HL incident on 2024-07-12 — TX

Operator
Boardwalk Petrochemical Pipeline, Llc
Cause
Material Failure Of Pipe Or Weld
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$85,000
Incident datetime
2024-07-12 00:00 UTC
Report number
Location
TX
Narrative
On june 7, 2024, a contractor working for colonial pipeline notified boardwalk petrochemical pipeline (bpp) of a potential leak on its evangeline pipeline referred to as bpp-100. The potential leak was located on the south bank of the intracoastal waterway. Bpp performed a lab analysis to confirm the leak was ethylene. The site was excavated and a leak was discovered under an existing plidco clamp. The site was returned to its previous condition and the leak will be monitored bi-monthly until repairs are completed. The product leak rate is .7 lb/day. Bpp has developed an action plan and discussed it with PHMSA. The plan includes removing the leaking clamp and one (1) other clamp by june 14, 2025.
Detailed record list
Report Received Date
2024-07-12 00:00:00
Iyear
2024
Report Number
20240163
Supplemental Number
39769
Report Type
Original
Operator Id
Name
Boardwalk Petrochemical Pipeline, Llc
Operator Street Address
9 Greenway Plaza
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77046
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Ethylene
Unintentional Release Bbls
0.21
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Other
Accident Details
Notification From Contractor Working In The Area For Another Operator.
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Site Was Returned To Its Previous Condition While Repair Plan Is Developed
Communication State Fed Ind
No
Nrc Rpt Num
Additional Nrc Report Numbers
1402039
Ignite Ind
No
Upstream Action Taken
Operational Control
Upstream Oprtnl Cntrl Detail
No Action Taken To Control Flow Upstream. Repair Plan Has Been Discussed With Phmsa Central Region
Downstream Action Taken
Operational Control
Downstream Oprtnl Cntrl Detail
No Action Taken To Control Flow Downstream. Repair Plan Has Been Discussed With Phmsa Central Region
Num Pub Evacuated
0
Pipe Fac Name
Evangeline Pipeline
Segment Name
Bpp-100
Onshore State Abbreviation
La
Onshore Postal Code
70631
Onshore City Name
Not Within A Municipality
Onshore County Name
Cameron
Designated Location
Survey Station No.
Designated Name
847+96
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
20
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
16
Pipe Wall Thickness
0.312
Pipe Smys
52000
Pipe Specification
Api 5l
Pipe Seam Type
Other
Pipe Seam Details
Erw-Dc
Pipe Manufacturer
Youngstown
Pipe Coating Type
Coal Tar
Coating Applied Ind
Unknown
Installation Year
1954
Manufactured Year
1954
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Commercially Nav Ind
Yes
Commercially Nav Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
6
Est Cost Prop Damage
85000
Est Cost Emergency
67038
Est Cost Environmental
0
Est Cost Other
0
Prpty
152044
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
1170
Mop Psig
1336
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
2016-03-09 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
No controllers were involved at point the leak was determined to constitute an accident.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Field Exam Ind
Yes
Failure Type
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Other Factor
Yes
Other Factor Details
Unknown At This Time
Pwf Additional Other Ind
Yes
Collected Data Ind
Yes
Cir Trn Wave Mgn Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Circ Wave Recent Year
2024
Circ Wv Rcnt Propul Method
Free Swimming
Circ Wv Rcnt Resolution
High Resolution
Circ Wv Previous Year
2019
Circ Wv Prev Propul Method
Free Swimming
Circ Wv Prev Resolution
High Resolution
Geometry Recent Year
2024
Geometry Rcnt Propul Method
Free Swimming
Geometry Rcnt Resolution
High Resolution
Geometrt Rcnt Measur Cups
No Cups
Geometry Previous Year
2019
Geometry Prev Propul Method
Free Swimming
Geometry Prev Resolution
High Resolution
Geometrt Prev Measur Cups
No Cups
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2013
Hydrtst Most Rcnt Pressure
1711
Direct Asmnt Conducted
No
Non Destructive Exam Ind
Yes
Exm Radiography Rcnt Year
2018
Exm Radiography Rcnt Ind
Yes
Preparer Name
S****** M********
Preparer Title
Compliance Program Leader
Preparer Email
S****************@b**********.com
Preparer Telephone
2709035764
Prepared Date
2024-07-12 00:00:00
Authorizer Name
T*** B****
Authorizer Telephone
2703146546
Authorizer Title
Manager Compliance Services
Authorizer Email
T*********@b**********.com
Narrative
On june 7, 2024, a contractor working for colonial pipeline notified boardwalk petrochemical pipeline (bpp) of a potential leak on its evangeline pipeline referred to as bpp-100. The potential leak was located on the south bank of the intracoastal waterway. Bpp performed a lab analysis to confirm the leak was ethylene. The site was excavated and a leak was discovered under an existing plidco clamp. The site was returned to its previous condition and the leak will be monitored bi-monthly until repairs are completed. The product leak rate is .7 lb/day. Bpp has developed an action plan and discussed it with PHMSA. The plan includes removing the leaking clamp and one (1) other clamp by june 14, 2025.
Report Received Date 2024-07-12 00:00:00
Iyear 2024
Report Number 20240163
Supplemental Number 39769
Report Type Original
Operator Id 31554 PHMSA Enforcement
Name Boardwalk Petrochemical Pipeline, Llc
Operator Street Address 9 Greenway Plaza
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77046
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 30.044059 Google Maps OpenStreetMap
Location Longitude -93.727749 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Other Hvl
Commodity Details Ethylene
Unintentional Release Bbls 0.21
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Other
Accident Details Notification From Contractor Working In The Area For Another Operator.
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind No
Shutdown Explain Site Was Returned To Its Previous Condition While Repair Plan Is Developed
Communication State Fed Ind No
Nrc Rpt Num 1401900 NRC Report How to search
Additional Nrc Report Numbers 1402039
Ignite Ind No
Upstream Action Taken Operational Control
Upstream Oprtnl Cntrl Detail No Action Taken To Control Flow Upstream. Repair Plan Has Been Discussed With Phmsa Central Region
Downstream Action Taken Operational Control
Downstream Oprtnl Cntrl Detail No Action Taken To Control Flow Downstream. Repair Plan Has Been Discussed With Phmsa Central Region
Num Pub Evacuated 0
Pipe Fac Name Evangeline Pipeline
Segment Name Bpp-100
Onshore State Abbreviation La
Onshore Postal Code 70631
Onshore City Name Not Within A Municipality
Onshore County Name Cameron
Designated Location Survey Station No.
Designated Name 847+96
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 20
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Puddle Weld Ind No
Pipe Diameter 16
Pipe Wall Thickness 0.312
Pipe Smys 52000
Pipe Specification Api 5l
Pipe Seam Type Other
Pipe Seam Details Erw-Dc
Pipe Manufacturer Youngstown
Pipe Coating Type Coal Tar
Coating Applied Ind Unknown
Installation Year 1954
Manufactured Year 1954
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
Commercially Nav Ind Yes
Commercially Nav Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 6
Est Cost Prop Damage 85000
Est Cost Emergency 67038
Est Cost Environmental 0
Est Cost Other 0
Prpty 152044
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 1170
Mop Psig 1336
Mop Cfr Section Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192
Maop Established Date 2016-03-09 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details No controllers were involved at point the leak was determined to constitute an accident.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Field Exam Ind Yes
Failure Type Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Other Factor Yes
Other Factor Details Unknown At This Time
Pwf Additional Other Ind Yes
Collected Data Ind Yes
Cir Trn Wave Mgn Flx Lkg Ind Yes
Geometry Deformation Ind Yes
Circ Wave Recent Year 2024
Circ Wv Rcnt Propul Method Free Swimming
Circ Wv Rcnt Resolution High Resolution
Circ Wv Previous Year 2019
Circ Wv Prev Propul Method Free Swimming
Circ Wv Prev Resolution High Resolution
Geometry Recent Year 2024
Geometry Rcnt Propul Method Free Swimming
Geometry Rcnt Resolution High Resolution
Geometrt Rcnt Measur Cups No Cups
Geometry Previous Year 2019
Geometry Prev Propul Method Free Swimming
Geometry Prev Resolution High Resolution
Geometrt Prev Measur Cups No Cups
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 2013
Hydrtst Most Rcnt Pressure 1711
Direct Asmnt Conducted No
Non Destructive Exam Ind Yes
Exm Radiography Rcnt Year 2018
Exm Radiography Rcnt Ind Yes
Preparer Name S****** M********
Preparer Title Compliance Program Leader
Preparer Email S****************@b**********.com
Preparer Telephone 2709035764
Prepared Date 2024-07-12 00:00:00
Authorizer Name T*** B****
Authorizer Telephone 2703146546
Authorizer Title Manager Compliance Services
Authorizer Email T*********@b**********.com
Narrative On june 7, 2024, a contractor working for colonial pipeline notified boardwalk petrochemical pipeline (bpp) of a potential leak on its evangeline pipeline referred to as bpp-100. The potential leak was located on the south bank of the intracoastal waterway. Bpp performed a lab analysis to confirm the leak was ethylene. The site was excavated and a leak was discovered under an existing plidco clamp. The site was returned to its previous condition and the leak will be monitored bi-monthly until repairs are completed. The product leak rate is .7 lb/day. Bpp has developed an action plan and discussed it with PHMSA. The plan includes removing the leaking clamp and one (1) other clamp by june 14, 2025.

All rights reserved. Copyright © by ClearPHMSA