GD incident on 2024-01-19 — FL
Operator
Peoples Gas System Inc
Cause
Pipe, Weld, Or Joint Failure
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$277,633
Incident datetime
2024-01-19 00:00 UTC
Report number
Location
FL, ST JOHNS COUNTY
Narrative
On december 18, 2023, at approximately 09:02 hours, pgs was notified by the public of a gas odor at 3264 longleaf pine parkway, st. Johns county florida. Responding crews were dispatched and upon arrival, confirmed there was an active leak. The pipeline was excavated and squeezed off, stopping the escaping gas to make safe at 15:45. An assessment was made of the scene, including the ability to safely manage the site. An evaluation of options for the one-way feed pe pipeline concluded that it was safer to take the line out of service to safely install a bypass. As a result, 1,534 customers were out of service. The repair was completed, and restoration of the affected customers was completed. Pgs crews identified the source of the leak as a plastic fusion of the 6-inch main. The fusion was cut out and sent to a testing and analysis lab to identify the cause. The testing facility identified the plastic fusion as a failed weld with two potential contributors, #1 - surface contamination of the fusion interface prior to joining (e.G., dust from surrounding environment) and/or #2 - removal of the joining force shortly after the bead was pushed out (e.G., inadvertent switching of butt-fusion machine's hydraulic pressure toggle lever) prematurely. Pgs has implemented their procedure for a fusion investigation of several adjacent butt-fusions to confirm proper procedures were followed for a safe installation or determine if additional fusions need to be replaced. This exercise is expected to take several months for excavation, remove/replacement and testing of the sample fusions.
Detailed record list
Report Received Date
2024-01-19 00:00:00
Iyear
2023.0
Report Number
20240002.0
Supplemental Number
40003.0
Report Type
Supplemental Final
Operator Id
15348
Name
Peoples Gas System Inc
Operator Street Address
Po Box 2562
Operator City Name
Tampa
Operator State Abbreviation
FL
Operator Postal Code
33601.0
Time Zone
Eastern
Daylight Savings Ind
No
Location Street Address
3264 Longleaf Pine Pkwy
Location City Name
St Johns
Location County Name
St Johns County
Location State Abbreviation
FL
Location Postal Code
32259.0
Location Latitude
30.08929
Location Longitude
-81.5799
Flow Cont Squeeze Off Ind
Yes
Nrc Rpt Num
1387045.0
Additional Nrc Report Numbers
1387186.0
Commodity Released Type
Natural Gas
Unintentional Release
130.0
Intentional Release
0.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Num Pub Evacuated
0.0
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Federal
No
Location Type
Public Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
168.0
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Investor Owned
System Part Involved
Main
Installation Year
2015.0
Manufactured Year
2015.0
Pipe Diameter
6.0
Pipe Specification
Astm D2513
Pipe Manufacturer
Performance Pipe
Material Involved
Plastic
Plastic Type
Polyethylene (Pe)
Plastic Sdr
11.5
Material Pe Pipe Code
2406
Release Type
Leak
Leak Type
Connection Failure
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
277633.0
Est Cost Emergency
0.0
Est Cost Other
0.0
Gas Cost In Mcf
10.0
Est Cost Unintentional Release
1300.0
Est Cost Intentional Release
0.0
Prpty
278933.0
Commercial Affected
84.0
Industrial Affected
0.0
Residences Affected
1450.0
Num Persons Hosp Not Ovnght
0.0
Num Injured Treated By Emt
0.0
Num Resident Building Affctd
0.0
Num Business Building Affctd
0.0
Accident Psig
50.0
Normal Psig
50.0
Mop Psig
60.0
Mop Cfr Section
192.619(A)(2)
Maop Established Date
2015-09-02 00:00:00
Accident Pressure
Pressure Did Not Exceed Maop
Gas Odorized System Type
Injection Pump
Gas Odorized Lvl Not Msrd Ind
Yes
Scada In Place Ind
No
Accident Identifier
Notification From Public
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Periodic pressure check during routine maintenance.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Pipe, Weld, Or Joint Failure
Cause Details
Fusion Joint
Pwjf Failure Type
Fusion Joint
Plastic Joint Subtype
Butt, Heat Fusion
Fpw Installed Year
2015
Fpw First Plastic Type
Polyethylene (Pe)
Fpw Second Plastic Type
Polyethylene (Pe)
Additional Lack Fusion Ind
Yes
Result Construction Ind
Yes
Result Construction Subtype
Procedure Not Followed
Hydrotest Conducted Ind
No
Pwf Construction Ind
Yes
Preparer Name
I***** J****
Preparer Title
Compliance Analyst
Preparer Email
I******@t*********.com
Preparer Telephone
(407)-420-6617
Local Contact Name
J**** W**** J**
Local Contact Email
J********@t*********.com
Local Contact Telephone
(904)-219-5163
Authorizer Name
R****** H*****
Authorizer Title
Manager Pipeline Safety Compliance
Authorizer Telephone
407-420-6667
Authorizer Email
R******@t*********.com
Narrative
On december 18, 2023, at approximately 09:02 hours, pgs was notified by the public of a gas odor at 3264 longleaf pine parkway, st. Johns county florida. Responding crews were dispatched and upon arrival, confirmed there was an active leak. The pipeline was excavated and squeezed off, stopping the escaping gas to make safe at 15:45. An assessment was made of the scene, including the ability to safely manage the site. An evaluation of options for the one-way feed pe pipeline concluded that it was safer to take the line out of service to safely install a bypass. As a result, 1,534 customers were out of service. The repair was completed, and restoration of the affected customers was completed. Pgs crews identified the source of the leak as a plastic fusion of the 6-inch main. The fusion was cut out and sent to a testing and analysis lab to identify the cause. The testing facility identified the plastic fusion as a failed weld with two potential contributors, #1 - surface contamination of the fusion interface prior to joining (e.G., dust from surrounding environment) and/or #2 - removal of the joining force shortly after the bead was pushed out (e.G., inadvertent switching of butt-fusion machine's hydraulic pressure toggle lever) prematurely. Pgs has implemented their procedure for a fusion investigation of several adjacent butt-fusions to confirm proper procedures were followed for a safe installation or determine if additional fusions need to be replaced. This exercise is expected to take several months for excavation, remove/replacement and testing of the sample fusions.
Report Received Date | 2024-01-19 00:00:00 |
---|---|
Iyear | 2023.0 |
Report Number | 20240002.0 |
Supplemental Number | 40003.0 |
Report Type | Supplemental Final |
Operator Id | 15348 PHMSA Enforcement |
Name | Peoples Gas System Inc |
Operator Street Address | Po Box 2562 |
Operator City Name | Tampa |
Operator State Abbreviation | FL |
Operator Postal Code | 33601.0 |
Time Zone | Eastern |
Daylight Savings Ind | No |
Location Street Address | 3264 Longleaf Pine Pkwy |
Location City Name | St Johns |
Location County Name | St Johns County |
Location State Abbreviation | FL |
Location Postal Code | 32259.0 |
Location Latitude | 30.08929 Google Maps OpenStreetMap |
Location Longitude | -81.5799 Google Maps OpenStreetMap |
Flow Cont Squeeze Off Ind | Yes |
Nrc Rpt Num | 1387045.0 NRC Report How to search |
Additional Nrc Report Numbers | 1387186.0 |
Commodity Released Type | Natural Gas |
Unintentional Release | 130.0 |
Intentional Release | 0.0 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Ignite Ind | No |
Num Pub Evacuated | 0.0 |
Communication State Fed Ind | Yes |
Party Initiated Communication | Operator |
Federal | No |
Location Type | Public Property |
Incident Area Type | Underground |
Incident Area Subtype | Under Soil |
Depth Of Cover | 168.0 |
Other Underground Facilities | No |
Crossing | No |
Pipe Facility Type | Investor Owned |
System Part Involved | Main |
Installation Year | 2015.0 |
Manufactured Year | 2015.0 |
Pipe Diameter | 6.0 |
Pipe Specification | Astm D2513 |
Pipe Manufacturer | Performance Pipe |
Material Involved | Plastic |
Plastic Type | Polyethylene (Pe) |
Plastic Sdr | 11.5 |
Material Pe Pipe Code | 2406 |
Release Type | Leak |
Leak Type | Connection Failure |
Class Location Type | Class 3 Location |
Est Cost Oper Paid | 0.0 |
Est Cost Prop Damage | 277633.0 |
Est Cost Emergency | 0.0 |
Est Cost Other | 0.0 |
Gas Cost In Mcf | 10.0 |
Est Cost Unintentional Release | 1300.0 |
Est Cost Intentional Release | 0.0 |
Prpty | 278933.0 |
Commercial Affected | 84.0 |
Industrial Affected | 0.0 |
Residences Affected | 1450.0 |
Num Persons Hosp Not Ovnght | 0.0 |
Num Injured Treated By Emt | 0.0 |
Num Resident Building Affctd | 0.0 |
Num Business Building Affctd | 0.0 |
Accident Psig | 50.0 |
Normal Psig | 50.0 |
Mop Psig | 60.0 |
Mop Cfr Section | 192.619(A)(2) View CFR 49 §192 |
Maop Established Date | 2015-09-02 00:00:00 |
Accident Pressure | Pressure Did Not Exceed Maop |
Gas Odorized System Type | Injection Pump |
Gas Odorized Lvl Not Msrd Ind | Yes |
Scada In Place Ind | No |
Accident Identifier | Notification From Public |
Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
Investigation Status Details | Periodic pressure check during routine maintenance. |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Pipe, Weld, Or Joint Failure |
Cause Details | Fusion Joint |
Pwjf Failure Type | Fusion Joint |
Plastic Joint Subtype | Butt, Heat Fusion |
Fpw Installed Year | 2015 |
Fpw First Plastic Type | Polyethylene (Pe) |
Fpw Second Plastic Type | Polyethylene (Pe) |
Additional Lack Fusion Ind | Yes |
Result Construction Ind | Yes |
Result Construction Subtype | Procedure Not Followed |
Hydrotest Conducted Ind | No |
Pwf Construction Ind | Yes |
Preparer Name | I***** J**** |
Preparer Title | Compliance Analyst |
Preparer Email | I******@t*********.com |
Preparer Telephone | (407)-420-6617 |
Local Contact Name | J**** W**** J** |
Local Contact Email | J********@t*********.com |
Local Contact Telephone | (904)-219-5163 |
Authorizer Name | R****** H***** |
Authorizer Title | Manager Pipeline Safety Compliance |
Authorizer Telephone | 407-420-6667 |
Authorizer Email | R******@t*********.com |
Narrative | On december 18, 2023, at approximately 09:02 hours, pgs was notified by the public of a gas odor at 3264 longleaf pine parkway, st. Johns county florida. Responding crews were dispatched and upon arrival, confirmed there was an active leak. The pipeline was excavated and squeezed off, stopping the escaping gas to make safe at 15:45. An assessment was made of the scene, including the ability to safely manage the site. An evaluation of options for the one-way feed pe pipeline concluded that it was safer to take the line out of service to safely install a bypass. As a result, 1,534 customers were out of service. The repair was completed, and restoration of the affected customers was completed. Pgs crews identified the source of the leak as a plastic fusion of the 6-inch main. The fusion was cut out and sent to a testing and analysis lab to identify the cause. The testing facility identified the plastic fusion as a failed weld with two potential contributors, #1 - surface contamination of the fusion interface prior to joining (e.G., dust from surrounding environment) and/or #2 - removal of the joining force shortly after the bead was pushed out (e.G., inadvertent switching of butt-fusion machine's hydraulic pressure toggle lever) prematurely. Pgs has implemented their procedure for a fusion investigation of several adjacent butt-fusions to confirm proper procedures were followed for a safe installation or determine if additional fusions need to be replaced. This exercise is expected to take several months for excavation, remove/replacement and testing of the sample fusions. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA