipe Specification | X-60 |
Pipe Seam Type | Erw - High Frequency |
Pipe Manufacturer | Republic Steel |
Pipe Coating Type | Coal Tar |
Coating Applied Ind | Yes |
Installation Year | 1967 |
Manufactured Year | 1967 |
Material Involved | Carbon Steel |
Release Type | Other |
Release Type Details | Still Under Investigation |
Wildlife Impact Ind | No |
Soil Contamination | Yes |
Long Term Assessment | No |
Remediation Ind | Yes |
Soil Remed Ind | Yes |
Water Contam Ind | No |
Could Be Hca | Yes |
Commodity Reached Hca | Yes |
High Pop Ind | Yes |
High Pop Yes No | Yes |
Est Cost Oper Paid | 18000 |
Est Cost Gas Released | 360 |
Est Cost Prop Damage | 225580 |
Est Cost Emergency | 155995 |
Est Cost Environmental | 275000 |
Est Cost Other | 0 |
Prpty | 674935 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 1205 |
Mop Psig | 1300 |
Mop Cfr Section | Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192 |
Maop Established Date | 1987-04-21 00:00:00 |
Maop Reversal Flow Ind | No |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Length Segment Isolated | 55986 |
Internal Inspection Ind | Yes |
Operation Complications Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Cpm In Place Ind | Yes |
Cpm Operating Ind | Yes |
Cpm Functional Ind | Yes |
Cpm Detection Ind | No |
Cpm Conf Ind | No |
Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
Investigation Status Details | A review of the accident determined that there were no control room actions that contributed to the event. |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Other Accident Cause |
Cause Details | Unknown |
Other Type | Unknown |
Unknown Subtype | Still Under Investigation, Cause Of Accident To Be Determined* (*supplemental Report Required) |
Preparer Name | T*** N******* |
Preparer Title | Director - Dot Compliance |
Preparer Email | T************@e*************.com |
Preparer Telephone | 713-989-7126 |
Prepared Date | 2024-09-18 00:00:00 |
Authorizer Name | T*** N******* |
Authorizer Telephone | 713-989-7126 |
Authorizer Title | Director - Dot Compliance |
Authorizer Email | T************@e*************.com |
Narrative | On 8/20/2024 at 08:57, operations received a notification concerning visible product leaking from a sidewalk on 13002 cmar-ctol-16inch line. Line was immediately shutdown and isolated. Approximately 5 barrels of crude oil was released. An osro was mobilized to cleanup free product and contaminated soil. The failed pipe was cutout and replaced. The line was restarted on 8/24/2024 at 09:45. The cause of the leak is still under investigation. A supplemental report will be submitted once the investigation is complete. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA