HL incident on 2023-10-30 — TX

Operator
Enterprise Products Operating Llc
Cause
Material Failure Of Pipe Or Weld
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$17,000
Incident datetime
2023-10-30 00:00 UTC
Report number
Location
TX
Narrative
On 9/30/2023 at 4:49 am cdt pipeline control received scada indication of a release on lid 205. The affected pipeline segment was immediately shutdown and isolated. Pipeline control confirmed with field personnel that a release occurred. The affected pipeline segment was replaced, and the pipeline was returned to service. After investigation the failure was determined to be an original manufacturing lack of fusion feature containing an area of ductile growth at the base. Initial nrc notification was made on 9/30/2023 at 5:22 am cdt (nrc #1380513). 48 update was provided to nrc on 10/1/2023 at 12:20 pm cdt (nrc #1380605). Update to 48-hour update was made to nrc on 10/2/2023 at 8:37 am cdt (nrc #1380651).
Detailed record list
Report Received Date
2023-10-30 00:00:00
Iyear
2023
Report Number
20230255
Supplemental Number
39115
Report Type
Supplemental Final
Operator Id
Name
Enterprise Products Operating Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Isobutane
Unintentional Release Bbls
4070
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Nrc Rpt Num
Additional Nrc Report Numbers
13,806,051,380,651
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Type Ind
Remotely Controlled
Downstream Action Taken
Valve Closure
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
South Leg Mainline
Segment Name
Lid205
Onshore State Abbreviation
Tx
Onshore Postal Code
79339
Onshore City Name
Not Within A Municipality
Onshore County Name
Hockley
Designated Location
Milepost
Designated Name
Mp 73
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
40
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
8
Pipe Wall Thickness
0.219
Pipe Smys
52000
Pipe Specification
Api 5l
Pipe Seam Type
Erw - Low Frequency
Pipe Manufacturer
Jones And Laughlin
Pipe Coating Type
Coal Tar
Coating Applied Ind
Yes
Installation Year
1960
Manufactured Year
1960
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Longitudinal
Rupture Width
0.4
Rupture Length
77.5
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
5000
Est Cost Gas Released
186325
Est Cost Prop Damage
17000
Est Cost Emergency
250
Est Cost Environmental
0
Est Cost Other
0
Prpty
208575
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
1431
Mop Psig
1440
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
1992-11-13 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
66528
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Field Exam Ind
Yes
Metallurgical Ind
Yes
Failure Type
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Other Factor
Yes
Other Factor Details
Manufacturing Lack Of Fusion
Additional Lack Fusion Ind
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Cir Trn Wave Mgn Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Axial Recent Year
2019
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Metal Loss
Axial Rcnt Atnd Dtct Metal
Standard Resolution
Axial Previous Year
2014
Axial Prev Propul Method
Free Swimming
Axial Prev Attuned Detect
Metal Loss
Axial Prev Atnd Dtct Metal
Standard Resolution
Circ Wave Recent Year
2019
Circ Wv Rcnt Propul Method
Free Swimming
Circ Wv Rcnt Resolution
Standard Resolution
Circ Wv Previous Year
2014
Circ Wv Prev Propul Method
Free Swimming
Circ Wv Prev Resolution
Standard Resolution
Geometry Recent Year
2019
Geometry Rcnt Propul Method
Free Swimming
Geometry Rcnt Resolution
Standard Resolution
Geometrt Rcnt Measur Cups
Inside Ili Cups
Geometry Previous Year
2014
Geometry Prev Propul Method
Free Swimming
Geometry Prev Resolution
Standard Resolution
Geometrt Prev Measur Cups
Inside Ili Cups
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
Yes
Exm Handl Ultrasonic Rcnt Year
2021
Exm Wet Mgnt Partcl Rcnt Year
2021
Exm Handl Ultrasonic Rcnt Ind
Yes
Exm Wet Mgnt Partcl Rcnt Ind
Yes
Preparer Name
Y******* B**
Preparer Title
Pipeline Compliance Engineer
Preparer Email
Y***@e****.com
Preparer Telephone
713-381-5650
Prepared Date
2024-01-25 00:00:00
Local Contact Name
Y******* B**
Local Contact Email
Y***@e****.com
Local Contact Telephone
713-381-5650
Authorizer Name
Y******* B**
Authorizer Telephone
713-381-5650
Authorizer Title
Pipeline Compliance Engineer
Authorizer Email
Y***@e****.com
Narrative
On 9/30/2023 at 4:49 am cdt pipeline control received scada indication of a release on lid 205. The affected pipeline segment was immediately shutdown and isolated. Pipeline control confirmed with field personnel that a release occurred. The affected pipeline segment was replaced, and the pipeline was returned to service. After investigation the failure was determined to be an original manufacturing lack of fusion feature containing an area of ductile growth at the base. Initial nrc notification was made on 9/30/2023 at 5:22 am cdt (nrc #1380513). 48 update was provided to nrc on 10/1/2023 at 12:20 pm cdt (nrc #1380605). Update to 48-hour update was made to nrc on 10/2/2023 at 8:37 am cdt (nrc #1380651).
Report Received Date 2023-10-30 00:00:00
Iyear 2023
Report Number 20230255
Supplemental Number 39115
Report Type Supplemental Final
Operator Id 31618 PHMSA Enforcement
Name Enterprise Products Operating Llc
Operator Street Address 1100 Louisiana Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 33.73163 Google Maps OpenStreetMap
Location Longitude -102.34128 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Other Hvl
Commodity Details Isobutane
Unintentional Release Bbls 4070
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Communication State Fed Ind Yes
Party Initiated Communication Operator
Nrc Rpt Num 1380513 NRC Report How to search
Additional Nrc Report Numbers 13,806,051,380,651
Ignite Ind No
Upstream Action Taken Valve Closure
Upstream Valve Type Ind Remotely Controlled
Downstream Action Taken Valve Closure
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name South Leg Mainline
Segment Name Lid205
Onshore State Abbreviation Tx
Onshore Postal Code 79339
Onshore City Name Not Within A Municipality
Onshore County Name Hockley
Designated Location Milepost
Designated Name Mp 73
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 40
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Puddle Weld Ind No
Pipe Diameter 8
Pipe Wall Thickness 0.219
Pipe Smys 52000
Pipe Specification Api 5l
Pipe Seam Type Erw - Low Frequency
Pipe Manufacturer Jones And Laughlin
Pipe Coating Type Coal Tar
Coating Applied Ind Yes
Installation Year 1960
Manufactured Year 1960
Material Involved Carbon Steel
Release Type Rupture
Rupture Orient Longitudinal
Rupture Width 0.4
Rupture Length 77.5
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 5000
Est Cost Gas Released 186325
Est Cost Prop Damage 17000
Est Cost Emergency 250
Est Cost Environmental 0
Est Cost Other 0
Prpty 208575
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 1431
Mop Psig 1440
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 1992-11-13 00:00:00
Maop Reversal Flow Ind Bi-Directional
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 66528
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Field Exam Ind Yes
Metallurgical Ind Yes
Failure Type Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Other Factor Yes
Other Factor Details Manufacturing Lack Of Fusion
Additional Lack Fusion Ind Yes
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Cir Trn Wave Mgn Flx Lkg Ind Yes
Geometry Deformation Ind Yes
Axial Recent Year 2019
Axial Rcnt Propul Method Free Swimming
Axial Rcnt Attuned Detect Metal Loss
Axial Rcnt Atnd Dtct Metal Standard Resolution
Axial Previous Year 2014
Axial Prev Propul Method Free Swimming
Axial Prev Attuned Detect Metal Loss
Axial Prev Atnd Dtct Metal Standard Resolution
Circ Wave Recent Year 2019
Circ Wv Rcnt Propul Method Free Swimming
Circ Wv Rcnt Resolution Standard Resolution
Circ Wv Previous Year 2014
Circ Wv Prev Propul Method Free Swimming
Circ Wv Prev Resolution Standard Resolution
Geometry Recent Year 2019
Geometry Rcnt Propul Method Free Swimming
Geometry Rcnt Resolution Standard Resolution
Geometrt Rcnt Measur Cups Inside Ili Cups
Geometry Previous Year 2014
Geometry Prev Propul Method Free Swimming
Geometry Prev Resolution Standard Resolution
Geometrt Prev Measur Cups Inside Ili Cups
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind Yes
Exm Handl Ultrasonic Rcnt Year 2021
Exm Wet Mgnt Partcl Rcnt Year 2021
Exm Handl Ultrasonic Rcnt Ind Yes
Exm Wet Mgnt Partcl Rcnt Ind Yes
Preparer Name Y******* B**
Preparer Title Pipeline Compliance Engineer
Preparer Email Y***@e****.com
Preparer Telephone 713-381-5650
Prepared Date 2024-01-25 00:00:00
Local Contact Name Y******* B**
Local Contact Email Y***@e****.com
Local Contact Telephone 713-381-5650
Authorizer Name Y******* B**
Authorizer Telephone 713-381-5650
Authorizer Title Pipeline Compliance Engineer
Authorizer Email Y***@e****.com
Narrative On 9/30/2023 at 4:49 am cdt pipeline control received scada indication of a release on lid 205. The affected pipeline segment was immediately shutdown and isolated. Pipeline control confirmed with field personnel that a release occurred. The affected pipeline segment was replaced, and the pipeline was returned to service. After investigation the failure was determined to be an original manufacturing lack of fusion feature containing an area of ductile growth at the base. Initial nrc notification was made on 9/30/2023 at 5:22 am cdt (nrc #1380513). 48 update was provided to nrc on 10/1/2023 at 12:20 pm cdt (nrc #1380605). Update to 48-hour update was made to nrc on 10/2/2023 at 8:37 am cdt (nrc #1380651).

All rights reserved. Copyright © by ClearPHMSA