GTG incident on 2024-11-22 — TX

Operator
Tennessee Gas Pipeline Company
Cause
Equipment Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$60,000
Incident datetime
2024-11-22 00:00 UTC
Report number
Location
TX
Narrative
Tgp station 87 relief valve actuation resulting in a PHMSA reportable quantity of 18,390 mcf. On 10/22/2024, at approximately 7:28 pm cst, line 500 - 1x3 crossover valve prematurely closed. When the valve actuated, running engines caused elevated pressure on line 100-3 in the station yard. Units 7c and 8c shut down due to high discharge pressure seen on the unit pressure switches. To protect the system maop, the relief valve on 100-3 in the station yard also began to vent. The relief valve vented and re-set itself multiple times until it failed open due to the internal seat becoming dislodged. Line 100-3 has been isolated in the yard. Investigation underway. Supplemental report will be submitted with findings. No injuries, no oil mist released, no emergency response or road closures.
Detailed record list
Report Received Date
2024-11-22 00:00:00
Iyear
2024
Report Number
20240128
Supplemental Number
40248
Report Type
Supplemental Final
Operator Id
Name
Tennessee Gas Pipeline Company
Operator Street Address
1001 Louisiana St
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Nrc Rpt Num
Additional Nrc Report Numbers
1414844
Commodity Released Type
Natural Gas
Unintentional Release
18390
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
No
Ignite Ind
No
Num Pub Evacuated
0
On Off Shore
Onshore
Onshore State Abbreviation
Tn
Onshore Postal Code
37148
Onshore City Name
Portland
Onshore County Name
Sumner
Designated Location
Not Applicable
Pipe Fac Name
Tgp Compressor Station 87
Segment Name
Relief Valve
Federal
No
Location Type
Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Compressor Station Equipment And Piping
Item Involved
Valve
Valve Type
Relief Valve
Installation Year
Unknown
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
Internal Seat Dislodged
Class Location Type
Class 2 Location
Could Be Hca
No
Pir Radius
567
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
40458
Est Cost Intentional Release
0
Est Cost Prop Damage
60000
Est Cost Emergency
0
Est Cost Other
0
Gas Cost In Mcf
2.2
Prpty
100458
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
750
Gas Flow In Pipe In Mcf
2200
Mop Psig
750
Mop Cfr Section
192.619(A)(2)
Maop Established Date
1950-10-06 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
1
Num Employees Failed
0
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Relief Valve Ind
Yes
Eq Additional Other Ind
Yes
Eq Additional Other Details
Investigation Underway For Internal Seat Dislodged
Preparer Name
R***** B***** I*
Preparer Title
Engineer - Codes And Standards
Preparer Email
R************@k***********.com
Preparer Telephone
713-420-2324
Authorizer Name
Z*** R*****
Authorizer Title
Director - Engineering Codes And Standards
Authorizer Telephone
713-420-2609
Authorizer Email
Z**********@k***********.com
Narrative
Tgp station 87 relief valve actuation resulting in a PHMSA reportable quantity of 18,390 mcf. On 10/22/2024, at approximately 7:28 pm cst, line 500 - 1x3 crossover valve prematurely closed. When the valve actuated, running engines caused elevated pressure on line 100-3 in the station yard. Units 7c and 8c shut down due to high discharge pressure seen on the unit pressure switches. To protect the system maop, the relief valve on 100-3 in the station yard also began to vent. The relief valve vented and re-set itself multiple times until it failed open due to the internal seat becoming dislodged. Line 100-3 has been isolated in the yard. Investigation underway. Supplemental report will be submitted with findings. No injuries, no oil mist released, no emergency response or road closures.
Report Received Date 2024-11-22 00:00:00
Iyear 2024
Report Number 20240128
Supplemental Number 40248
Report Type Supplemental Final
Operator Id 19160 PHMSA Enforcement
Name Tennessee Gas Pipeline Company
Operator Street Address 1001 Louisiana St
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 36.615833 Google Maps OpenStreetMap
Location Longitude -86.559722 Google Maps OpenStreetMap
Nrc Rpt Num 1414436 NRC Report How to search
Additional Nrc Report Numbers 1414844
Commodity Released Type Natural Gas
Unintentional Release 18390
Intentional Release 0
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Status When Identified Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind Yes
Communication State Fed Ind No
Ignite Ind No
Num Pub Evacuated 0
On Off Shore Onshore
Onshore State Abbreviation Tn
Onshore Postal Code 37148
Onshore City Name Portland
Onshore County Name Sumner
Designated Location Not Applicable
Pipe Fac Name Tgp Compressor Station 87
Segment Name Relief Valve
Federal No
Location Type Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
System Part Involved Onshore Compressor Station Equipment And Piping
Item Involved Valve
Valve Type Relief Valve
Installation Year Unknown
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Other
Leak Type Other Internal Seat Dislodged
Class Location Type Class 2 Location
Could Be Hca No
Pir Radius 567
Heat Damage Ind No
Non Heat Damage Ind No
Did Occur In Mca Ind No
Est Cost Oper Paid 0
Est Cost Unintentional Release 40458
Est Cost Intentional Release 0
Est Cost Prop Damage 60000
Est Cost Emergency 0
Est Cost Other 0
Gas Cost In Mcf 2.2
Prpty 100458
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Wildlife Impact Ind No
Accident Psig 750
Gas Flow In Pipe In Mcf 2200
Mop Psig 750
Mop Cfr Section 192.619(A)(2) View CFR 49 §192
Maop Established Date 1950-10-06 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Gas Required Odorized Ind No
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind Yes
Contractor Drug Test Ind No
Num Employees Tested 1
Num Employees Failed 0
Cause Equipment Failure
Cause Details Malfunction Of Control/relief Equipment
Eq Failure Type Malfunction Of Control/relief Equipment
Relief Valve Ind Yes
Eq Additional Other Ind Yes
Eq Additional Other Details Investigation Underway For Internal Seat Dislodged
Preparer Name R***** B***** I*
Preparer Title Engineer - Codes And Standards
Preparer Email R************@k***********.com
Preparer Telephone 713-420-2324
Authorizer Name Z*** R*****
Authorizer Title Director - Engineering Codes And Standards
Authorizer Telephone 713-420-2609
Authorizer Email Z**********@k***********.com
Narrative Tgp station 87 relief valve actuation resulting in a PHMSA reportable quantity of 18,390 mcf. On 10/22/2024, at approximately 7:28 pm cst, line 500 - 1x3 crossover valve prematurely closed. When the valve actuated, running engines caused elevated pressure on line 100-3 in the station yard. Units 7c and 8c shut down due to high discharge pressure seen on the unit pressure switches. To protect the system maop, the relief valve on 100-3 in the station yard also began to vent. The relief valve vented and re-set itself multiple times until it failed open due to the internal seat becoming dislodged. Line 100-3 has been isolated in the yard. Investigation underway. Supplemental report will be submitted with findings. No injuries, no oil mist released, no emergency response or road closures.

All rights reserved. Copyright © by ClearPHMSA