HL incident on 2023-09-18 — KS

Operator
Texoma Crude Oil Pipeline Co., Llc
Cause
Material Failure Of Pipe Or Weld
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$10,000
Incident datetime
2023-09-18 00:00 UTC
Report number
Location
KS
Narrative
C19.4 pipeline is a railroad commission of texas jurisdictional transmission line. While running crude oil and biocide through the 8-inch c19.4 line west of ringgold to clean the line (which was started at 08:50 on 08-23-2023), the line released approximately 300 barrels into a pasture. 3,980 barrels of crude oil were being transported from burk station to ringgold station. Lack of volumes on line balance raised concerns by control center personnel and at ringgold station, which prompted pipeline supervisor to dispatch company personnel and air patrol to search for issues. Air patrol visually detected the release in a pasture approximately 1/2 mile west of ringgold station. The impact was isolated to the field and did not impact water. Line had been previously idle for about 5 months. Awaiting metallurgical test analysis in order to understand reason for failure of pipe. Line remains shutdown until a satisfactory hydrostatic test of the pipeline is achieved, to be accomplished after receipt of analysis results. Supplemental report on 01-23-2024 submitted to update report to show results of the metallurgical test analysis results. Line remains shutdown and will conduct a hydrostatic test prior to placing line back in service. Hydrostatic test date to be determined at this time. Supplemental final report on 02-28-2024 submitted to close this accident report. Line remains shutdown and will conduct a hydrostatic test prior to placing line back in service. Hydrostatic test date to be determined at this time.
Detailed record list
Report Received Date
2023-09-18 00:00:00
Iyear
2023
Report Number
20230219
Supplemental Number
39261
Report Type
Supplemental Final
Operator Id
Name
Texoma Crude Oil Pipeline Co., Llc
Operator Street Address
8301 E 21st St N #370
Operator City Name
Wichita
Operator State Abbreviation
KS
Operator Postal Code
67206
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
300
Recovered Bbls
250
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Still Shutdown Ind
Yes
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Nrc Rpt Num
Additional Nrc Report Numbers
1377273
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Type Ind
Manual
Downstream Action Taken
Valve Closure
Downstream Valve Type Ind
Remotely Controlled
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Henrietta_jct_to_ringold_south
Segment Name
C19.4
Onshore State Abbreviation
Tx
Onshore Postal Code
76261
Onshore City Name
Not Within A Municipality
Onshore County Name
Montague
Designated Location
Survey Station No.
Designated Name
Near Ringgold
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
36
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Seam
Pipe Diameter
8.625
Pipe Wall Thickness
0.322
Pipe Smys
24000
Pipe Specification
Unknown
Pipe Seam Type
Lap Welded
Pipe Manufacturer
National Tube Company
Pipe Coating Type
Coal Tar
Coating Applied Ind
Yes
Installation Year
1962
Manufactured Year
1930
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Burnt Metal Of Lap Weld Of Pipe Occurred From The Moment The Pipe Was Manufactured.
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
10000
Est Cost Gas Released
24075
Est Cost Prop Damage
10000
Est Cost Emergency
11000
Est Cost Environmental
66000
Est Cost Other
0
Prpty
121075
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
119
Mop Psig
720
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
1993-11-16 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
95235
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Field Exam Ind
Yes
Metallurgical Ind
Yes
Failure Type
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Other Factor
Yes
Other Factor Details
Burnt Metal Of Lap Weld Of Pipe Occurred When Pipe Was Manufactured.
Additional Burnt Steel Ind
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Axial Recent Year
2020
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Other
Axial Rcnt Atnd Dtct Dtls
Metal Loss And Dents
Axial Previous Year
2015
Axial Prev Propul Method
Free Swimming
Axial Prev Attuned Detect
Other
Axial Prev Atnd Dtct Dtls
Metal Loss And Dents
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
1993
Hydrtst Most Rcnt Pressure
978.7
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
T*** E****
Preparer Title
Director Ehst And Dot Compliance
Preparer Email
T*********@a***********.com
Preparer Telephone
4056970059
Prepared Date
2024-02-28 00:00:00
Local Contact Name
T*** E****
Local Contact Email
T*********@a***********.com
Local Contact Telephone
4056970059
Authorizer Name
J*** R****
Authorizer Telephone
7209231756
Authorizer Title
Chief Operating Officer
Authorizer Email
J*********@a***********.com
Narrative
C19.4 pipeline is a railroad commission of texas jurisdictional transmission line. While running crude oil and biocide through the 8-inch c19.4 line west of ringgold to clean the line (which was started at 08:50 on 08-23-2023), the line released approximately 300 barrels into a pasture. 3,980 barrels of crude oil were being transported from burk station to ringgold station. Lack of volumes on line balance raised concerns by control center personnel and at ringgold station, which prompted pipeline supervisor to dispatch company personnel and air patrol to search for issues. Air patrol visually detected the release in a pasture approximately 1/2 mile west of ringgold station. The impact was isolated to the field and did not impact water. Line had been previously idle for about 5 months. Awaiting metallurgical test analysis in order to understand reason for failure of pipe. Line remains shutdown until a satisfactory hydrostatic test of the pipeline is achieved, to be accomplished after receipt of analysis results. Supplemental report on 01-23-2024 submitted to update report to show results of the metallurgical test analysis results. Line remains shutdown and will conduct a hydrostatic test prior to placing line back in service. Hydrostatic test date to be determined at this time. Supplemental final report on 02-28-2024 submitted to close this accident report. Line remains shutdown and will conduct a hydrostatic test prior to placing line back in service. Hydrostatic test date to be determined at this time.
Report Received Date 2023-09-18 00:00:00
Iyear 2023
Report Number 20230219
Supplemental Number 39261
Report Type Supplemental Final
Operator Id 39887 PHMSA Enforcement
Name Texoma Crude Oil Pipeline Co., Llc
Operator Street Address 8301 E 21st St N #370
Operator City Name Wichita
Operator State Abbreviation KS
Operator Postal Code 67206
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 33.86608 Google Maps OpenStreetMap
Location Longitude -97.96573 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 300
Recovered Bbls 250
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Still Shutdown Ind Yes
Communication State Fed Ind Yes
Party Initiated Communication Operator
Nrc Rpt Num 1377070 NRC Report How to search
Additional Nrc Report Numbers 1377273
Ignite Ind No
Upstream Action Taken Valve Closure
Upstream Valve Type Ind Manual
Downstream Action Taken Valve Closure
Downstream Valve Type Ind Remotely Controlled
Notify Qualified Indiv Ind Yes
Oil Spill Removal Org Ind No
Num Pub Evacuated 0
Pipe Fac Name Henrietta_jct_to_ringold_south
Segment Name C19.4
Onshore State Abbreviation Tx
Onshore Postal Code 76261
Onshore City Name Not Within A Municipality
Onshore County Name Montague
Designated Location Survey Station No.
Designated Name Near Ringgold
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 36
Crossing No
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Seam
Pipe Diameter 8.625
Pipe Wall Thickness 0.322
Pipe Smys 24000
Pipe Specification Unknown
Pipe Seam Type Lap Welded
Pipe Manufacturer National Tube Company
Pipe Coating Type Coal Tar
Coating Applied Ind Yes
Installation Year 1962
Manufactured Year 1930
Material Involved Carbon Steel
Release Type Other
Release Type Details Burnt Metal Of Lap Weld Of Pipe Occurred From The Moment The Pipe Was Manufactured.
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 10000
Est Cost Gas Released 24075
Est Cost Prop Damage 10000
Est Cost Emergency 11000
Est Cost Environmental 66000
Est Cost Other 0
Prpty 121075
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 119
Mop Psig 720
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 1993-11-16 00:00:00
Maop Reversal Flow Ind Bi-Directional
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 95235
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind Yes
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Field Exam Ind Yes
Metallurgical Ind Yes
Failure Type Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Other Factor Yes
Other Factor Details Burnt Metal Of Lap Weld Of Pipe Occurred When Pipe Was Manufactured.
Additional Burnt Steel Ind Yes
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Axial Recent Year 2020
Axial Rcnt Propul Method Free Swimming
Axial Rcnt Attuned Detect Other
Axial Rcnt Atnd Dtct Dtls Metal Loss And Dents
Axial Previous Year 2015
Axial Prev Propul Method Free Swimming
Axial Prev Attuned Detect Other
Axial Prev Atnd Dtct Dtls Metal Loss And Dents
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 1993
Hydrtst Most Rcnt Pressure 978.7
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name T*** E****
Preparer Title Director Ehst And Dot Compliance
Preparer Email T*********@a***********.com
Preparer Telephone 4056970059
Prepared Date 2024-02-28 00:00:00
Local Contact Name T*** E****
Local Contact Email T*********@a***********.com
Local Contact Telephone 4056970059
Authorizer Name J*** R****
Authorizer Telephone 7209231756
Authorizer Title Chief Operating Officer
Authorizer Email J*********@a***********.com
Narrative C19.4 pipeline is a railroad commission of texas jurisdictional transmission line. While running crude oil and biocide through the 8-inch c19.4 line west of ringgold to clean the line (which was started at 08:50 on 08-23-2023), the line released approximately 300 barrels into a pasture. 3,980 barrels of crude oil were being transported from burk station to ringgold station. Lack of volumes on line balance raised concerns by control center personnel and at ringgold station, which prompted pipeline supervisor to dispatch company personnel and air patrol to search for issues. Air patrol visually detected the release in a pasture approximately 1/2 mile west of ringgold station. The impact was isolated to the field and did not impact water. Line had been previously idle for about 5 months. Awaiting metallurgical test analysis in order to understand reason for failure of pipe. Line remains shutdown until a satisfactory hydrostatic test of the pipeline is achieved, to be accomplished after receipt of analysis results. Supplemental report on 01-23-2024 submitted to update report to show results of the metallurgical test analysis results. Line remains shutdown and will conduct a hydrostatic test prior to placing line back in service. Hydrostatic test date to be determined at this time. Supplemental final report on 02-28-2024 submitted to close this accident report. Line remains shutdown and will conduct a hydrostatic test prior to placing line back in service. Hydrostatic test date to be determined at this time.