HL incident on 2023-09-15 — TX
Operator
Western Midstream Partners, Lp
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$17,450
Incident datetime
2023-09-15 00:00 UTC
Report number
Location
TX
Narrative
While conducting right-of-way inspection, field operator discovered oil in the existing excavation from the previous leak on the lt-12" cat w. Cgf-b to mot pipeline which occurred on 04/10,2023. Internal notifications were made and operators upstream were notified to curtail production to the pipeline. Downstream operators were also notified of curtailment. Leak was identified as a seep, therefore the line was only briefly shut in to apply the temporary clamp.
Detailed record list
Report Received Date
2023-09-15 00:00:00
Iyear
2023
Report Number
20230214
Supplemental Number
39083
Report Type
Supplemental Final
Operator Id
Name
Western Midstream Partners, Lp
Operator Street Address
9950 Woodloch Forest Dr Suite 2800
Operator City Name
The Woodlands
Operator State Abbreviation
TX
Operator Postal Code
77380
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
28.289912
Location Longitude
-99.900908
Commodity Released Type
Crude Oil
Unintentional Release Bbls
10
Recovered Bbls
10
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Upstream/downstream Operators Shut In Flow In Order To Place Temp Clamp
Communication State Fed Ind
No
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Upstream Action Taken
Operational Control
Upstream Oprtnl Cntrl Detail
Curtailed Upstream Producers From Flowing Into The Line.
Downstream Action Taken
Operational Control
Downstream Oprtnl Cntrl Detail
Notified Control Center Of Curtailment And Monitored Pressures.
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Springfield Pipeline Llc
Segment Name
Lt-12" Cat W. Cgf-B To Mot
Onshore State Abbreviation
Tx
Onshore Postal Code
78834
Onshore City Name
Not Within A Municipality
Onshore County Name
Dimmit
Designated Location
Survey Station No.
Designated Name
91138.16
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
66
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
12
Pipe Wall Thickness
0.281
Pipe Smys
60000
Pipe Specification
Api 5l
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Ipsco Tubulars Inc
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Coating Applied Ind
No
Installation Year
2012
Manufactured Year
2011
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
Yes
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
17450
Est Cost Emergency
0
Est Cost Environmental
17450
Est Cost Other
0
Prpty
34900
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
35
Mop Psig
200
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2012-01-31 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Size of leak was too small to have alarmed in control room
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Microbiological Ind
Yes
Int Metallurgical Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Yes
Corrosion Coupons
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Axial Recent Year
2023
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Metal Loss
Axial Rcnt Atnd Dtct Metal
High Resolution
Axial Previous Year
2021
Axial Prev Propul Method
Free Swimming
Axial Prev Attuned Detect
Metal Loss
Axial Prev Atnd Dtct Metal
High Resolution
Geometry Recent Year
2023
Geometry Rcnt Propul Method
Free Swimming
Geometry Rcnt Resolution
High Resolution
Geometrt Rcnt Measur Cups
No Cups
Geometry Previous Year
2021
Geometry Prev Propul Method
Free Swimming
Geometry Prev Resolution
High Resolution
Geometrt Prev Measur Cups
No Cups
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
S***** W****
Preparer Title
Dot Advisor
Preparer Email
S***********@w***************.com
Preparer Telephone
3467865148
Prepared Date
2024-01-17 00:00:00
Local Contact Name
C***** D**
Local Contact Email
C*********@w***************.com
Local Contact Telephone
8303223415
Authorizer Name
L**** N****
Authorizer Telephone
3467865089
Authorizer Title
Director Stx Operations
Authorizer Email
L**********@w***************.com
Narrative
While conducting right-of-way inspection, field operator discovered oil in the existing excavation from the previous leak on the lt-12" cat w. Cgf-b to mot pipeline which occurred on 04/10,2023. Internal notifications were made and operators upstream were notified to curtail production to the pipeline. Downstream operators were also notified of curtailment. Leak was identified as a seep, therefore the line was only briefly shut in to apply the temporary clamp.
Report Received Date | 2023-09-15 00:00:00 |
---|---|
Iyear | 2023 |
Report Number | 20230214 |
Supplemental Number | 39083 |
Report Type | Supplemental Final |
Operator Id | 473 PHMSA Enforcement |
Name | Western Midstream Partners, Lp |
Operator Street Address | 9950 Woodloch Forest Dr Suite 2800 |
Operator City Name | The Woodlands |
Operator State Abbreviation | TX |
Operator Postal Code | 77380 |
Time Zone | Central |
Daylight Savings Ind | Yes |
Location Latitude | 28.289912 Google Maps OpenStreetMap |
Location Longitude | -99.900908 Google Maps OpenStreetMap |
Commodity Released Type | Crude Oil |
Unintentional Release Bbls | 10 |
Recovered Bbls | 10 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Local Operating Personnel, Including Contractors |
Operator Type | Operator Employee |
System Part Involved | Onshore Pipeline, Including Valve Sites |
On Off Shore | Onshore |
Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
Shutdown Due Accident Ind | No |
Shutdown Explain | Upstream/downstream Operators Shut In Flow In Order To Place Temp Clamp |
Communication State Fed Ind | No |
Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
Ignite Ind | No |
Upstream Action Taken | Operational Control |
Upstream Oprtnl Cntrl Detail | Curtailed Upstream Producers From Flowing Into The Line. |
Downstream Action Taken | Operational Control |
Downstream Oprtnl Cntrl Detail | Notified Control Center Of Curtailment And Monitored Pressures. |
Notify Qualified Indiv Ind | Yes |
Oil Spill Removal Org Ind | No |
Num Pub Evacuated | 0 |
Pipe Fac Name | Springfield Pipeline Llc |
Segment Name | Lt-12" Cat W. Cgf-B To Mot |
Onshore State Abbreviation | Tx |
Onshore Postal Code | 78834 |
Onshore City Name | Not Within A Municipality |
Onshore County Name | Dimmit |
Designated Location | Survey Station No. |
Designated Name | 91138.16 |
Federal | No |
Location Type | Pipeline Right-Of-Way |
Incident Area Type | Underground |
Incident Area Subtype | Exposed Due To Excavation |
Depth Of Cover | 66 |
Crossing | No |
Pipe Facility Type | Intrastate |
Item Involved | Pipe |
Pipe Type | Pipe Body |
Puddle Weld Ind | No |
Pipe Diameter | 12 |
Pipe Wall Thickness | 0.281 |
Pipe Smys | 60000 |
Pipe Specification | Api 5l |
Pipe Seam Type | Erw - High Frequency |
Pipe Manufacturer | Ipsco Tubulars Inc |
Pipe Coating Type | Fusion Bonded Epoxy(Fbe) |
Coating Applied Ind | No |
Installation Year | 2012 |
Manufactured Year | 2011 |
Material Involved | Carbon Steel |
Release Type | Leak |
Leak Type | Pinhole |
Wildlife Impact Ind | No |
Soil Contamination | Yes |
Long Term Assessment | Yes |
Remediation Ind | Yes |
Soil Remed Ind | Yes |
Water Contam Ind | No |
Could Be Hca | No |
Commodity Reached Hca | No |
Est Cost Oper Paid | 0 |
Est Cost Gas Released | 0 |
Est Cost Prop Damage | 17450 |
Est Cost Emergency | 0 |
Est Cost Environmental | 17450 |
Est Cost Other | 0 |
Prpty | 34900 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 35 |
Mop Psig | 200 |
Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
Maop Established Date | 2012-01-31 00:00:00 |
Maop Reversal Flow Ind | No |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Internal Inspection Ind | Yes |
Operation Complications Ind | No |
Pipeline Function | < 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Cpm In Place Ind | No |
Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
Investigation Status Details | Size of leak was too small to have alarmed in control room |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Corrosion Failure |
Cause Details | Internal Corrosion |
Internal External | Internal Corrosion |
Int Visual Exam Results | Localized Pitting |
Int Microbiological Ind | Yes |
Int Metallurgical Basis Ind | Yes |
Int Low Point Pipe Loc Ind | Yes |
Corrosion Inhibitors | Yes |
Corrosion Lining | No |
Cleaning Dewatering | Yes |
Corrosion Coupons | Yes |
Collected Data Ind | Yes |
Axial Magnetic Flx Lkg Ind | Yes |
Geometry Deformation Ind | Yes |
Axial Recent Year | 2023 |
Axial Rcnt Propul Method | Free Swimming |
Axial Rcnt Attuned Detect | Metal Loss |
Axial Rcnt Atnd Dtct Metal | High Resolution |
Axial Previous Year | 2021 |
Axial Prev Propul Method | Free Swimming |
Axial Prev Attuned Detect | Metal Loss |
Axial Prev Atnd Dtct Metal | High Resolution |
Geometry Recent Year | 2023 |
Geometry Rcnt Propul Method | Free Swimming |
Geometry Rcnt Resolution | High Resolution |
Geometrt Rcnt Measur Cups | No Cups |
Geometry Previous Year | 2021 |
Geometry Prev Propul Method | Free Swimming |
Geometry Prev Resolution | High Resolution |
Geometrt Prev Measur Cups | No Cups |
Has Hydrtst Conduc Before Ind | No |
Direct Asmnt Conducted | No |
Non Destructive Exam Ind | No |
Preparer Name | S***** W**** |
Preparer Title | Dot Advisor |
Preparer Email | S***********@w***************.com |
Preparer Telephone | 3467865148 |
Prepared Date | 2024-01-17 00:00:00 |
Local Contact Name | C***** D** |
Local Contact Email | C*********@w***************.com |
Local Contact Telephone | 8303223415 |
Authorizer Name | L**** N**** |
Authorizer Telephone | 3467865089 |
Authorizer Title | Director Stx Operations |
Authorizer Email | L**********@w***************.com |
Narrative | While conducting right-of-way inspection, field operator discovered oil in the existing excavation from the previous leak on the lt-12" cat w. Cgf-b to mot pipeline which occurred on 04/10,2023. Internal notifications were made and operators upstream were notified to curtail production to the pipeline. Downstream operators were also notified of curtailment. Leak was identified as a seep, therefore the line was only briefly shut in to apply the temporary clamp. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA