HL incident on 2024-05-01 — GA

Operator
Colonial Pipeline Co
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$50,000
Incident datetime
2024-05-01 00:00 UTC
Report number
Location
GA
Narrative
On 03 april 2024, at approximately 07:00, stained gravel was discovered near line 2 ' unit 3 suction valve. An investigation to determine the source began immediately. At approximately 07:42 product was discovered by contractors while conducting an exploratory hand dig near the valve. Appropriate notifications were made, and additional spill response personnel were mobilized to further assess and mitigate. The line 2 station loop was isolated from the main line. At approximately 10:15 the leak source was identified as the line 2 unit 3 suction valve lubrication line at the threaded connection between the nipple and valve body. The lubrication and blowdown lines were removed and replaced with threaded plugs. Repairs were completed at approximately 1826 cst and normal operations resumed. At approximately 11:00, it was discovered the repair and response costs were likely to exceed $50,000, thus, a nrc notification was made at 11:45 cst. All released product was contained on colonial pipeline company property and the estimated volume of released product was recovered.
Detailed record list
Report Received Date
2024-05-01 00:00:00
Iyear
2024
Report Number
20240103
Supplemental Number
39506
Report Type
Original Final
Operator Id
Name
Colonial Pipeline Co
Operator Street Address
1000 Lake St.
Operator City Name
Alpharetta
Operator State Abbreviation
GA
Operator Postal Code
30009
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
-90.44725133
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
4.6
Recovered Bbls
4.6
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Nrc Rpt Num
Additional Nrc Report Numbers
1395662
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
Yes
Osro Arrived On Site Dt
4/3/2024 7:00
Num Pub Evacuated
0
Pipe Fac Name
Mccomb Station
Segment Name
Unit 1722
Onshore State Abbreviation
Ms
Onshore Postal Code
39652
Onshore City Name
Magnolia
Onshore County Name
Pike
Designated Location
Survey Station No.
Designated Name
Location 321
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
48
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Tubing
Tubing Material
Carbon Steel
Tubing Type
Rigid
Installation Year
1975
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
550
Est Cost Prop Damage
50000
Est Cost Emergency
20000
Est Cost Environmental
120000
Est Cost Other
0
Est Cost Other Details
None
Prpty
190550
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
358
Mop Psig
720
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
1978-09-17 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Equipment failure of tubing
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Threaded Connection/coupling Failure
Eq Failure Type
Threaded Connection/coupling Failure
Other Stripped Ind
Pipe Nipple
Additional Improper Mntnce Ind
Yes
Preparer Name
R***** D*****
Preparer Title
Sr Compliance Specialist
Preparer Email
R******@c******.com
Preparer Telephone
4097904288
Prepared Date
2024-05-01 00:00:00
Authorizer Name
Q****** F******
Authorizer Telephone
7706879672
Authorizer Title
Pipeline Compliance Director
Authorizer Email
Q*******@c******.com
Narrative
On 03 april 2024, at approximately 07:00, stained gravel was discovered near line 2 ' unit 3 suction valve. An investigation to determine the source began immediately. At approximately 07:42 product was discovered by contractors while conducting an exploratory hand dig near the valve. Appropriate notifications were made, and additional spill response personnel were mobilized to further assess and mitigate. The line 2 station loop was isolated from the main line. At approximately 10:15 the leak source was identified as the line 2 unit 3 suction valve lubrication line at the threaded connection between the nipple and valve body. The lubrication and blowdown lines were removed and replaced with threaded plugs. Repairs were completed at approximately 1826 cst and normal operations resumed. At approximately 11:00, it was discovered the repair and response costs were likely to exceed $50,000, thus, a nrc notification was made at 11:45 cst. All released product was contained on colonial pipeline company property and the estimated volume of released product was recovered.
Report Received Date 2024-05-01 00:00:00
Iyear 2024
Report Number 20240103
Supplemental Number 39506
Report Type Original Final
Operator Id 2552 PHMSA Enforcement
Name Colonial Pipeline Co
Operator Street Address 1000 Lake St.
Operator City Name Alpharetta
Operator State Abbreviation GA
Operator Postal Code 30009
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 31.12033717 Google Maps OpenStreetMap
Location Longitude -90.44725133 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Gasoline (Non-Ethanol)
Unintentional Release Bbls 4.6
Recovered Bbls 4.6
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Communication State Fed Ind Yes
Party Initiated Communication Operator
Nrc Rpt Num 1395492 NRC Report How to search
Additional Nrc Report Numbers 1395662
Ignite Ind No
Notify Qualified Indiv Ind Yes
Oil Spill Removal Org Ind Yes
Osro Arrived On Site Dt 4/3/2024 7:00
Num Pub Evacuated 0
Pipe Fac Name Mccomb Station
Segment Name Unit 1722
Onshore State Abbreviation Ms
Onshore Postal Code 39652
Onshore City Name Magnolia
Onshore County Name Pike
Designated Location Survey Station No.
Designated Name Location 321
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 48
Crossing No
Pipe Facility Type Interstate
Item Involved Tubing
Tubing Material Carbon Steel
Tubing Type Rigid
Installation Year 1975
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Connection Failure
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 550
Est Cost Prop Damage 50000
Est Cost Emergency 20000
Est Cost Environmental 120000
Est Cost Other 0
Est Cost Other Details None
Prpty 190550
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 358
Mop Psig 720
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 1978-09-17 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind Yes
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Equipment failure of tubing
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Threaded Connection/coupling Failure
Eq Failure Type Threaded Connection/coupling Failure
Other Stripped Ind Pipe Nipple
Additional Improper Mntnce Ind Yes
Preparer Name R***** D*****
Preparer Title Sr Compliance Specialist
Preparer Email R******@c******.com
Preparer Telephone 4097904288
Prepared Date 2024-05-01 00:00:00
Authorizer Name Q****** F******
Authorizer Telephone 7706879672
Authorizer Title Pipeline Compliance Director
Authorizer Email Q*******@c******.com
Narrative On 03 april 2024, at approximately 07:00, stained gravel was discovered near line 2 ' unit 3 suction valve. An investigation to determine the source began immediately. At approximately 07:42 product was discovered by contractors while conducting an exploratory hand dig near the valve. Appropriate notifications were made, and additional spill response personnel were mobilized to further assess and mitigate. The line 2 station loop was isolated from the main line. At approximately 10:15 the leak source was identified as the line 2 unit 3 suction valve lubrication line at the threaded connection between the nipple and valve body. The lubrication and blowdown lines were removed and replaced with threaded plugs. Repairs were completed at approximately 1826 cst and normal operations resumed. At approximately 11:00, it was discovered the repair and response costs were likely to exceed $50,000, thus, a nrc notification was made at 11:45 cst. All released product was contained on colonial pipeline company property and the estimated volume of released product was recovered.