HL incident on 2024-08-26 — LA

Operator
Crescent Midstream, Llc
Cause
Incorrect Operation
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$20,000
Incident datetime
2024-08-26 00:00 UTC
Report number
Location
LA
Narrative
Tank 2051 at the raceland facility was taken out of service for integrity inspections and for maintenance. Two frac tanks (identified as tank/vessel in part c) were put inside the secondary containment area with tank 2051 to facilitate the cleaning of tank 2051. After cleaning was concluded, the frac tanks were left in place. Hoses and a flex valve were connected between the permanent piping and the frac tanks to allow for pressure control, keeping the pipeline pressure from reaching the maximum operating pressure (mop) of the associated permanent piping and pipelines. The flex valve was installed to relieve pressure from the pipelines and the temporary hoses to the frac tanks. The pressure range that caused the flex valve to operate was between 150 and 160 psig. On the evening of july 26, crude oil from empire and grand isle was to be transferred through the raceland facility down the south line to anchorage. Pump 1b was used for this transfer. Pump 1b repeatedly shutdown. Several times during the restarts of the pump, the flex valve operated and put oil into the frac tanks. Eventually, the frac tanks overfilled and put oil on the ground within the secondary containment area. The secondary containment area was designed to be drained through six valves. One of these valves was open during this time period, allowing for the oil in the containment area to exit to bayou lafourche. Crescent has not be notified by the epa of long term environmental impact assessment requirements.
Detailed record list
Report Received Date
2024-08-26 00:00:00
Iyear
2024
Report Number
20240200
Supplemental Number
40172
Report Type
Supplemental Final
Operator Id
Name
Crescent Midstream, Llc
Operator Street Address
263 Trinity Lane
Operator City Name
Gray
Operator State Abbreviation
LA
Operator Postal Code
70359
Time Zone
Central
Daylight Savings Ind
No
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
820
Recovered Bbls
590
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances
On Off Shore
Onshore
Status When Identified
Routine Start-Up
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Nrc Rpt Num
Additional Nrc Report Numbers
1406243, 1406258
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
Yes
Osro Arrived On Site Dt
10/27/2024 9:00
Num Pub Evacuated
0
Pipe Fac Name
Raceland Station
Segment Name
La-26
Onshore State Abbreviation
La
Onshore Postal Code
70394
Onshore City Name
Raceland
Onshore County Name
Lafourche
Designated Location
Survey Station No.
Designated Name
Raceland
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Tank, Including Attached Appurtenances
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Tank/vessel
Tank Vessel Subtype
Vent
Tank Type
Atmospheric
Safe Fill Level
3
Safe Fill Level Exceeded Ind
Yes
Api Std Out Of Srvc None Ind
Yes
Api Std No In Service Ind
Yes
Installation Year
2024
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Overfill Or Overflow
Wildlife Impact Ind
Yes
Fish Aquatic Impact Ind
Yes
Birds Impact Ind
Yes
Terrestrial Impact Ind
Yes
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Surface Water Remed Ind
Yes
Soil Remed Ind
Yes
Vegetation Remed Ind
Yes
Wildlife Remed Ind
Yes
Water Contam Ind
Yes
Surface Contam Ind
Yes
Groundwater Contam Ind
Yes
Amount Released
300
Rel Water Name
Bayou Lafourche
Could Be Hca
Yes
Commodity Reached Hca
Yes
Commercially Nav Ind
Yes
Commercially Nav Yes No
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
20000
Est Cost Gas Released
63271
Est Cost Prop Damage
20000
Est Cost Emergency
7650000
Est Cost Environmental
0
Est Cost Other
600000
Est Cost Other Details
Response To Cpf No. 4-2024-016-Cao.
Prpty
8353271
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
160
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Other Ind
Yes
Invest Other Ind Details
There Was No Management Of Change For The Temporary Operation. The Moc Procedure Includes A Communication Requirement To Review The Moc With All The Impacted Departments And This Includes The Contract Operations Control Center, Everline. Persons At Everline Stated They Did Not Receive Documentation Of The Use Of Frac Tanks Or The Need To Maintain A Lower Operating Pressure Due To The Lower Pressure Limits Of The Temporary Arrangement.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Incorrect Operation
Cause Details
Tank, Vessel, Or Sump/separator Allowed Or Caused To Overfill Or Overflow
Operation Type
Tank, Vessel, Or Sump/separator Allowed Or Caused To Overfill Or Overflow
Overflow Other Ind
Inadequate Monitoring
Related No Proc Ind
Yes
Category Type
Non-Routine Operating Conditions (Abnormal Operations Or Emergencies)
Operator Qualification Ind
Yes
Qualified Individuals
Yes, They Were Qualified For The Task(S)
Io Tank Vessel Ind
Yes
Preparer Name
D***** P****
Preparer Title
Safety And Regulatory Supervisor
Preparer Email
D*****@c**********.com
Preparer Telephone
9858563965
Prepared Date
2024-10-29 00:00:00
Authorizer Name
J******* A*******
Authorizer Telephone
985-872-3100
Authorizer Title
Chief Executive Officer
Authorizer Email
J********@c**********.com
Narrative
Tank 2051 at the raceland facility was taken out of service for integrity inspections and for maintenance. Two frac tanks (identified as tank/vessel in part c) were put inside the secondary containment area with tank 2051 to facilitate the cleaning of tank 2051. After cleaning was concluded, the frac tanks were left in place. Hoses and a flex valve were connected between the permanent piping and the frac tanks to allow for pressure control, keeping the pipeline pressure from reaching the maximum operating pressure (mop) of the associated permanent piping and pipelines. The flex valve was installed to relieve pressure from the pipelines and the temporary hoses to the frac tanks. The pressure range that caused the flex valve to operate was between 150 and 160 psig. On the evening of july 26, crude oil from empire and grand isle was to be transferred through the raceland facility down the south line to anchorage. Pump 1b was used for this transfer. Pump 1b repeatedly shutdown. Several times during the restarts of the pump, the flex valve operated and put oil into the frac tanks. Eventually, the frac tanks overfilled and put oil on the ground within the secondary containment area. The secondary containment area was designed to be drained through six valves. One of these valves was open during this time period, allowing for the oil in the containment area to exit to bayou lafourche. Crescent has not be notified by the epa of long term environmental impact assessment requirements.
Report Received Date 2024-08-26 00:00:00
Iyear 2024
Report Number 20240200
Supplemental Number 40172
Report Type Supplemental Final
Operator Id 39084 PHMSA Enforcement
Name Crescent Midstream, Llc
Operator Street Address 263 Trinity Lane
Operator City Name Gray
Operator State Abbreviation LA
Operator Postal Code 70359
Time Zone Central
Daylight Savings Ind No
Location Latitude 29.727216 Google Maps OpenStreetMap
Location Longitude -90.592866 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 820
Recovered Bbls 590
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
System Part Involved Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances
On Off Shore Onshore
Status When Identified Routine Start-Up
Shutdown Due Accident Ind Yes
Communication State Fed Ind Yes
Party Initiated Communication Operator
Nrc Rpt Num 1406083 NRC Report How to search
Additional Nrc Report Numbers 1406243, 1406258
Ignite Ind No
Notify Qualified Indiv Ind Yes
Oil Spill Removal Org Ind Yes
Osro Arrived On Site Dt 10/27/2024 9:00
Num Pub Evacuated 0
Pipe Fac Name Raceland Station
Segment Name La-26
Onshore State Abbreviation La
Onshore Postal Code 70394
Onshore City Name Raceland
Onshore County Name Lafourche
Designated Location Survey Station No.
Designated Name Raceland
Federal No
Location Type Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type Tank, Including Attached Appurtenances
Crossing No
Pipe Facility Type Interstate
Item Involved Tank/vessel
Tank Vessel Subtype Vent
Tank Type Atmospheric
Safe Fill Level 3
Safe Fill Level Exceeded Ind Yes
Api Std Out Of Srvc None Ind Yes
Api Std No In Service Ind Yes
Installation Year 2024
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Overfill Or Overflow
Wildlife Impact Ind Yes
Fish Aquatic Impact Ind Yes
Birds Impact Ind Yes
Terrestrial Impact Ind Yes
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Surface Water Remed Ind Yes
Soil Remed Ind Yes
Vegetation Remed Ind Yes
Wildlife Remed Ind Yes
Water Contam Ind Yes
Surface Contam Ind Yes
Groundwater Contam Ind Yes
Amount Released 300
Rel Water Name Bayou Lafourche
Could Be Hca Yes
Commodity Reached Hca Yes
Commercially Nav Ind Yes
Commercially Nav Yes No Yes
Usa Drinking Ind Yes
Usa Drinking Yes No Yes
Est Cost Oper Paid 20000
Est Cost Gas Released 63271
Est Cost Prop Damage 20000
Est Cost Emergency 7650000
Est Cost Environmental 0
Est Cost Other 600000
Est Cost Other Details Response To Cpf No. 4-2024-016-Cao.
Prpty 8353271
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 160
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest Other Ind Yes
Invest Other Ind Details There Was No Management Of Change For The Temporary Operation. The Moc Procedure Includes A Communication Requirement To Review The Moc With All The Impacted Departments And This Includes The Contract Operations Control Center, Everline. Persons At Everline Stated They Did Not Receive Documentation Of The Use Of Frac Tanks Or The Need To Maintain A Lower Operating Pressure Due To The Lower Pressure Limits Of The Temporary Arrangement.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Incorrect Operation
Cause Details Tank, Vessel, Or Sump/separator Allowed Or Caused To Overfill Or Overflow
Operation Type Tank, Vessel, Or Sump/separator Allowed Or Caused To Overfill Or Overflow
Overflow Other Ind Inadequate Monitoring
Related No Proc Ind Yes
Category Type Non-Routine Operating Conditions (Abnormal Operations Or Emergencies)
Operator Qualification Ind Yes
Qualified Individuals Yes, They Were Qualified For The Task(S)
Io Tank Vessel Ind Yes
Preparer Name D***** P****
Preparer Title Safety And Regulatory Supervisor
Preparer Email D*****@c**********.com
Preparer Telephone 9858563965
Prepared Date 2024-10-29 00:00:00
Authorizer Name J******* A*******
Authorizer Telephone 985-872-3100
Authorizer Title Chief Executive Officer
Authorizer Email J********@c**********.com
Narrative Tank 2051 at the raceland facility was taken out of service for integrity inspections and for maintenance. Two frac tanks (identified as tank/vessel in part c) were put inside the secondary containment area with tank 2051 to facilitate the cleaning of tank 2051. After cleaning was concluded, the frac tanks were left in place. Hoses and a flex valve were connected between the permanent piping and the frac tanks to allow for pressure control, keeping the pipeline pressure from reaching the maximum operating pressure (mop) of the associated permanent piping and pipelines. The flex valve was installed to relieve pressure from the pipelines and the temporary hoses to the frac tanks. The pressure range that caused the flex valve to operate was between 150 and 160 psig. On the evening of july 26, crude oil from empire and grand isle was to be transferred through the raceland facility down the south line to anchorage. Pump 1b was used for this transfer. Pump 1b repeatedly shutdown. Several times during the restarts of the pump, the flex valve operated and put oil into the frac tanks. Eventually, the frac tanks overfilled and put oil on the ground within the secondary containment area. The secondary containment area was designed to be drained through six valves. One of these valves was open during this time period, allowing for the oil in the containment area to exit to bayou lafourche. Crescent has not be notified by the epa of long term environmental impact assessment requirements.