Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2024-06-26 — TX
Operator
Enterprise Products Operating Llc
Cause
Equipment Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$393,000
Incident datetime
2024-06-26 00:00 UTC
Report number
Location
TX
Narrative
On 5/28/2024 at 16:30, operator technicians noticed an ice ball from a valve stem packing leak and started repairing it. When the leak was not able to be repaired, he notified the supervisor. Operations then notified pipeline control. Ert and local responders were notified and the road was closed as a precaution. Release was determined reportable at 21:45 due to the cost of repair. Rrc accident #3101 reported 5/28/2024 at 22:04.
Detailed record list
Report Received Date
2024-06-26 00:00:00
Iyear
2024
Report Number
20240154
Supplemental Number
39917
Report Type
Supplemental Final
Operator Id
31618
Name
Enterprise Products Operating Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
29.76555
Location Longitude
-95.12437
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Propylene
Unintentional Release Bbls
10
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Nrc Rpt Num
1400202
Additional Nrc Report Numbers
1400413
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Type Ind
Manual
Downstream Action Taken
Valve Closure
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Pdh 2 To Eht
Segment Name
Sm106
Onshore State Abbreviation
Tx
Onshore Postal Code
77015
Onshore City Name
Houston
Onshore County Name
Harris
Designated Location
Survey Station No.
Designated Name
941+00
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Valve
Valve Type
Mainline
Valve Mainline Type
Gate
Valve Manufacturer
Om&j
Installation Year
2022
Manufactured Year
2022
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
Stem Galling
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Commercially Nav Ind
Yes
Commercially Nav Yes No
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
1000
Est Cost Prop Damage
393000
Est Cost Emergency
0
Est Cost Environmental
25000
Est Cost Other
47000
Est Cost Other Details
$47,000 For Lab Analysis
Prpty
466000
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
679
Mop Psig
1480
Mop Cfr Section
Internal Design Pressure �195.406(A)(1)
Maop Established Date
2022-08-22 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
38663
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Valve stem packing leak.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Other Equipment Failure
Eq Failure Type
Other Equipment Failure
Failure Details
Third Party Failure Analysis Indicated Stem Galling Caused By A Manufacturing Defect That Caused Side Loading On The Stem.
Additional Defect Ind
Yes
Preparer Name
C******* V******
Preparer Email
C********@e****.com
Prepared Date
2024-08-21 00:00:00
Authorizer Name
C******* V******
Authorizer Telephone
8326575864
Authorizer Email
C********@e****.com
Narrative
On 5/28/2024 at 16:30, operator technicians noticed an ice ball from a valve stem packing leak and started repairing it. When the leak was not able to be repaired, he notified the supervisor. Operations then notified pipeline control. Ert and local responders were notified and the road was closed as a precaution. Release was determined reportable at 21:45 due to the cost of repair. Rrc accident #3101 reported 5/28/2024 at 22:04.
Report Received Date | 2024-06-26 00:00:00 |
---|---|
Iyear | 2024 |
Report Number | 20240154 |
Supplemental Number | 39917 |
Report Type | Supplemental Final |
Operator Id | 31618 PHMSA Enforcement |
Name | Enterprise Products Operating Llc |
Operator Street Address | 1100 Louisiana Street |
Operator City Name | Houston |
Operator State Abbreviation | TX |
Operator Postal Code | 77002 |
Time Zone | Central |
Daylight Savings Ind | Yes |
Location Latitude | 29.76555 Google Maps OpenStreetMap |
Location Longitude | -95.12437 Google Maps OpenStreetMap |
Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
Commodity Subtype | Other Hvl |
Commodity Details | Propylene |
Unintentional Release Bbls | 10 |
Intentional Release Bbls | 0 |
Recovered Bbls | 0 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Local Operating Personnel, Including Contractors |
Operator Type | Operator Employee |
System Part Involved | Onshore Pipeline, Including Valve Sites |
On Off Shore | Onshore |
Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
Shutdown Due Accident Ind | Yes |
Communication State Fed Ind | Yes |
Party Initiated Communication | Operator |
Nrc Rpt Num | 1400202 NRC Report How to search |
Additional Nrc Report Numbers | 1400413 |
Ignite Ind | No |
Upstream Action Taken | Valve Closure |
Upstream Valve Type Ind | Manual |
Downstream Action Taken | Valve Closure |
Downstream Valve Type Ind | Manual |
Num Pub Evacuated | 0 |
Pipe Fac Name | Pdh 2 To Eht |
Segment Name | Sm106 |
Onshore State Abbreviation | Tx |
Onshore Postal Code | 77015 |
Onshore City Name | Houston |
Onshore County Name | Harris |
Designated Location | Survey Station No. |
Designated Name | 941+00 |
Federal | No |
Location Type | Pipeline Right-Of-Way |
Incident Area Type | Aboveground |
Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
Crossing | No |
Pipe Facility Type | Intrastate |
Item Involved | Valve |
Valve Type | Mainline |
Valve Mainline Type | Gate |
Valve Manufacturer | Om&j |
Installation Year | 2022 |
Manufactured Year | 2022 |
Material Involved | Carbon Steel |
Release Type | Leak |
Leak Type | Other |
Leak Type Other | Stem Galling |
Wildlife Impact Ind | No |
Soil Contamination | No |
Long Term Assessment | No |
Remediation Ind | No |
Water Contam Ind | No |
Could Be Hca | Yes |
Commodity Reached Hca | Yes |
Commercially Nav Ind | Yes |
Commercially Nav Yes No | Yes |
High Pop Ind | Yes |
High Pop Yes No | Yes |
Other Pop Ind | Yes |
Other Pop Yes No | Yes |
Usa Ecological Ind | Yes |
Usa Ecological Yes No | Yes |
Est Cost Oper Paid | 0 |
Est Cost Gas Released | 1000 |
Est Cost Prop Damage | 393000 |
Est Cost Emergency | 0 |
Est Cost Environmental | 25000 |
Est Cost Other | 47000 |
Est Cost Other Details | $47,000 For Lab Analysis |
Prpty | 466000 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 679 |
Mop Psig | 1480 |
Mop Cfr Section | Internal Design Pressure �195.406(A)(1) View CFR 49 §192 |
Maop Established Date | 2022-08-22 00:00:00 |
Maop Reversal Flow Ind | No |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Length Segment Isolated | 38663 |
Internal Inspection Ind | Yes |
Operation Complications Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Cpm In Place Ind | Yes |
Cpm Operating Ind | Yes |
Cpm Functional Ind | Yes |
Cpm Detection Ind | No |
Cpm Conf Ind | No |
Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
Investigation Status Details | Valve stem packing leak. |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Equipment Failure |
Cause Details | Other Equipment Failure |
Eq Failure Type | Other Equipment Failure |
Failure Details | Third Party Failure Analysis Indicated Stem Galling Caused By A Manufacturing Defect That Caused Side Loading On The Stem. |
Additional Defect Ind | Yes |
Preparer Name | C******* V****** |
Preparer Email | C********@e****.com |
Prepared Date | 2024-08-21 00:00:00 |
Authorizer Name | C******* V****** |
Authorizer Telephone | 8326575864 |
Authorizer Email | C********@e****.com |
Narrative | On 5/28/2024 at 16:30, operator technicians noticed an ice ball from a valve stem packing leak and started repairing it. When the leak was not able to be repaired, he notified the supervisor. Operations then notified pipeline control. Ert and local responders were notified and the road was closed as a precaution. Release was determined reportable at 21:45 due to the cost of repair. Rrc accident #3101 reported 5/28/2024 at 22:04. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA