GTG incident on 2024-12-02 — TX

Operator
Net Mexico Pipeline Partners, Llc
Cause
Equipment Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$500
Incident datetime
2024-12-02 00:00 UTC
Report number
Location
TX
Narrative
On 11/05/2024 at approximately 04:45, due to an increasing flow rate that could not be controlled with a set point change, gas control called a technician to investigate the regulators at the efm 4 to net mexico meter station. Upon arrival, the technician found the station blowing gas to the atmosphere and discovered a broken 1" nipple on the #2 regulator run. At approximately 06:00, the technician shut the upstream manual valve and verified that the downstream pneumatic valve was closed. The technician then throttled the #1 regulator to achieve the desired set point given by gas control. At 06:30, the technician replaced the nipple with an xxh nipple, installed a new 1" valve, reconnected the tubing, and returned the station to normal service.
Detailed record list
Report Received Date
2024-12-02 00:00:00
Iyear
2024
Report Number
20240133
Supplemental Number
40820
Report Type
Supplemental Final
Operator Id
Name
Net Mexico Pipeline Partners, Llc
Operator Street Address
1001 Louisiana Street, Suite 1000
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
No
Location Latitude
Location Longitude
-97.82109908
Nrc Rpt Num
Additional Nrc Report Numbers
1415742
Commodity Released Type
Natural Gas
Unintentional Release
3230
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
No
Ignite Ind
No
Num Pub Evacuated
0
On Off Shore
Onshore
Onshore State Abbreviation
Tx
Onshore Postal Code
78380
Onshore City Name
Robstown
Onshore County Name
Nueces
Designated Location
Not Applicable
Pipe Fac Name
Efm 4 To Net Mexico Meter Station
Segment Name
Pin 57007
Federal
No
Location Type
Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
System Part Involved
Onshore Regulator/metering Station Equipment And Piping
Item Involved
Meter
Installation Year
2013
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
757
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
4845
Est Cost Intentional Release
0
Est Cost Prop Damage
500
Est Cost Emergency
100
Est Cost Other
0
Gas Cost In Mcf
1.5
Prpty
5445
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
1015
Gas Flow In Pipe In Mcf
300000
Mop Psig
1200
Mop Cfr Section
192.619(A)(1)
Maop Established Date
2013-05-24 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Accident Identifier
Controller
Operator Type
Operator Employee
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Threaded Connection/coupling Failure
Eq Failure Type
Threaded Connection/coupling Failure
Other Stripped Ind
Pipe Nipple
Additional Vibration Ind
Yes
Preparer Name
G****** J**** D****
Preparer Title
Pipeline Engineer Codes And Standards
Preparer Email
G************@k***********.com
Preparer Telephone
8329770230
Authorizer Name
Z*** R*****
Authorizer Title
Director Of Codes And Standards
Authorizer Telephone
7134202609
Authorizer Email
Z**********@k***********.com
Narrative
On 11/05/2024 at approximately 04:45, due to an increasing flow rate that could not be controlled with a set point change, gas control called a technician to investigate the regulators at the efm 4 to net mexico meter station. Upon arrival, the technician found the station blowing gas to the atmosphere and discovered a broken 1" nipple on the #2 regulator run. At approximately 06:00, the technician shut the upstream manual valve and verified that the downstream pneumatic valve was closed. The technician then throttled the #1 regulator to achieve the desired set point given by gas control. At 06:30, the technician replaced the nipple with an xxh nipple, installed a new 1" valve, reconnected the tubing, and returned the station to normal service.
Report Received Date 2024-12-02 00:00:00
Iyear 2024
Report Number 20240133
Supplemental Number 40820
Report Type Supplemental Final
Operator Id 39223 PHMSA Enforcement
Name Net Mexico Pipeline Partners, Llc
Operator Street Address 1001 Louisiana Street, Suite 1000
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Time Zone Central
Daylight Savings Ind No
Location Latitude 27.74798194 Google Maps OpenStreetMap
Location Longitude -97.82109908 Google Maps OpenStreetMap
Nrc Rpt Num 1415639 NRC Report How to search
Additional Nrc Report Numbers 1415742
Commodity Released Type Natural Gas
Unintentional Release 3230
Intentional Release 0
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Status When Identified Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind Yes
Communication State Fed Ind No
Ignite Ind No
Num Pub Evacuated 0
On Off Shore Onshore
Onshore State Abbreviation Tx
Onshore Postal Code 78380
Onshore City Name Robstown
Onshore County Name Nueces
Designated Location Not Applicable
Pipe Fac Name Efm 4 To Net Mexico Meter Station
Segment Name Pin 57007
Federal No
Location Type Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Intrastate
System Part Involved Onshore Regulator/metering Station Equipment And Piping
Item Involved Meter
Installation Year 2013
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Connection Failure
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 757
Heat Damage Ind No
Non Heat Damage Ind No
Did Occur In Mca Ind No
Est Cost Oper Paid 0
Est Cost Unintentional Release 4845
Est Cost Intentional Release 0
Est Cost Prop Damage 500
Est Cost Emergency 100
Est Cost Other 0
Gas Cost In Mcf 1.5
Prpty 5445
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Wildlife Impact Ind No
Accident Psig 1015
Gas Flow In Pipe In Mcf 300000
Mop Psig 1200
Mop Cfr Section 192.619(A)(1) View CFR 49 §192
Maop Established Date 2013-05-24 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Gas Required Odorized Ind No
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Accident Identifier Controller
Operator Type Operator Employee
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Threaded Connection/coupling Failure
Eq Failure Type Threaded Connection/coupling Failure
Other Stripped Ind Pipe Nipple
Additional Vibration Ind Yes
Preparer Name G****** J**** D****
Preparer Title Pipeline Engineer Codes And Standards
Preparer Email G************@k***********.com
Preparer Telephone 8329770230
Authorizer Name Z*** R*****
Authorizer Title Director Of Codes And Standards
Authorizer Telephone 7134202609
Authorizer Email Z**********@k***********.com
Narrative On 11/05/2024 at approximately 04:45, due to an increasing flow rate that could not be controlled with a set point change, gas control called a technician to investigate the regulators at the efm 4 to net mexico meter station. Upon arrival, the technician found the station blowing gas to the atmosphere and discovered a broken 1" nipple on the #2 regulator run. At approximately 06:00, the technician shut the upstream manual valve and verified that the downstream pneumatic valve was closed. The technician then throttled the #1 regulator to achieve the desired set point given by gas control. At 06:30, the technician replaced the nipple with an xxh nipple, installed a new 1" valve, reconnected the tubing, and returned the station to normal service.