HL incident on 2024-08-16 — GA
Operator
Colonial Pipeline Co
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$17,500
Incident datetime
2024-08-16 00:00 UTC
Report number
Location
GA
Narrative
On 8/1/24 at 14:47 cst local operations was injecting ultra-low sulfur diesel (ulsd) on line 02. At 14:51 cst line conditions became transient, and we received a high discharge alarm on the tf#2 oil booster and few seconds later a bearing/seal failure alarm on the 1250 oil booster. This was not an over pressure event/situation due to exceeding 110% of max operating pressure (mop). An operator was dispatched to check on the 1250 booster, and at 14:54 cst, diesel was discovered flowing from the outboard side of the pump seal. The pump was isolated which stopped the release of product. Spill response personnel were mobilized and arrived on-site at approximately 15:05 cst. At 17:30 cst initial cleanup was completed, and all released ulsd was recovered. The line 02 1250 booster seal was repaired and returned to service on 8/02/24 at 13:44 cst. Final site cleanup was completed at 16:30 cst on 8/2/24. All released product was contained on cpc property. Proper internal notifications were made. The la state police (spoc) was notified at 16:00 cst, and at 16:25 cst, a determination was made response costs were likely to exceed $50,000; thus, an nrc notification was made on 08/01/24 @ 16:39 cst.
Detailed record list
Report Received Date
2024-08-16 00:00:00
Iyear
2024
Report Number
20240196
Supplemental Number
39913
Report Type
Original Final
Operator Id
2552
Name
Colonial Pipeline Co
Operator Street Address
1000 Lake St.
Operator City Name
Alpharetta
Operator State Abbreviation
GA
Operator Postal Code
30009
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
30.71091977
Location Longitude
-91.28374885
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
2.4
Recovered Bbls
2.4
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Pump And Piping Only - No Mainline Impact
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Nrc Rpt Num
1406604
Additional Nrc Report Numbers
1406777
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Baton Rouge Junction
Segment Name
Unit 8879
Onshore State Abbreviation
La
Onshore Postal Code
70748
Onshore City Name
Jackson
Onshore County Name
East Feliciana
Designated Location
Milepost
Designated Name
222
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Tank, Including Attached Appurtenances
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pump
Pump Type
Centrifugal
Pump Service Type
Injection
Installation Year
2024
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
17500
Est Cost Emergency
48000
Est Cost Environmental
0
Est Cost Other
0
Prpty
65500
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
460
Mop Psig
560
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
1970-01-30 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
No the operator did not find that an investigation of the controller(s) actions or control room issues was necessary, as the leak was due to an equipment failure.
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
2
Num Employees Failed
0
Cause
Equipment Failure
Cause Details
Pump Or Pump-Related Equipment
Eq Failure Type
Pump Or Pump-Related Equipment
Other Pump Ind
Seal/packing Failure
Ief Addl Misalignment Ind
Yes
Preparer Name
R***** D*****
Preparer Title
Sr Compliance Specialist
Preparer Email
R******@c******.com
Preparer Telephone
4097904288
Prepared Date
2024-08-16 00:00:00
Authorizer Name
Q****** F******
Authorizer Telephone
7706879672
Authorizer Title
Pipeline Compliance Director
Authorizer Email
Q*******@c******.com
Narrative
O***************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************@ *********.
Report Received Date | 2024-08-16 00:00:00 |
---|---|
Iyear | 2024 |
Report Number | 20240196 |
Supplemental Number | 39913 |
Report Type | Original Final |
Operator Id | 2552 PHMSA Enforcement |
Name | Colonial Pipeline Co |
Operator Street Address | 1000 Lake St. |
Operator City Name | Alpharetta |
Operator State Abbreviation | GA |
Operator Postal Code | 30009 |
Time Zone | Central |
Daylight Savings Ind | Yes |
Location Latitude | 30.71091977 Google Maps OpenStreetMap |
Location Longitude | -91.28374885 Google Maps OpenStreetMap |
Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
Commodity Subtype | Diesel, Fuel Oil, Kerosene, Jet Fuel |
Unintentional Release Bbls | 2.4 |
Recovered Bbls | 2.4 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Local Operating Personnel, Including Contractors |
Operator Type | Operator Employee |
System Part Involved | Onshore Pump/meter Station Equipment And Piping |
On Off Shore | Onshore |
Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
Shutdown Due Accident Ind | No |
Shutdown Explain | Pump And Piping Only - No Mainline Impact |
Communication State Fed Ind | Yes |
Party Initiated Communication | Operator |
Nrc Rpt Num | 1406604 NRC Report How to search |
Additional Nrc Report Numbers | 1406777 |
Ignite Ind | No |
Notify Qualified Indiv Ind | Yes |
Oil Spill Removal Org Ind | No |
Num Pub Evacuated | 0 |
Pipe Fac Name | Baton Rouge Junction |
Segment Name | Unit 8879 |
Onshore State Abbreviation | La |
Onshore Postal Code | 70748 |
Onshore City Name | Jackson |
Onshore County Name | East Feliciana |
Designated Location | Milepost |
Designated Name | 222 |
Federal | No |
Location Type | Totally Contained On Operator-Controlled Property |
Incident Area Type | Tank, Including Attached Appurtenances |
Crossing | No |
Pipe Facility Type | Interstate |
Item Involved | Pump |
Pump Type | Centrifugal |
Pump Service Type | Injection |
Installation Year | 2024 |
Manufactured Year | Unknown |
Material Involved | Carbon Steel |
Release Type | Leak |
Leak Type | Seal Or Packing |
Wildlife Impact Ind | No |
Soil Contamination | Yes |
Long Term Assessment | No |
Remediation Ind | No |
Water Contam Ind | No |
Could Be Hca | Yes |
Commodity Reached Hca | No |
Est Cost Oper Paid | 0 |
Est Cost Gas Released | 0 |
Est Cost Prop Damage | 17500 |
Est Cost Emergency | 48000 |
Est Cost Environmental | 0 |
Est Cost Other | 0 |
Prpty | 65500 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 460 |
Mop Psig | 560 |
Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
Maop Established Date | 1970-01-30 00:00:00 |
Maop Reversal Flow Ind | No |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | No |
Cpm In Place Ind | No |
Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
Investigation Status Details | No the operator did not find that an investigation of the controller(s) actions or control room issues was necessary, as the leak was due to an equipment failure. |
Employee Drug Test Ind | Yes |
Contractor Drug Test Ind | No |
Num Employees Tested | 2 |
Num Employees Failed | 0 |
Cause | Equipment Failure |
Cause Details | Pump Or Pump-Related Equipment |
Eq Failure Type | Pump Or Pump-Related Equipment |
Other Pump Ind | Seal/packing Failure |
Ief Addl Misalignment Ind | Yes |
Preparer Name | R***** D***** |
Preparer Title | Sr Compliance Specialist |
Preparer Email | R******@c******.com |
Preparer Telephone | 4097904288 |
Prepared Date | 2024-08-16 00:00:00 |
Authorizer Name | Q****** F****** |
Authorizer Telephone | 7706879672 |
Authorizer Title | Pipeline Compliance Director |
Authorizer Email | Q*******@c******.com |
Narrative | O***************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************@ *********. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA