HL incident on 2023-10-24 — TX
Operator
Holly Energy Partners - Operating, L.p.
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$1,000
Incident datetime
2023-10-24 00:00 UTC
Report number
Location
TX
Narrative
On september 25, 2023, a technician was conducting a facility check at the wichita falls terminal when he noticed a product leak at the pig receiver door. The technician promptly reported this to their supervisor, the hep control center, and initiated contractor assistance for cleanup. The valves isolating the pig receiver from the mainline were closed when the leak was discovered, and the mainline was not in operation (specifically, it was not scheduled to be delivering into the terminal at that time). As of this initial report, the exact volume of the recovered product is pending determination. As a result of the leak, agency notifications were made to the national response center (nrc), the texas railroad commission (rrc) and the texas commission on environmental quality (tceq). Upon investigation, the root cause of the release appears to be a damaged o-ring. Upon removal, it was observed that the o-ring had multiple nicks, which likely led to the leak. At the time of this report, both the pig receiver door o-ring (the source of the leak) and a secondary o-ring on the vent cap (which was not found to be leaking) have been replaced. 12.12.2023 update: the final recovered volume for this release was determined to be 2.1 bbls. Additionally, it has been confirmed that a failed o-ring was the cause of the release.
Detailed record list
Report Received Date
2023-10-24 00:00:00
Iyear
2023
Report Number
20230248
Supplemental Number
38942
Report Type
Supplemental Final
Operator Id
32011
Name
Holly Energy Partners - Operating, L.p.
Operator Street Address
2323 Victory Ave. Suite 1400
Operator City Name
Dallas
Operator State Abbreviation
TX
Operator Postal Code
75219
Time Zone
Central
Daylight Savings Ind
No
Location Latitude
33.937349
Location Longitude
-98.491122
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
2.1
Recovered Bbls
2.1
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
The Mainline Feeding The Pig Was Not Running At The Time (See Narrative)
Communication State Fed Ind
No
Nrc Rpt Num
1380041
Additional Nrc Report Numbers
1380183
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Wichita Falls Terminal
Segment Name
Trust 6/8
Onshore State Abbreviation
Tx
Onshore Postal Code
76301
Onshore City Name
Wichita Falls
Onshore County Name
Wichita
Designated Location
Survey Station No.
Designated Name
Wf Terminal
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Scraper/pig Trap
Installation Year
Unknown
Manufactured Year
Unknown
Material Involved
Material Other Than Carbon Steel
Material Details
Likely A Synthetic Rubber
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
No
Est Cost Oper Paid
0
Est Cost Gas Released
400
Est Cost Prop Damage
1000
Est Cost Emergency
10000
Est Cost Environmental
55000
Est Cost Other
0
Prpty
66400
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
140
Mop Psig
1440
Mop Cfr Section
Internal Design Pressure �195.406(A)(1)
Maop Established Date
1989-05-13 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The contributing factors of this release did not warrant an investigation into controller actions.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
O-Ring
Eq Additional Other Ind
Yes
Eq Additional Other Details
Failure Of O-Ring Is Not Appear Due To Anything Listed Above
Preparer Name
B******** T*****
Preparer Title
Pipeline Regulatory Manager
Preparer Email
B***************@h**********.com
Preparer Telephone
2149546652
Prepared Date
2023-12-12 00:00:00
Authorizer Name
B******** T*****
Authorizer Telephone
2149546652
Authorizer Title
Pipeline Regulatory Manager
Authorizer Email
B***************@h**********.com
Narrative
On september 25, 2023, a technician was conducting a facility check at the wichita falls terminal when he noticed a product leak at the pig receiver door. The technician promptly reported this to their supervisor, the hep control center, and initiated contractor assistance for cleanup. The valves isolating the pig receiver from the mainline were closed when the leak was discovered, and the mainline was not in operation (specifically, it was not scheduled to be delivering into the terminal at that time). As of this initial report, the exact volume of the recovered product is pending determination. As a result of the leak, agency notifications were made to the national response center (nrc), the texas railroad commission (rrc) and the texas commission on environmental quality (tceq). Upon investigation, the root cause of the release appears to be a damaged o-ring. Upon removal, it was observed that the o-ring had multiple nicks, which likely led to the leak. At the time of this report, both the pig receiver door o-ring (the source of the leak) and a secondary o-ring on the vent cap (which was not found to be leaking) have been replaced. 12.12.2023 update: the final recovered volume for this release was determined to be 2.1 bbls. Additionally, it has been confirmed that a failed o-ring was the cause of the release.
Report Received Date | 2023-10-24 00:00:00 |
---|---|
Iyear | 2023 |
Report Number | 20230248 |
Supplemental Number | 38942 |
Report Type | Supplemental Final |
Operator Id | 32011 PHMSA Enforcement |
Name | Holly Energy Partners - Operating, L.p. |
Operator Street Address | 2323 Victory Ave. Suite 1400 |
Operator City Name | Dallas |
Operator State Abbreviation | TX |
Operator Postal Code | 75219 |
Time Zone | Central |
Daylight Savings Ind | No |
Location Latitude | 33.937349 Google Maps OpenStreetMap |
Location Longitude | -98.491122 Google Maps OpenStreetMap |
Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
Commodity Subtype | Diesel, Fuel Oil, Kerosene, Jet Fuel |
Unintentional Release Bbls | 2.1 |
Recovered Bbls | 2.1 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Local Operating Personnel, Including Contractors |
Operator Type | Operator Employee |
System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
On Off Shore | Onshore |
Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
Shutdown Due Accident Ind | No |
Shutdown Explain | The Mainline Feeding The Pig Was Not Running At The Time (See Narrative) |
Communication State Fed Ind | No |
Nrc Rpt Num | 1380041 NRC Report How to search |
Additional Nrc Report Numbers | 1380183 |
Ignite Ind | No |
Notify Qualified Indiv Ind | Yes |
Oil Spill Removal Org Ind | No |
Num Pub Evacuated | 0 |
Pipe Fac Name | Wichita Falls Terminal |
Segment Name | Trust 6/8 |
Onshore State Abbreviation | Tx |
Onshore Postal Code | 76301 |
Onshore City Name | Wichita Falls |
Onshore County Name | Wichita |
Designated Location | Survey Station No. |
Designated Name | Wf Terminal |
Federal | No |
Location Type | Totally Contained On Operator-Controlled Property |
Incident Area Type | Aboveground |
Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
Crossing | No |
Pipe Facility Type | Intrastate |
Item Involved | Scraper/pig Trap |
Installation Year | Unknown |
Manufactured Year | Unknown |
Material Involved | Material Other Than Carbon Steel |
Material Details | Likely A Synthetic Rubber |
Release Type | Leak |
Leak Type | Seal Or Packing |
Wildlife Impact Ind | No |
Soil Contamination | Yes |
Long Term Assessment | No |
Remediation Ind | Yes |
Soil Remed Ind | Yes |
Water Contam Ind | No |
Could Be Hca | Yes |
Commodity Reached Hca | Yes |
High Pop Ind | Yes |
High Pop Yes No | No |
Est Cost Oper Paid | 0 |
Est Cost Gas Released | 400 |
Est Cost Prop Damage | 1000 |
Est Cost Emergency | 10000 |
Est Cost Environmental | 55000 |
Est Cost Other | 0 |
Prpty | 66400 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 140 |
Mop Psig | 1440 |
Mop Cfr Section | Internal Design Pressure �195.406(A)(1) View CFR 49 §192 |
Maop Established Date | 1989-05-13 00:00:00 |
Maop Reversal Flow Ind | No |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Cpm In Place Ind | Yes |
Cpm Operating Ind | Yes |
Cpm Functional Ind | Yes |
Cpm Detection Ind | No |
Cpm Conf Ind | No |
Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
Investigation Status Details | The contributing factors of this release did not warrant an investigation into controller actions. |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Equipment Failure |
Cause Details | Non-Threaded Connection Failure |
Eq Failure Type | Non-Threaded Connection Failure |
Other Non Threaded Ind | O-Ring |
Eq Additional Other Ind | Yes |
Eq Additional Other Details | Failure Of O-Ring Is Not Appear Due To Anything Listed Above |
Preparer Name | B******** T***** |
Preparer Title | Pipeline Regulatory Manager |
Preparer Email | B***************@h**********.com |
Preparer Telephone | 2149546652 |
Prepared Date | 2023-12-12 00:00:00 |
Authorizer Name | B******** T***** |
Authorizer Telephone | 2149546652 |
Authorizer Title | Pipeline Regulatory Manager |
Authorizer Email | B***************@h**********.com |
Narrative | On september 25, 2023, a technician was conducting a facility check at the wichita falls terminal when he noticed a product leak at the pig receiver door. The technician promptly reported this to their supervisor, the hep control center, and initiated contractor assistance for cleanup. The valves isolating the pig receiver from the mainline were closed when the leak was discovered, and the mainline was not in operation (specifically, it was not scheduled to be delivering into the terminal at that time). As of this initial report, the exact volume of the recovered product is pending determination. As a result of the leak, agency notifications were made to the national response center (nrc), the texas railroad commission (rrc) and the texas commission on environmental quality (tceq). Upon investigation, the root cause of the release appears to be a damaged o-ring. Upon removal, it was observed that the o-ring had multiple nicks, which likely led to the leak. At the time of this report, both the pig receiver door o-ring (the source of the leak) and a secondary o-ring on the vent cap (which was not found to be leaking) have been replaced. 12.12.2023 update: the final recovered volume for this release was determined to be 2.1 bbls. Additionally, it has been confirmed that a failed o-ring was the cause of the release. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA