Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2023-11-06 — CA
Operator
Crimson Pipeline L.p.
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$150,000
Incident datetime
2023-11-06 00:00 UTC
Report number
Location
CA
Narrative
Control center received call from third party citizen at the location where they observed crude oil coming from the ground. The citizen called our emergency number and spoke to our control center. Our control center called the area supervisor who routed the operator in the area to the suspected leak site. Once the operator was on scene, he notified supervision that there was crude oil in the area of our row where our pipe is located. The upstream and downstream valves were closed and locked and tagged out. Local osro was notified and responded for the cleanup.
Detailed record list
Report Received Date
2023-11-06 00:00:00
Iyear
2023
Report Number
20230263
Supplemental Number
38879
Report Type
Supplemental Final
Operator Id
32103
Name
Crimson Pipeline L.p.
Operator Street Address
1900 Main Street Suite #600
Operator City Name
Irvine
Operator State Abbreviation
CA
Operator Postal Code
92614
Time Zone
Pacific
Daylight Savings Ind
Yes
Location Latitude
35.52774
Location Longitude
-119.5668
Commodity Released Type
Crude Oil
Unintentional Release Bbls
34
Recovered Bbls
34
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Nrc Rpt Num
1377538
Additional Nrc Report Numbers
1377575
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Type Ind
Manual
Downstream Action Taken
Valve Closure
Downstream Valve Type Ind
Manual
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
Yes
Osro Arrived On Site Dt
8/28/2023 18:37
Num Pub Evacuated
0
Pipe Fac Name
Cross Valley Between Rio Bravo And Carneras, Bv9
Segment Name
Csfm 0421
Onshore State Abbreviation
Ca
Onshore Postal Code
93206
Onshore City Name
Buttonwillow
Onshore County Name
Kern
Designated Location
Milepost
Designated Name
1.2
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
78
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
16
Pipe Wall Thickness
0.375
Pipe Smys
60000
Pipe Specification
Unknown
Pipe Seam Type
Seamless
Pipe Manufacturer
Unknown
Pipe Coating Type
Other
Pipe Coating Details
Insulated Polyethylene Coating
Coating Applied Ind
Unknown
Installation Year
1982
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
150000
Est Cost Emergency
230000
Est Cost Environmental
0
Est Cost Other
0
Prpty
380000
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
277
Mop Psig
945
Mop Cfr Section
Other
Mop Cfr Section Details
Pump Discharge Set Point.
Maop Established Date
1989-02-24 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
28000
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Localized Pitting
Atmosphere Corrosion Ind
Yes
Other Corrosion Ind
Yes
Corrosion Type Details
The External Corrosion Experienced On The 0421 Line Is Due To Water Collecting Under The Insulated Coating.
Field Exam Basis Ind
Yes
Underground Location
Yes
Under Cathodic Protection Ind
Yes
Cathodic Pro Start Year
2020
Shielding Evident
Yes
Cathodic Survey Type
Yes
Cp Annual Survey Ind
Yes
Cp Annual Survey Year
2022
Prior Damage
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Ultrasonic Ind
Yes
Axial Recent Year
2021
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Metal Loss
Axial Rcnt Atnd Dtct Metal
High Resolution
Ultrasonic Recent Year
2023
Ultrasonic Rcnt Propul Method
Free Swimming
Ultrasonic Rcnt Attuned
Wall Measurement
Utra Rcnt Att Metl Resolution
Standard Resolution
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
1989
Hydrtst Most Rcnt Pressure
1476
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Extrnl Cor Stray Current Ind
Yes
Preparer Name
N***** C******
Preparer Title
Regulatory Coordinator
Preparer Email
N*******@c********.com
Preparer Telephone
5627545046
Prepared Date
2023-11-30 00:00:00
Local Contact Name
N***** C******
Local Contact Email
N*******@c********.com
Local Contact Telephone
5627545046
Authorizer Name
M**** K*******
Authorizer Telephone
5622854137
Authorizer Title
President
Authorizer Email
M********@c********.com
Narrative
Control center received call from third party citizen at the location where they observed crude oil coming from the ground. The citizen called our emergency number and spoke to our control center. Our control center called the area supervisor who routed the operator in the area to the suspected leak site. Once the operator was on scene, he notified supervision that there was crude oil in the area of our row where our pipe is located. The upstream and downstream valves were closed and locked and tagged out. Local osro was notified and responded for the cleanup.
Report Received Date | 2023-11-06 00:00:00 |
---|---|
Iyear | 2023 |
Report Number | 20230263 |
Supplemental Number | 38879 |
Report Type | Supplemental Final |
Operator Id | 32103 PHMSA Enforcement |
Name | Crimson Pipeline L.p. |
Operator Street Address | 1900 Main Street Suite #600 |
Operator City Name | Irvine |
Operator State Abbreviation | CA |
Operator Postal Code | 92614 |
Time Zone | Pacific |
Daylight Savings Ind | Yes |
Location Latitude | 35.52774 Google Maps OpenStreetMap |
Location Longitude | -119.5668 Google Maps OpenStreetMap |
Commodity Released Type | Crude Oil |
Unintentional Release Bbls | 34 |
Recovered Bbls | 34 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Notification From Public |
System Part Involved | Onshore Pipeline, Including Valve Sites |
On Off Shore | Onshore |
Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
Shutdown Due Accident Ind | Yes |
Communication State Fed Ind | Yes |
Party Initiated Communication | Operator |
Nrc Rpt Num | 1377538 NRC Report How to search |
Additional Nrc Report Numbers | 1377575 |
Ignite Ind | No |
Upstream Action Taken | Valve Closure |
Upstream Valve Type Ind | Manual |
Downstream Action Taken | Valve Closure |
Downstream Valve Type Ind | Manual |
Notify Qualified Indiv Ind | Yes |
Oil Spill Removal Org Ind | Yes |
Osro Arrived On Site Dt | 8/28/2023 18:37 |
Num Pub Evacuated | 0 |
Pipe Fac Name | Cross Valley Between Rio Bravo And Carneras, Bv9 |
Segment Name | Csfm 0421 |
Onshore State Abbreviation | Ca |
Onshore Postal Code | 93206 |
Onshore City Name | Buttonwillow |
Onshore County Name | Kern |
Designated Location | Milepost |
Designated Name | 1.2 |
Federal | No |
Location Type | Pipeline Right-Of-Way |
Incident Area Type | Underground |
Incident Area Subtype | Under Soil |
Depth Of Cover | 78 |
Crossing | No |
Pipe Facility Type | Intrastate |
Item Involved | Pipe |
Pipe Type | Pipe Body |
Puddle Weld Ind | No |
Pipe Diameter | 16 |
Pipe Wall Thickness | 0.375 |
Pipe Smys | 60000 |
Pipe Specification | Unknown |
Pipe Seam Type | Seamless |
Pipe Manufacturer | Unknown |
Pipe Coating Type | Other |
Pipe Coating Details | Insulated Polyethylene Coating |
Coating Applied Ind | Unknown |
Installation Year | 1982 |
Manufactured Year | Unknown |
Material Involved | Carbon Steel |
Release Type | Leak |
Leak Type | Pinhole |
Wildlife Impact Ind | No |
Soil Contamination | Yes |
Long Term Assessment | No |
Remediation Ind | No |
Water Contam Ind | No |
Could Be Hca | No |
Commodity Reached Hca | No |
Est Cost Oper Paid | 0 |
Est Cost Gas Released | 0 |
Est Cost Prop Damage | 150000 |
Est Cost Emergency | 230000 |
Est Cost Environmental | 0 |
Est Cost Other | 0 |
Prpty | 380000 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 277 |
Mop Psig | 945 |
Mop Cfr Section | Other View CFR 49 §192 |
Mop Cfr Section Details | Pump Discharge Set Point. |
Maop Established Date | 1989-02-24 00:00:00 |
Maop Reversal Flow Ind | No |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Length Segment Isolated | 28000 |
Internal Inspection Ind | Yes |
Operation Complications Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Cpm In Place Ind | No |
Investigation Status | No, the facility was not monitored by a controller(s) at the time of the accident |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Corrosion Failure |
Cause Details | External Corrosion |
Internal External | External Corrosion |
Visual Exam Results | Localized Pitting |
Atmosphere Corrosion Ind | Yes |
Other Corrosion Ind | Yes |
Corrosion Type Details | The External Corrosion Experienced On The 0421 Line Is Due To Water Collecting Under The Insulated Coating. |
Field Exam Basis Ind | Yes |
Underground Location | Yes |
Under Cathodic Protection Ind | Yes |
Cathodic Pro Start Year | 2020 |
Shielding Evident | Yes |
Cathodic Survey Type | Yes |
Cp Annual Survey Ind | Yes |
Cp Annual Survey Year | 2022 |
Prior Damage | Yes |
Collected Data Ind | Yes |
Axial Magnetic Flx Lkg Ind | Yes |
Ultrasonic Ind | Yes |
Axial Recent Year | 2021 |
Axial Rcnt Propul Method | Free Swimming |
Axial Rcnt Attuned Detect | Metal Loss |
Axial Rcnt Atnd Dtct Metal | High Resolution |
Ultrasonic Recent Year | 2023 |
Ultrasonic Rcnt Propul Method | Free Swimming |
Ultrasonic Rcnt Attuned | Wall Measurement |
Utra Rcnt Att Metl Resolution | Standard Resolution |
Has Hydrtst Conduc Before Ind | Yes |
Hydrtst Most Rcnt Year | 1989 |
Hydrtst Most Rcnt Pressure | 1476 |
Direct Asmnt Conducted | No |
Non Destructive Exam Ind | No |
Extrnl Cor Stray Current Ind | Yes |
Preparer Name | N***** C****** |
Preparer Title | Regulatory Coordinator |
Preparer Email | N*******@c********.com |
Preparer Telephone | 5627545046 |
Prepared Date | 2023-11-30 00:00:00 |
Local Contact Name | N***** C****** |
Local Contact Email | N*******@c********.com |
Local Contact Telephone | 5627545046 |
Authorizer Name | M**** K******* |
Authorizer Telephone | 5622854137 |
Authorizer Title | President |
Authorizer Email | M********@c********.com |
Narrative | Control center received call from third party citizen at the location where they observed crude oil coming from the ground. The citizen called our emergency number and spoke to our control center. Our control center called the area supervisor who routed the operator in the area to the suspected leak site. Once the operator was on scene, he notified supervision that there was crude oil in the area of our row where our pipe is located. The upstream and downstream valves were closed and locked and tagged out. Local osro was notified and responded for the cleanup. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA