HL incident on 2024-09-03 — TX

Operator
Mid - Valley Pipeline Co
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$11,029
Incident datetime
2024-09-03 00:00 UTC
Report number
Location
TX
Narrative
On 08/08/24 at approximately 07:15, during the morning walkthrough, a local operator employee discovered a leak on the 16-inch strainer bypass piping at mayersville pump station. The control center was immediately notified and the station was isolated although at the time of discovery the pipeline was down on normal schedule. The leak area was further isolated and an investigation determined the leak was coming from a pinhole leak at the 6 oclock position on the strainer bypass piping. The leak point was repaired using a 16-inch mechanical clamp. Approximately 15 gallons (0.4 bbls.) of crude oil was released. Cleanup contractors removed product and remediated impacted soil. The failed section has been cut out and replaced and sent to a laboratory for examination. Supplemental & final: the lab analysis determined the cause of the accident was due to internal corrosion. To prevent reoccurrence, continuous treatments upstream of this station have been implemented and the volume of product to flush the line was increased.
Detailed record list
Report Received Date
2024-09-03 00:00:00
Iyear
2024
Report Number
20240210
Supplemental Number
40616
Report Type
Supplemental Final
Operator Id
Name
Mid - Valley Pipeline Co
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.4
Recovered Bbls
0.4
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Line Was Already Shutdown
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Mayersville Station
Segment Name
16-Inch Strainer Bypass Line
Onshore State Abbreviation
Ms
Onshore Postal Code
39111
Onshore City Name
Mayersville
Onshore County Name
Issaquena
Designated Location
Milepost
Designated Name
227
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
16
Pipe Wall Thickness
0.375
Pipe Smys
42000
Pipe Specification
X52
Pipe Seam Type
Seamless
Pipe Manufacturer
Unknown
Pipe Coating Type
Cold Applied Tape
Coating Applied Ind
Yes
Installation Year
1950
Manufactured Year
1948
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
11029
Est Cost Emergency
5329
Est Cost Environmental
1800
Est Cost Other
0
Prpty
18158
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
200
Mop Psig
250
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2021-09-20 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Water Acid Ind
Yes
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Metallurgical Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Int Dead Leg Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
T*** N*******
Preparer Title
Director - Dot Compliance
Preparer Email
T************@e*************.com
Preparer Telephone
713-989-7126
Prepared Date
2025-03-12 00:00:00
Authorizer Name
T*** N*******
Authorizer Telephone
713-989-7126
Authorizer Title
Director - Dot Compliance
Authorizer Email
T************@e*************.com
Narrative
On 08/08/24 at approximately 07:15, during the morning walkthrough, a local operator employee discovered a leak on the 16-inch strainer bypass piping at mayersville pump station. The control center was immediately notified and the station was isolated although at the time of discovery the pipeline was down on normal schedule. The leak area was further isolated and an investigation determined the leak was coming from a pinhole leak at the 6 oclock position on the strainer bypass piping. The leak point was repaired using a 16-inch mechanical clamp. Approximately 15 gallons (0.4 bbls.) of crude oil was released. Cleanup contractors removed product and remediated impacted soil. The failed section has been cut out and replaced and sent to a laboratory for examination. Supplemental & final: the lab analysis determined the cause of the accident was due to internal corrosion. To prevent reoccurrence, continuous treatments upstream of this station have been implemented and the volume of product to flush the line was increased.
Report Received Date 2024-09-03 00:00:00
Iyear 2024
Report Number 20240210
Supplemental Number 40616
Report Type Supplemental Final
Operator Id 12470 PHMSA Enforcement
Name Mid - Valley Pipeline Co
Operator Street Address 1300 Main Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 32.876169 Google Maps OpenStreetMap
Location Longitude -91.052988 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 0.4
Recovered Bbls 0.4
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind No
Shutdown Explain Line Was Already Shutdown
Communication State Fed Ind Yes
Party Initiated Communication Operator
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Notify Qualified Indiv Ind Yes
Oil Spill Removal Org Ind No
Num Pub Evacuated 0
Pipe Fac Name Mayersville Station
Segment Name 16-Inch Strainer Bypass Line
Onshore State Abbreviation Ms
Onshore Postal Code 39111
Onshore City Name Mayersville
Onshore County Name Issaquena
Designated Location Milepost
Designated Name 227
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Puddle Weld Ind No
Pipe Diameter 16
Pipe Wall Thickness 0.375
Pipe Smys 42000
Pipe Specification X52
Pipe Seam Type Seamless
Pipe Manufacturer Unknown
Pipe Coating Type Cold Applied Tape
Coating Applied Ind Yes
Installation Year 1950
Manufactured Year 1948
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 0
Est Cost Prop Damage 11029
Est Cost Emergency 5329
Est Cost Environmental 1800
Est Cost Other 0
Prpty 18158
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 200
Mop Psig 250
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 2021-09-20 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results Localized Pitting
Int Water Acid Ind Yes
Int Microbiological Ind Yes
Int Field Exam Basis Ind Yes
Int Metallurgical Basis Ind Yes
Int Low Point Pipe Loc Ind Yes
Int Dead Leg Loc Ind Yes
Corrosion Inhibitors Yes
Corrosion Lining No
Cleaning Dewatering Not Applicable - Not Mainline Pipe
Corrosion Coupons Not Applicable - Not Mainline Pipe
Collected Data Ind No
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name T*** N*******
Preparer Title Director - Dot Compliance
Preparer Email T************@e*************.com
Preparer Telephone 713-989-7126
Prepared Date 2025-03-12 00:00:00
Authorizer Name T*** N*******
Authorizer Telephone 713-989-7126
Authorizer Title Director - Dot Compliance
Authorizer Email T************@e*************.com
Narrative On 08/08/24 at approximately 07:15, during the morning walkthrough, a local operator employee discovered a leak on the 16-inch strainer bypass piping at mayersville pump station. The control center was immediately notified and the station was isolated although at the time of discovery the pipeline was down on normal schedule. The leak area was further isolated and an investigation determined the leak was coming from a pinhole leak at the 6 oclock position on the strainer bypass piping. The leak point was repaired using a 16-inch mechanical clamp. Approximately 15 gallons (0.4 bbls.) of crude oil was released. Cleanup contractors removed product and remediated impacted soil. The failed section has been cut out and replaced and sent to a laboratory for examination. Supplemental & final: the lab analysis determined the cause of the accident was due to internal corrosion. To prevent reoccurrence, continuous treatments upstream of this station have been implemented and the volume of product to flush the line was increased.