HL incident on 2024-07-25 — TX
Operator
Enterprise Products Operating Llc
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$90,000
Incident datetime
2024-07-25 00:00 UTC
Report number
Location
TX
Narrative
On 6/27/2024 at 07:28 cdst, nort port arthur operations personnel reported the smell of gasoline. Upon further investigation of the facility, the facility prover was discovered to be leaking. In response, the prover was isolated and the release was contained onsite. At 09:14 cdst the same day, it was determined via conference call that repair and cleanup of the release would exceed $50k. It is estimated 15 barrels of gasoline were released and have been recovered. Cause of accident was determined to be the manufacturer design. To reduce recurrence, the prover has been removed from service. Nrc #: 1403108 on 06/27/2024 at 09:27 cdst 48 hr nrc #: 1403223 06/28/2024 at 10:46 cdst
Detailed record list
Report Received Date
2024-07-25 00:00:00
Iyear
2024
Report Number
20240173
Supplemental Number
39905
Report Type
Supplemental Final
Operator Id
31618
Name
Enterprise Products Operating Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
29.91067
Location Longitude
-94.01042
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
15
Recovered Bbls
15
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
No
Nrc Rpt Num
1403108
Additional Nrc Report Numbers
1403223
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
Yes
Osro Arrived On Site Dt
6/27/2024 8:50
Num Pub Evacuated
0
Pipe Fac Name
North Port Arthur Terminal
Segment Name
Txxx0537
Onshore State Abbreviation
Tx
Onshore Postal Code
77640
Onshore City Name
Port Arthur
Onshore County Name
Jefferson
Designated Location
Milepost
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Meter/prover
Installation Year
2009
Manufactured Year
2008
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Mechanical Failure Of Prover Piston.
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
2000
Est Cost Prop Damage
90000
Est Cost Emergency
130000
Est Cost Environmental
0
Est Cost Other
0
Prpty
222000
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
180
Mop Psig
285
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2009-02-11 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Mechanical failure was not due to controller actions.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Other Equipment Failure
Eq Failure Type
Other Equipment Failure
Failure Details
Mechanical Failure Of Prover Shaft
Eq Additional Other Ind
Yes
Eq Additional Other Details
Manufacturer Design
Preparer Name
R*** T********
Preparer Title
Senior Pipeline Compliance Engineer
Preparer Email
R*********@e****.com
Preparer Telephone
713-381-4659
Prepared Date
2024-08-15 00:00:00
Authorizer Name
R*** T********
Authorizer Telephone
713-381-4659
Authorizer Title
Senior Pipeline Compliance Engineer
Authorizer Email
R*********@e****.com
Narrative
On 6/27/2024 at 07:28 cdst, nort port arthur operations personnel reported the smell of gasoline. Upon further investigation of the facility, the facility prover was discovered to be leaking. In response, the prover was isolated and the release was contained onsite. At 09:14 cdst the same day, it was determined via conference call that repair and cleanup of the release would exceed $50k. It is estimated 15 barrels of gasoline were released and have been recovered. Cause of accident was determined to be the manufacturer design. To reduce recurrence, the prover has been removed from service. Nrc #: 1403108 on 06/27/2024 at 09:27 cdst 48 hr nrc #: 1403223 06/28/2024 at 10:46 cdst
Report Received Date | 2024-07-25 00:00:00 |
---|---|
Iyear | 2024 |
Report Number | 20240173 |
Supplemental Number | 39905 |
Report Type | Supplemental Final |
Operator Id | 31618 PHMSA Enforcement |
Name | Enterprise Products Operating Llc |
Operator Street Address | 1100 Louisiana Street |
Operator City Name | Houston |
Operator State Abbreviation | TX |
Operator Postal Code | 77002 |
Time Zone | Central |
Daylight Savings Ind | Yes |
Location Latitude | 29.91067 Google Maps OpenStreetMap |
Location Longitude | -94.01042 Google Maps OpenStreetMap |
Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
Commodity Subtype | Gasoline (Non-Ethanol) |
Unintentional Release Bbls | 15 |
Recovered Bbls | 15 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Local Operating Personnel, Including Contractors |
Operator Type | Operator Employee |
System Part Involved | Onshore Pump/meter Station Equipment And Piping |
On Off Shore | Onshore |
Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
Shutdown Due Accident Ind | Yes |
Communication State Fed Ind | No |
Nrc Rpt Num | 1403108 NRC Report How to search |
Additional Nrc Report Numbers | 1403223 |
Ignite Ind | No |
Notify Qualified Indiv Ind | Yes |
Oil Spill Removal Org Ind | Yes |
Osro Arrived On Site Dt | 6/27/2024 8:50 |
Num Pub Evacuated | 0 |
Pipe Fac Name | North Port Arthur Terminal |
Segment Name | Txxx0537 |
Onshore State Abbreviation | Tx |
Onshore Postal Code | 77640 |
Onshore City Name | Port Arthur |
Onshore County Name | Jefferson |
Designated Location | Milepost |
Designated Name | 0 |
Federal | No |
Location Type | Totally Contained On Operator-Controlled Property |
Incident Area Type | Aboveground |
Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
Crossing | No |
Pipe Facility Type | Intrastate |
Item Involved | Meter/prover |
Installation Year | 2009 |
Manufactured Year | 2008 |
Material Involved | Carbon Steel |
Release Type | Other |
Release Type Details | Mechanical Failure Of Prover Piston. |
Wildlife Impact Ind | No |
Soil Contamination | Yes |
Long Term Assessment | No |
Remediation Ind | Yes |
Soil Remed Ind | Yes |
Water Contam Ind | No |
Could Be Hca | Yes |
Commodity Reached Hca | Yes |
Other Pop Ind | Yes |
Other Pop Yes No | Yes |
Usa Drinking Ind | Yes |
Usa Drinking Yes No | Yes |
Est Cost Oper Paid | 0 |
Est Cost Gas Released | 2000 |
Est Cost Prop Damage | 90000 |
Est Cost Emergency | 130000 |
Est Cost Environmental | 0 |
Est Cost Other | 0 |
Prpty | 222000 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 180 |
Mop Psig | 285 |
Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
Maop Established Date | 2009-02-11 00:00:00 |
Maop Reversal Flow Ind | No |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Cpm In Place Ind | Yes |
Cpm Operating Ind | Yes |
Cpm Functional Ind | Yes |
Cpm Detection Ind | No |
Cpm Conf Ind | No |
Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
Investigation Status Details | Mechanical failure was not due to controller actions. |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Equipment Failure |
Cause Details | Other Equipment Failure |
Eq Failure Type | Other Equipment Failure |
Failure Details | Mechanical Failure Of Prover Shaft |
Eq Additional Other Ind | Yes |
Eq Additional Other Details | Manufacturer Design |
Preparer Name | R*** T******** |
Preparer Title | Senior Pipeline Compliance Engineer |
Preparer Email | R*********@e****.com |
Preparer Telephone | 713-381-4659 |
Prepared Date | 2024-08-15 00:00:00 |
Authorizer Name | R*** T******** |
Authorizer Telephone | 713-381-4659 |
Authorizer Title | Senior Pipeline Compliance Engineer |
Authorizer Email | R*********@e****.com |
Narrative | On 6/27/2024 at 07:28 cdst, nort port arthur operations personnel reported the smell of gasoline. Upon further investigation of the facility, the facility prover was discovered to be leaking. In response, the prover was isolated and the release was contained onsite. At 09:14 cdst the same day, it was determined via conference call that repair and cleanup of the release would exceed $50k. It is estimated 15 barrels of gasoline were released and have been recovered. Cause of accident was determined to be the manufacturer design. To reduce recurrence, the prover has been removed from service. Nrc #: 1403108 on 06/27/2024 at 09:27 cdst 48 hr nrc #: 1403223 06/28/2024 at 10:46 cdst |