Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2023-12-13 — TX
Operator
Enterprise Products Operating Llc
Cause
Corrosion Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$870,000
Incident datetime
2023-12-13 00:00 UTC
Report number
Location
TX
Narrative
On november 15, 2023, at 14:00 central time a small pin hole leak was discovered on a 1/2 inch grease line attached to mainline block valve #8 on the aegis pipeline near vinton, louisiana by field personnel. Enterprise continued monitoring the leak site to determine the best possible repair method and the event was determined to be reportable at 18:20 central time on 11/17/2023 due to the anticipated repair cost exceeding $50k resulting in immediate notification to nrc. The upstream valve was closed at 06:12 am 22nd november 2023 and the line continued to be in-service until the product was removed and the downstream valve was closed at 20:57 pm on 22nd november 2023. The damaged 1/2 inch grease line was cut-out and replaced and returned to service on november 26, 2023, at 15:53 pm.
Detailed record list
Report Received Date
2023-12-13 00:00:00
Iyear
2023
Report Number
20230297
Supplemental Number
38953
Report Type
Original Final
Operator Id
31618
Name
Enterprise Products Operating Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
30.034294
Location Longitude
-93.733242
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Ethane
Unintentional Release Bbls
4.6
Intentional Release Bbls
114
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
No
Nrc Rpt Num
1384601
Additional Nrc Report Numbers
1384716
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Type Ind
Remotely Controlled
Downstream Action Taken
Valve Closure
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Aegis Beaumont To Lake Charles
Segment Name
24600
Onshore State Abbreviation
La
Onshore Postal Code
70668
Onshore City Name
Vinton
Onshore County Name
Cameron
Designated Location
Survey Station No.
Designated Name
1174+16
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Transition Area
Incident Area Subtype
Other
Incident Area Details
Air/water Interface
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Tubing
Tubing Material
Carbon Steel
Tubing Type
Rigid
Installation Year
2014
Manufactured Year
2014
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Commercially Nav Ind
Yes
Commercially Nav Yes No
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
100
Est Cost Prop Damage
870000
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
870100
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
1161
Mop Psig
1480
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2015-08-21 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
47520
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Localized Pitting
Galvanic Corrosion Ind
Yes
Field Exam Basis Ind
Yes
Underground Location
No
Externally Coated
Yes
Prior Damage
Yes
Preparer Name
U*** A******
Preparer Title
Engineer - Pipeline Compliance
Preparer Email
U********@e****.com
Preparer Telephone
(281) 386-0352
Prepared Date
2023-12-13 00:00:00
Local Contact Name
U*** A******
Local Contact Email
U********@e****.com
Local Contact Telephone
(281) 386-0352
Authorizer Name
N*** T*****
Authorizer Telephone
(713) 381-2493
Authorizer Title
Senior Manager - Compliance
Authorizer Email
N*******@e****.com
Narrative
On november 15, 2023, at 14:00 central time a small pin hole leak was discovered on a 1/2 inch grease line attached to mainline block valve #8 on the aegis pipeline near vinton, louisiana by field personnel. Enterprise continued monitoring the leak site to determine the best possible repair method and the event was determined to be reportable at 18:20 central time on 11/17/2023 due to the anticipated repair cost exceeding $50k resulting in immediate notification to nrc. The upstream valve was closed at 06:12 am 22nd november 2023 and the line continued to be in-service until the product was removed and the downstream valve was closed at 20:57 pm on 22nd november 2023. The damaged 1/2 inch grease line was cut-out and replaced and returned to service on november 26, 2023, at 15:53 pm.
Report Received Date | 2023-12-13 00:00:00 |
---|---|
Iyear | 2023 |
Report Number | 20230297 |
Supplemental Number | 38953 |
Report Type | Original Final |
Operator Id | 31618 PHMSA Enforcement |
Name | Enterprise Products Operating Llc |
Operator Street Address | 1100 Louisiana Street |
Operator City Name | Houston |
Operator State Abbreviation | TX |
Operator Postal Code | 77002 |
Time Zone | Central |
Daylight Savings Ind | Yes |
Location Latitude | 30.034294 Google Maps OpenStreetMap |
Location Longitude | -93.733242 Google Maps OpenStreetMap |
Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
Commodity Subtype | Other Hvl |
Commodity Details | Ethane |
Unintentional Release Bbls | 4.6 |
Intentional Release Bbls | 114 |
Recovered Bbls | 0 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Local Operating Personnel, Including Contractors |
Operator Type | Operator Employee |
System Part Involved | Onshore Pipeline, Including Valve Sites |
On Off Shore | Onshore |
Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
Shutdown Due Accident Ind | Yes |
Communication State Fed Ind | No |
Nrc Rpt Num | 1384601 NRC Report How to search |
Additional Nrc Report Numbers | 1384716 |
Ignite Ind | No |
Upstream Action Taken | Valve Closure |
Upstream Valve Type Ind | Remotely Controlled |
Downstream Action Taken | Valve Closure |
Downstream Valve Type Ind | Manual |
Num Pub Evacuated | 0 |
Pipe Fac Name | Aegis Beaumont To Lake Charles |
Segment Name | 24600 |
Onshore State Abbreviation | La |
Onshore Postal Code | 70668 |
Onshore City Name | Vinton |
Onshore County Name | Cameron |
Designated Location | Survey Station No. |
Designated Name | 1174+16 |
Federal | No |
Location Type | Pipeline Right-Of-Way |
Incident Area Type | Transition Area |
Incident Area Subtype | Other |
Incident Area Details | Air/water Interface |
Crossing | No |
Pipe Facility Type | Interstate |
Item Involved | Tubing |
Tubing Material | Carbon Steel |
Tubing Type | Rigid |
Installation Year | 2014 |
Manufactured Year | 2014 |
Material Involved | Carbon Steel |
Release Type | Leak |
Leak Type | Pinhole |
Wildlife Impact Ind | No |
Soil Contamination | No |
Long Term Assessment | No |
Remediation Ind | No |
Water Contam Ind | No |
Could Be Hca | Yes |
Commodity Reached Hca | Yes |
Commercially Nav Ind | Yes |
Commercially Nav Yes No | Yes |
Usa Ecological Ind | Yes |
Usa Ecological Yes No | Yes |
Est Cost Oper Paid | 0 |
Est Cost Gas Released | 100 |
Est Cost Prop Damage | 870000 |
Est Cost Emergency | 0 |
Est Cost Environmental | 0 |
Est Cost Other | 0 |
Prpty | 870100 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 1161 |
Mop Psig | 1480 |
Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
Maop Established Date | 2015-08-21 00:00:00 |
Maop Reversal Flow Ind | Bi-Directional |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Length Segment Isolated | 47520 |
Internal Inspection Ind | Yes |
Operation Complications Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Cpm In Place Ind | Yes |
Cpm Operating Ind | Yes |
Cpm Functional Ind | Yes |
Cpm Detection Ind | No |
Cpm Conf Ind | No |
Investigation Status | Yes, specify investigation result(s): (select all that apply) |
Invest No Control Room Ind | Yes |
Invest No Controller Ind | Yes |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Corrosion Failure |
Cause Details | External Corrosion |
Internal External | External Corrosion |
Visual Exam Results | Localized Pitting |
Galvanic Corrosion Ind | Yes |
Field Exam Basis Ind | Yes |
Underground Location | No |
Externally Coated | Yes |
Prior Damage | Yes |
Preparer Name | U*** A****** |
Preparer Title | Engineer - Pipeline Compliance |
Preparer Email | U********@e****.com |
Preparer Telephone | (281) 386-0352 |
Prepared Date | 2023-12-13 00:00:00 |
Local Contact Name | U*** A****** |
Local Contact Email | U********@e****.com |
Local Contact Telephone | (281) 386-0352 |
Authorizer Name | N*** T***** |
Authorizer Telephone | (713) 381-2493 |
Authorizer Title | Senior Manager - Compliance |
Authorizer Email | N*******@e****.com |
Narrative | On november 15, 2023, at 14:00 central time a small pin hole leak was discovered on a 1/2 inch grease line attached to mainline block valve #8 on the aegis pipeline near vinton, louisiana by field personnel. Enterprise continued monitoring the leak site to determine the best possible repair method and the event was determined to be reportable at 18:20 central time on 11/17/2023 due to the anticipated repair cost exceeding $50k resulting in immediate notification to nrc. The upstream valve was closed at 06:12 am 22nd november 2023 and the line continued to be in-service until the product was removed and the downstream valve was closed at 20:57 pm on 22nd november 2023. The damaged 1/2 inch grease line was cut-out and replaced and returned to service on november 26, 2023, at 15:53 pm. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA