Incident details
Operator, cause, commodity and consequences with raw source fields.
GTG incident on 2024-08-02 — KY
Operator
Southern Star Central Gas Pipeline, Inc
Cause
Equipment Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$1,200
Incident datetime
2024-08-02 00:00 UTC
Report number
Location
KY
Narrative
On 7/5/2025 southern star central gas pipeline (sscgp) gas control was called at 3:40 am cdt about a possible gas leak and noticed a rapid pressure loss and flow changes at the saginaw compressor station. After initial review of the pressure drop it was determined at 4:07 am that the gas loss would be over the reportable threshold and the nrc was notified at 4:22 am. At 4:13 am, the on-site operator personnel determined it was a pressure relief valve (prv) activation that was the source of the pressure drop and shut in the prv at 4:14 am, no actual maop exceedance occurred. It was determined that the prv malfunction was due to a loose blowdown ring. The prv was repaired, tested and recertified with a set point of 715 psig and placed back in service on 7/5/2024 at 6:40 pm cdt.
Detailed record list
Report Received Date
2024-08-02 00:00:00
Iyear
2024
Report Number
20240098
Supplemental Number
39859
Report Type
Original Final
Operator Id
31711
Name
Southern Star Central Gas Pipeline, Inc
Operator Street Address
4700 State Route 56; Box 20010
Operator City Name
Owensboro
Operator State Abbreviation
KY
Operator Postal Code
42301
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
37.015969
Location Longitude
-94.479926
Nrc Rpt Num
1403815
Additional Nrc Report Numbers
1403934
Commodity Released Type
Natural Gas
Unintentional Release
11800
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
No
Ignite Ind
No
Num Pub Evacuated
0
On Off Shore
Onshore
Onshore State Abbreviation
Mo
Onshore Postal Code
64804
Onshore City Name
Joplin
Onshore County Name
Newton
Designated Location
Not Applicable
Pipe Fac Name
Saginaw Compressor Station
Segment Name
132-04-001
Federal
No
Location Type
Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Regulator/metering Station Equipment And Piping
Item Involved
Regulator/control Valve
Installation Year
2018
Manufactured Year
2018
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Pressure Relief Valve Release
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
185
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
Yes
Mca Buildng Human Occupy Ind
Yes
Mca Paved Surface Freeway Ind
Yes
Est Cost Oper Paid
0
Est Cost Unintentional Release
23246
Est Cost Intentional Release
0
Est Cost Prop Damage
1200
Est Cost Emergency
5400
Est Cost Other
0
Gas Cost In Mcf
1.97
Prpty
29846
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
707
Gas Flow In Pipe In Mcf
5000
Mop Psig
718
Mop Cfr Section
192.619(A)(2)
Maop Established Date
1989-02-15 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Accident Identifier
Notification From Public
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Operational parameters were within limits and pipeline operations in this area were steady, no change had occurred to cause the event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Relief Valve Ind
Yes
Eq Additional Other Ind
Yes
Eq Additional Other Details
Loose Blow Down Ring Nut
Preparer Name
E*** G****
Preparer Title
Phmsa Compliance Engineer
Preparer Email
E*********@s***********.com
Preparer Telephone
2702810561
Preparer Fax
2708525016
Local Contact Name
C**** T*****
Local Contact Email
C***********@s***********.com
Local Contact Telephone
2703138424
Authorizer Name
C****** C****
Authorizer Title
Vp Chief Operations Officer
Authorizer Telephone
2708524626
Authorizer Email
C************@s***********.com
Narrative
On 7/5/2025 southern star central gas pipeline (sscgp) gas control was called at 3:40 am cdt about a possible gas leak and noticed a rapid pressure loss and flow changes at the saginaw compressor station. After initial review of the pressure drop it was determined at 4:07 am that the gas loss would be over the reportable threshold and the nrc was notified at 4:22 am. At 4:13 am, the on-site operator personnel determined it was a pressure relief valve (prv) activation that was the source of the pressure drop and shut in the prv at 4:14 am, no actual maop exceedance occurred. It was determined that the prv malfunction was due to a loose blowdown ring. The prv was repaired, tested and recertified with a set point of 715 psig and placed back in service on 7/5/2024 at 6:40 pm cdt.
Report Received Date | 2024-08-02 00:00:00 |
---|---|
Iyear | 2024 |
Report Number | 20240098 |
Supplemental Number | 39859 |
Report Type | Original Final |
Operator Id | 31711 PHMSA Enforcement |
Name | Southern Star Central Gas Pipeline, Inc |
Operator Street Address | 4700 State Route 56; Box 20010 |
Operator City Name | Owensboro |
Operator State Abbreviation | KY |
Operator Postal Code | 42301 |
Time Zone | Central |
Daylight Savings Ind | Yes |
Location Latitude | 37.015969 Google Maps OpenStreetMap |
Location Longitude | -94.479926 Google Maps OpenStreetMap |
Nrc Rpt Num | 1403815 NRC Report How to search |
Additional Nrc Report Numbers | 1403934 |
Commodity Released Type | Natural Gas |
Unintentional Release | 11800 |
Intentional Release | 0 |
Accompanying Liquid | 0 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Status When Identified | Normal Operation, Includes Pauses During Maintenance |
Shutdown Due Accident Ind | Yes |
Communication State Fed Ind | No |
Ignite Ind | No |
Num Pub Evacuated | 0 |
On Off Shore | Onshore |
Onshore State Abbreviation | Mo |
Onshore Postal Code | 64804 |
Onshore City Name | Joplin |
Onshore County Name | Newton |
Designated Location | Not Applicable |
Pipe Fac Name | Saginaw Compressor Station |
Segment Name | 132-04-001 |
Federal | No |
Location Type | Operator-Controlled Property |
Incident Area Type | Aboveground |
Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
Crossing | No |
Pipe Facility Type | Interstate |
System Part Involved | Onshore Regulator/metering Station Equipment And Piping |
Item Involved | Regulator/control Valve |
Installation Year | 2018 |
Manufactured Year | 2018 |
Material Involved | Carbon Steel |
Release Type | Other |
Release Type Details | Pressure Relief Valve Release |
Class Location Type | Class 1 Location |
Could Be Hca | No |
Pir Radius | 185 |
Heat Damage Ind | No |
Non Heat Damage Ind | No |
Did Occur In Mca Ind | Yes |
Mca Buildng Human Occupy Ind | Yes |
Mca Paved Surface Freeway Ind | Yes |
Est Cost Oper Paid | 0 |
Est Cost Unintentional Release | 23246 |
Est Cost Intentional Release | 0 |
Est Cost Prop Damage | 1200 |
Est Cost Emergency | 5400 |
Est Cost Other | 0 |
Gas Cost In Mcf | 1.97 |
Prpty | 29846 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Wildlife Impact Ind | No |
Accident Psig | 707 |
Gas Flow In Pipe In Mcf | 5000 |
Mop Psig | 718 |
Mop Cfr Section | 192.619(A)(2) View CFR 49 §192 |
Maop Established Date | 1989-02-15 00:00:00 |
Maop Reversal Flow Ind | No |
Accident Pressure | Pressure Did Not Exceed Maop |
Pressure Restriction Ind | No |
Gas Required Odorized Ind | No |
Pipeline Function | Transmission System |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | Yes |
Scada Conf Ind | Yes |
Accident Identifier | Notification From Public |
Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
Investigation Status Details | Operational parameters were within limits and pipeline operations in this area were steady, no change had occurred to cause the event. |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Equipment Failure |
Cause Details | Malfunction Of Control/relief Equipment |
Eq Failure Type | Malfunction Of Control/relief Equipment |
Relief Valve Ind | Yes |
Eq Additional Other Ind | Yes |
Eq Additional Other Details | Loose Blow Down Ring Nut |
Preparer Name | E*** G**** |
Preparer Title | Phmsa Compliance Engineer |
Preparer Email | E*********@s***********.com |
Preparer Telephone | 2702810561 |
Preparer Fax | 2708525016 |
Local Contact Name | C**** T***** |
Local Contact Email | C***********@s***********.com |
Local Contact Telephone | 2703138424 |
Authorizer Name | C****** C**** |
Authorizer Title | Vp Chief Operations Officer |
Authorizer Telephone | 2708524626 |
Authorizer Email | C************@s***********.com |
Narrative | On 7/5/2025 southern star central gas pipeline (sscgp) gas control was called at 3:40 am cdt about a possible gas leak and noticed a rapid pressure loss and flow changes at the saginaw compressor station. After initial review of the pressure drop it was determined at 4:07 am that the gas loss would be over the reportable threshold and the nrc was notified at 4:22 am. At 4:13 am, the on-site operator personnel determined it was a pressure relief valve (prv) activation that was the source of the pressure drop and shut in the prv at 4:14 am, no actual maop exceedance occurred. It was determined that the prv malfunction was due to a loose blowdown ring. The prv was repaired, tested and recertified with a set point of 715 psig and placed back in service on 7/5/2024 at 6:40 pm cdt. |