Incident details
Operator, cause, commodity and consequences with raw source fields.
GD incident on 2024-01-21 — MD
Operator
Baltimore Gas And Electric Company
Cause
Excavation Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2024-01-21 00:00 UTC
Report number
Location
MD, ANNE ARUNDEL
Narrative
On december 21, 2023 at 14:00, a third-party contractor struck a 4" plastic high pressure gas main on nsa property. The main was not shut off until 24:00, resulting in the release of 5900 mcf of natural gas into the atmosphere. The main was repaired and service was restored to customer on december 22nd. The one call center was notified prior to start of work and the gas main was marked within tolerance prior to excavation.
Detailed record list
Report Received Date
2024-01-21 00:00:00
Iyear
2023.0
Report Number
20240003.0
Supplemental Number
39095.0
Report Type
Original
Operator Id
1088
Name
Baltimore Gas And Electric Company
Operator Street Address
110 W Fayette St
Operator City Name
Baltimore
Operator State Abbreviation
MD
Operator Postal Code
21201.0
Time Zone
Eastern
Daylight Savings Ind
No
Location Street Address
9827 Love Rd.
Location City Name
Fort Meade
Location County Name
Anne Arundel
Location State Abbreviation
MD
Location Postal Code
20755.0
Location Latitude
39.107568
Location Longitude
-76.762529
Flow Cont Squeeze Off Ind
Yes
Nrc Rpt Num
1387317.0
Additional Nrc Report Numbers
1387444.0
Commodity Released Type
Natural Gas
Unintentional Release
5900.0
Intentional Release
0.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Num Pub Evacuated
0.0
Communication State Fed Ind
Yes
Party Initiated Communication
Local/state/federal Emergency Responder
Federal
Yes
Location Type
Private Property
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
36.0
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Investor Owned
System Part Involved
Main
Installation Year
2012.0
Pipe Diameter
4.0
Pipe Specification
Astm D2513
Pipe Manufacturer
Chevron Phillips Performance Pipe
Material Involved
Plastic
Plastic Type
Polyethylene (Pe)
Plastic Sdr
11
Material Pe Pipe Code
4710
Release Type
Mechanical Puncture
Puncture Axial
2.0
Puncture Circum
4.0
Class Location Type
Class 4 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
0.0
Est Cost Emergency
4000.0
Est Cost Other
0.0
Gas Cost In Mcf
2.29
Est Cost Unintentional Release
13511.0
Est Cost Intentional Release
0.0
Prpty
17511.0
Commercial Affected
10.0
Industrial Affected
0.0
Residences Affected
0.0
Num Persons Hosp Not Ovnght
0.0
Num Injured Treated By Emt
0.0
Num Resident Building Affctd
0.0
Num Business Building Affctd
10.0
Accident Psig
92.0
Normal Psig
92.0
Mop Psig
99.0
Mop Cfr Section
192.619(A)(2)
Maop Established Date
2012-09-28 00:00:00
Accident Pressure
Pressure Did Not Exceed Maop
Gas Odorized System Type
Injection Pump
Gas Odorized Lvl Not Msrd Ind
Yes
Scada In Place Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
State Law Exempt Ind
No
Notify Cga Dirt
No
Federal Land Row Ind
Yes
Joint Trench Ind
No
Cross Bore Ind
No
Depth Of Grade
> 36�
Excavator Type
Contractor
Excavator Equipment
Backhoe/trackhoe
Work Performed
Street Light
One Call Notified Ind
Yes
One Call Ticket Num
23898792.0
One Call Center Name
Miss Utility Of Maryland
White Lined Ind
Unknown
Locator Type
Contract Locator
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
24.0
Root Cause Category
Excavation Issue
Root Cause Type
Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name
J*** W***********
Preparer Title
Manager - Gas Engineering And Standards
Preparer Email
J*******************@b**.com
Preparer Telephone
410-598-1601
Authorizer Name
R***** R**
Authorizer Title
Sr. Manager Gas Engineering And Asset Performance
Authorizer Telephone
302-593-3732
Authorizer Email
R*********@d*******.com
Narrative
On december 21, 2023 at 14:00, a third-party contractor struck a 4" plastic high pressure gas main on nsa property. The main was not shut off until 24:00, resulting in the release of 5900 mcf of natural gas into the atmosphere. The main was repaired and service was restored to customer on december 22nd. The one call center was notified prior to start of work and the gas main was marked within tolerance prior to excavation.
Report Received Date | 2024-01-21 00:00:00 |
---|---|
Iyear | 2023.0 |
Report Number | 20240003.0 |
Supplemental Number | 39095.0 |
Report Type | Original |
Operator Id | 1088 PHMSA Enforcement |
Name | Baltimore Gas And Electric Company |
Operator Street Address | 110 W Fayette St |
Operator City Name | Baltimore |
Operator State Abbreviation | MD |
Operator Postal Code | 21201.0 |
Time Zone | Eastern |
Daylight Savings Ind | No |
Location Street Address | 9827 Love Rd. |
Location City Name | Fort Meade |
Location County Name | Anne Arundel |
Location State Abbreviation | MD |
Location Postal Code | 20755.0 |
Location Latitude | 39.107568 Google Maps OpenStreetMap |
Location Longitude | -76.762529 Google Maps OpenStreetMap |
Flow Cont Squeeze Off Ind | Yes |
Nrc Rpt Num | 1387317.0 NRC Report How to search |
Additional Nrc Report Numbers | 1387444.0 |
Commodity Released Type | Natural Gas |
Unintentional Release | 5900.0 |
Intentional Release | 0.0 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Ignite Ind | No |
Num Pub Evacuated | 0.0 |
Communication State Fed Ind | Yes |
Party Initiated Communication | Local/state/federal Emergency Responder |
Federal | Yes |
Location Type | Private Property |
Incident Area Type | Underground |
Incident Area Subtype | Exposed Due To Excavation |
Depth Of Cover | 36.0 |
Other Underground Facilities | No |
Crossing | No |
Pipe Facility Type | Investor Owned |
System Part Involved | Main |
Installation Year | 2012.0 |
Pipe Diameter | 4.0 |
Pipe Specification | Astm D2513 |
Pipe Manufacturer | Chevron Phillips Performance Pipe |
Material Involved | Plastic |
Plastic Type | Polyethylene (Pe) |
Plastic Sdr | 11 |
Material Pe Pipe Code | 4710 |
Release Type | Mechanical Puncture |
Puncture Axial | 2.0 |
Puncture Circum | 4.0 |
Class Location Type | Class 4 Location |
Est Cost Oper Paid | 0.0 |
Est Cost Prop Damage | 0.0 |
Est Cost Emergency | 4000.0 |
Est Cost Other | 0.0 |
Gas Cost In Mcf | 2.29 |
Est Cost Unintentional Release | 13511.0 |
Est Cost Intentional Release | 0.0 |
Prpty | 17511.0 |
Commercial Affected | 10.0 |
Industrial Affected | 0.0 |
Residences Affected | 0.0 |
Num Persons Hosp Not Ovnght | 0.0 |
Num Injured Treated By Emt | 0.0 |
Num Resident Building Affctd | 0.0 |
Num Business Building Affctd | 10.0 |
Accident Psig | 92.0 |
Normal Psig | 92.0 |
Mop Psig | 99.0 |
Mop Cfr Section | 192.619(A)(2) View CFR 49 §192 |
Maop Established Date | 2012-09-28 00:00:00 |
Accident Pressure | Pressure Did Not Exceed Maop |
Gas Odorized System Type | Injection Pump |
Gas Odorized Lvl Not Msrd Ind | Yes |
Scada In Place Ind | No |
Accident Identifier | Notification From Third Party That Caused The Incident |
Investigation Status | No, the facility was not monitored by a controller(s) at the time of the incident |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Excavation Damage |
Cause Details | Excavation Damage By Third Party |
Ex Party Type | Excavation Damage By Third Party |
Prior Notification Ind | Yes |
One Call System Ind | Yes |
State Law Exempt Ind | No |
Notify Cga Dirt | No |
Federal Land Row Ind | Yes |
Joint Trench Ind | No |
Cross Bore Ind | No |
Depth Of Grade | > 36� |
Excavator Type | Contractor |
Excavator Equipment | Backhoe/trackhoe |
Work Performed | Street Light |
One Call Notified Ind | Yes |
One Call Ticket Num | 23898792.0 |
One Call Center Name | Miss Utility Of Maryland |
White Lined Ind | Unknown |
Locator Type | Contract Locator |
Visible Marks | Yes |
Service Interruption | Yes |
Service Interruption Hours | 24.0 |
Root Cause Category | Excavation Issue |
Root Cause Type | Excavator Failed To Maintain Clearance After Verifying Marks |
Preparer Name | J*** W*********** |
Preparer Title | Manager - Gas Engineering And Standards |
Preparer Email | J*******************@b**.com |
Preparer Telephone | 410-598-1601 |
Authorizer Name | R***** R** |
Authorizer Title | Sr. Manager Gas Engineering And Asset Performance |
Authorizer Telephone | 302-593-3732 |
Authorizer Email | R*********@d*******.com |
Narrative | On december 21, 2023 at 14:00, a third-party contractor struck a 4" plastic high pressure gas main on nsa property. The main was not shut off until 24:00, resulting in the release of 5900 mcf of natural gas into the atmosphere. The main was repaired and service was restored to customer on december 22nd. The one call center was notified prior to start of work and the gas main was marked within tolerance prior to excavation. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA