HL incident on 2023-11-15 — OK

Operator
Magellan Pipeline Company, Lp
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$5,000
Incident datetime
2023-11-15 00:00 UTC
Report number
Location
OK
Narrative
At 06:00 on october 16th, 2023 operations personnel arriving at fargo terminal observed product leaking from a corrosion coupon holder on the incoming cenex line. At approximately 06:02 operations control shut down the incoming pipeline and at 6:05 personnel closed the 2" valve, isolating the coupon holder. Clean-up activities were initiated. Further investigation found the o-ring between the cap of the coupon and the body of the holder had some pitting. To prevent re-occurrence the coupon holder was removed, replaced with a blind, and sent to the manufacturer for inspection and rebuild.
Detailed record list
Report Received Date
2023-11-15 00:00:00
Iyear
2023
Report Number
20230273
Supplemental Number
38807
Report Type
Original Final
Operator Id
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
10
Recovered Bbls
9
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Fargo Terminal
Segment Name
Fac Id 218
Onshore State Abbreviation
Nd
Onshore Postal Code
58078
Onshore City Name
Fargo
Onshore County Name
Cass
Designated Location
Milepost
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Other
Item Involved Details
Corrosion Coupon
Installation Year
1991
Manufactured Year
1991
Material Involved
Material Other Than Carbon Steel
Material Details
Viton O-Ring
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
1470
Est Cost Prop Damage
5000
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
6470
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
41
Mop Psig
1140
Mop Cfr Section
Four Hour Test Or Operation �195.406(A)(5)
Maop Established Date
1971-01-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Manifold/piping is monitored locally during routine inspections.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
O-Ring
Eq Additional Other Ind
Yes
Eq Additional Other Details
Pitting
Preparer Name
C******* R******
Preparer Title
Strategic Data Engineer
Preparer Email
C***************@o****.com
Preparer Telephone
9185747065
Prepared Date
2023-11-13 00:00:00
Authorizer Name
T***** K***
Authorizer Telephone
9185747191
Authorizer Title
Supv. Integrity Mgmt And Regulatory Compliance
Authorizer Email
T**********@o****.com
Narrative
At 06:00 on october 16th, 2023 operations personnel arriving at fargo terminal observed product leaking from a corrosion coupon holder on the incoming cenex line. At approximately 06:02 operations control shut down the incoming pipeline and at 6:05 personnel closed the 2" valve, isolating the coupon holder. Clean-up activities were initiated. Further investigation found the o-ring between the cap of the coupon and the body of the holder had some pitting. To prevent re-occurrence the coupon holder was removed, replaced with a blind, and sent to the manufacturer for inspection and rebuild.
Report Received Date 2023-11-15 00:00:00
Iyear 2023
Report Number 20230273
Supplemental Number 38807
Report Type Original Final
Operator Id 22610 PHMSA Enforcement
Name Magellan Pipeline Company, Lp
Operator Street Address 100 West 5th Street
Operator City Name Tulsa
Operator State Abbreviation OK
Operator Postal Code 74103
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 46.878641 Google Maps OpenStreetMap
Location Longitude -96.881266 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Gasoline (Non-Ethanol)
Unintentional Release Bbls 10
Recovered Bbls 9
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Communication State Fed Ind Yes
Party Initiated Communication Operator
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Notify Qualified Indiv Ind Yes
Oil Spill Removal Org Ind No
Num Pub Evacuated 0
Pipe Fac Name Fargo Terminal
Segment Name Fac Id 218
Onshore State Abbreviation Nd
Onshore Postal Code 58078
Onshore City Name Fargo
Onshore County Name Cass
Designated Location Milepost
Designated Name 0
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Other
Item Involved Details Corrosion Coupon
Installation Year 1991
Manufactured Year 1991
Material Involved Material Other Than Carbon Steel
Material Details Viton O-Ring
Release Type Leak
Leak Type Seal Or Packing
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Usa Drinking Ind Yes
Usa Drinking Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 1470
Est Cost Prop Damage 5000
Est Cost Emergency 0
Est Cost Environmental 0
Est Cost Other 0
Prpty 6470
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 41
Mop Psig 1140
Mop Cfr Section Four Hour Test Or Operation �195.406(A)(5) View CFR 49 §192
Maop Established Date 1971-01-01 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Manifold/piping is monitored locally during routine inspections.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Non-Threaded Connection Failure
Eq Failure Type Non-Threaded Connection Failure
Other Non Threaded Ind O-Ring
Eq Additional Other Ind Yes
Eq Additional Other Details Pitting
Preparer Name C******* R******
Preparer Title Strategic Data Engineer
Preparer Email C***************@o****.com
Preparer Telephone 9185747065
Prepared Date 2023-11-13 00:00:00
Authorizer Name T***** K***
Authorizer Telephone 9185747191
Authorizer Title Supv. Integrity Mgmt And Regulatory Compliance
Authorizer Email T**********@o****.com
Narrative At 06:00 on october 16th, 2023 operations personnel arriving at fargo terminal observed product leaking from a corrosion coupon holder on the incoming cenex line. At approximately 06:02 operations control shut down the incoming pipeline and at 6:05 personnel closed the 2" valve, isolating the coupon holder. Clean-up activities were initiated. Further investigation found the o-ring between the cap of the coupon and the body of the holder had some pitting. To prevent re-occurrence the coupon holder was removed, replaced with a blind, and sent to the manufacturer for inspection and rebuild.

All rights reserved. Copyright © by ClearPHMSA