Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2024-07-12 — TX
Operator
Boardwalk Petrochemical Pipeline, Llc
Cause
Material Failure Of Pipe Or Weld
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$85,000
Incident datetime
2024-07-12 00:00 UTC
Report number
Location
TX
Narrative
On june 7, 2024, a contractor working for colonial pipeline notified boardwalk petrochemical pipeline (bpp) of a potential leak on its evangeline pipeline referred to as bpp-100. The potential leak was located on the south bank of the intracoastal waterway. Bpp performed a lab analysis to confirm the leak was ethylene. The site was excavated and a leak was discovered under an existing plidco clamp. The site was returned to its previous condition and the leak will be monitored bi-monthly until repairs are completed. The product leak rate is .7 lb/day. Bpp has developed an action plan and discussed it with PHMSA. The plan includes removing the leaking clamp and one (1) other clamp by june 14, 2025.
Detailed record list
Report Received Date
2024-07-12 00:00:00
Iyear
2024
Report Number
20240163
Supplemental Number
39769
Report Type
Original
Operator Id
31554
Name
Boardwalk Petrochemical Pipeline, Llc
Operator Street Address
9 Greenway Plaza
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77046
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
30.044059
Location Longitude
-93.727749
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Ethylene
Unintentional Release Bbls
0.21
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Other
Accident Details
Notification From Contractor Working In The Area For Another Operator.
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Site Was Returned To Its Previous Condition While Repair Plan Is Developed
Communication State Fed Ind
No
Nrc Rpt Num
1401900
Additional Nrc Report Numbers
1402039
Ignite Ind
No
Upstream Action Taken
Operational Control
Upstream Oprtnl Cntrl Detail
No Action Taken To Control Flow Upstream. Repair Plan Has Been Discussed With Phmsa Central Region
Downstream Action Taken
Operational Control
Downstream Oprtnl Cntrl Detail
No Action Taken To Control Flow Downstream. Repair Plan Has Been Discussed With Phmsa Central Region
Num Pub Evacuated
0
Pipe Fac Name
Evangeline Pipeline
Segment Name
Bpp-100
Onshore State Abbreviation
La
Onshore Postal Code
70631
Onshore City Name
Not Within A Municipality
Onshore County Name
Cameron
Designated Location
Survey Station No.
Designated Name
847+96
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
20
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
16
Pipe Wall Thickness
0.312
Pipe Smys
52000
Pipe Specification
Api 5l
Pipe Seam Type
Other
Pipe Seam Details
Erw-Dc
Pipe Manufacturer
Youngstown
Pipe Coating Type
Coal Tar
Coating Applied Ind
Unknown
Installation Year
1954
Manufactured Year
1954
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Commercially Nav Ind
Yes
Commercially Nav Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
6
Est Cost Prop Damage
85000
Est Cost Emergency
67038
Est Cost Environmental
0
Est Cost Other
0
Prpty
152044
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
1170
Mop Psig
1336
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
2016-03-09 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
No controllers were involved at point the leak was determined to constitute an accident.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Field Exam Ind
Yes
Failure Type
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Other Factor
Yes
Other Factor Details
Unknown At This Time
Pwf Additional Other Ind
Yes
Collected Data Ind
Yes
Cir Trn Wave Mgn Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Circ Wave Recent Year
2024
Circ Wv Rcnt Propul Method
Free Swimming
Circ Wv Rcnt Resolution
High Resolution
Circ Wv Previous Year
2019
Circ Wv Prev Propul Method
Free Swimming
Circ Wv Prev Resolution
High Resolution
Geometry Recent Year
2024
Geometry Rcnt Propul Method
Free Swimming
Geometry Rcnt Resolution
High Resolution
Geometrt Rcnt Measur Cups
No Cups
Geometry Previous Year
2019
Geometry Prev Propul Method
Free Swimming
Geometry Prev Resolution
High Resolution
Geometrt Prev Measur Cups
No Cups
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2013
Hydrtst Most Rcnt Pressure
1711
Direct Asmnt Conducted
No
Non Destructive Exam Ind
Yes
Exm Radiography Rcnt Year
2018
Exm Radiography Rcnt Ind
Yes
Preparer Name
S****** M********
Preparer Title
Compliance Program Leader
Preparer Email
S****************@b**********.com
Preparer Telephone
2709035764
Prepared Date
2024-07-12 00:00:00
Authorizer Name
T*** B****
Authorizer Telephone
2703146546
Authorizer Title
Manager Compliance Services
Authorizer Email
T*********@b**********.com
Narrative
On june 7, 2024, a contractor working for colonial pipeline notified boardwalk petrochemical pipeline (bpp) of a potential leak on its evangeline pipeline referred to as bpp-100. The potential leak was located on the south bank of the intracoastal waterway. Bpp performed a lab analysis to confirm the leak was ethylene. The site was excavated and a leak was discovered under an existing plidco clamp. The site was returned to its previous condition and the leak will be monitored bi-monthly until repairs are completed. The product leak rate is .7 lb/day. Bpp has developed an action plan and discussed it with PHMSA. The plan includes removing the leaking clamp and one (1) other clamp by june 14, 2025.
Report Received Date | 2024-07-12 00:00:00 |
---|---|
Iyear | 2024 |
Report Number | 20240163 |
Supplemental Number | 39769 |
Report Type | Original |
Operator Id | 31554 PHMSA Enforcement |
Name | Boardwalk Petrochemical Pipeline, Llc |
Operator Street Address | 9 Greenway Plaza |
Operator City Name | Houston |
Operator State Abbreviation | TX |
Operator Postal Code | 77046 |
Time Zone | Central |
Daylight Savings Ind | Yes |
Location Latitude | 30.044059 Google Maps OpenStreetMap |
Location Longitude | -93.727749 Google Maps OpenStreetMap |
Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
Commodity Subtype | Other Hvl |
Commodity Details | Ethylene |
Unintentional Release Bbls | 0.21 |
Intentional Release Bbls | 0 |
Recovered Bbls | 0 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Other |
Accident Details | Notification From Contractor Working In The Area For Another Operator. |
System Part Involved | Onshore Pipeline, Including Valve Sites |
On Off Shore | Onshore |
Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
Shutdown Due Accident Ind | No |
Shutdown Explain | Site Was Returned To Its Previous Condition While Repair Plan Is Developed |
Communication State Fed Ind | No |
Nrc Rpt Num | 1401900 NRC Report How to search |
Additional Nrc Report Numbers | 1402039 |
Ignite Ind | No |
Upstream Action Taken | Operational Control |
Upstream Oprtnl Cntrl Detail | No Action Taken To Control Flow Upstream. Repair Plan Has Been Discussed With Phmsa Central Region |
Downstream Action Taken | Operational Control |
Downstream Oprtnl Cntrl Detail | No Action Taken To Control Flow Downstream. Repair Plan Has Been Discussed With Phmsa Central Region |
Num Pub Evacuated | 0 |
Pipe Fac Name | Evangeline Pipeline |
Segment Name | Bpp-100 |
Onshore State Abbreviation | La |
Onshore Postal Code | 70631 |
Onshore City Name | Not Within A Municipality |
Onshore County Name | Cameron |
Designated Location | Survey Station No. |
Designated Name | 847+96 |
Federal | No |
Location Type | Pipeline Right-Of-Way |
Incident Area Type | Underground |
Incident Area Subtype | Under Soil |
Depth Of Cover | 20 |
Crossing | No |
Pipe Facility Type | Interstate |
Item Involved | Pipe |
Pipe Type | Pipe Body |
Puddle Weld Ind | No |
Pipe Diameter | 16 |
Pipe Wall Thickness | 0.312 |
Pipe Smys | 52000 |
Pipe Specification | Api 5l |
Pipe Seam Type | Other |
Pipe Seam Details | Erw-Dc |
Pipe Manufacturer | Youngstown |
Pipe Coating Type | Coal Tar |
Coating Applied Ind | Unknown |
Installation Year | 1954 |
Manufactured Year | 1954 |
Material Involved | Carbon Steel |
Release Type | Leak |
Leak Type | Pinhole |
Wildlife Impact Ind | No |
Soil Contamination | No |
Long Term Assessment | No |
Remediation Ind | No |
Water Contam Ind | No |
Could Be Hca | Yes |
Commodity Reached Hca | Yes |
Commercially Nav Ind | Yes |
Commercially Nav Yes No | Yes |
Est Cost Oper Paid | 0 |
Est Cost Gas Released | 6 |
Est Cost Prop Damage | 85000 |
Est Cost Emergency | 67038 |
Est Cost Environmental | 0 |
Est Cost Other | 0 |
Prpty | 152044 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 1170 |
Mop Psig | 1336 |
Mop Cfr Section | Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192 |
Maop Established Date | 2016-03-09 00:00:00 |
Maop Reversal Flow Ind | No |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Internal Inspection Ind | Yes |
Operation Complications Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Cpm In Place Ind | No |
Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
Investigation Status Details | No controllers were involved at point the leak was determined to constitute an accident. |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Material Failure Of Pipe Or Weld |
Cause Details | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
Field Exam Ind | Yes |
Failure Type | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
Other Factor | Yes |
Other Factor Details | Unknown At This Time |
Pwf Additional Other Ind | Yes |
Collected Data Ind | Yes |
Cir Trn Wave Mgn Flx Lkg Ind | Yes |
Geometry Deformation Ind | Yes |
Circ Wave Recent Year | 2024 |
Circ Wv Rcnt Propul Method | Free Swimming |
Circ Wv Rcnt Resolution | High Resolution |
Circ Wv Previous Year | 2019 |
Circ Wv Prev Propul Method | Free Swimming |
Circ Wv Prev Resolution | High Resolution |
Geometry Recent Year | 2024 |
Geometry Rcnt Propul Method | Free Swimming |
Geometry Rcnt Resolution | High Resolution |
Geometrt Rcnt Measur Cups | No Cups |
Geometry Previous Year | 2019 |
Geometry Prev Propul Method | Free Swimming |
Geometry Prev Resolution | High Resolution |
Geometrt Prev Measur Cups | No Cups |
Has Hydrtst Conduc Before Ind | Yes |
Hydrtst Most Rcnt Year | 2013 |
Hydrtst Most Rcnt Pressure | 1711 |
Direct Asmnt Conducted | No |
Non Destructive Exam Ind | Yes |
Exm Radiography Rcnt Year | 2018 |
Exm Radiography Rcnt Ind | Yes |
Preparer Name | S****** M******** |
Preparer Title | Compliance Program Leader |
Preparer Email | S****************@b**********.com |
Preparer Telephone | 2709035764 |
Prepared Date | 2024-07-12 00:00:00 |
Authorizer Name | T*** B**** |
Authorizer Telephone | 2703146546 |
Authorizer Title | Manager Compliance Services |
Authorizer Email | T*********@b**********.com |
Narrative | On june 7, 2024, a contractor working for colonial pipeline notified boardwalk petrochemical pipeline (bpp) of a potential leak on its evangeline pipeline referred to as bpp-100. The potential leak was located on the south bank of the intracoastal waterway. Bpp performed a lab analysis to confirm the leak was ethylene. The site was excavated and a leak was discovered under an existing plidco clamp. The site was returned to its previous condition and the leak will be monitored bi-monthly until repairs are completed. The product leak rate is .7 lb/day. Bpp has developed an action plan and discussed it with PHMSA. The plan includes removing the leaking clamp and one (1) other clamp by june 14, 2025. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA