HL incident on 2023-09-14 — TX

Operator
Chevron Pipe Line Co
Cause
Material Failure Of Pipe Or Weld
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$120,000
Incident datetime
2023-09-14 00:00 UTC
Report number
Location
TX
Narrative
At approx. 1350 cdt on 14aug23, while k9 patrol leak detection services were conducting routine inspections of the frio pipeline row, a release of ppmix was detected coming from below ground near the txl0028 pipeline, which was later confirmed by a gas analyzer. The pipeline was already shut-in at the time the leak was detected for other unrelated operational efforts. At 1525 the pipeline pressure was brought down to 330psig. The pipeline has been repaired and remains down until further investigation efforts can be completed as of 14sep23.
Detailed record list
Report Received Date
2023-09-14 00:00:00
Iyear
2023
Report Number
20230213
Supplemental Number
38810
Report Type
Supplemental Final
Operator Id
Name
Chevron Pipe Line Co
Operator Street Address
1400 Smith Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Propylene-Propane Mix (Pp Mix)
Unintentional Release Bbls
0.35
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Ground Patrol By Operator Or Its Contractor
Operator Type
Contractor Working For The Operator
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Idle
Communication State Fed Ind
No
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Upstream Action Taken
Operational Control
Upstream Oprtnl Cntrl Detail
Pipeline Was Shut-In And Time Of Accident Control Center Brought Line Down To 330psig
Downstream Action Taken
Operational Control
Downstream Oprtnl Cntrl Detail
Pipeline Was Shut-In And Time Of Accident Control Center Brought Line Down To 330psig
Num Pub Evacuated
0
Pipe Fac Name
8"/10" Fannett To Port Acres
Segment Name
Txl0028
Onshore State Abbreviation
Tx
Onshore Postal Code
77640
Onshore City Name
Port Acres
Onshore County Name
Jefferson County
Designated Location
Milepost
Designated Name
16.4
Federal
Yes
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
42
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Weld, Including Heat-Affected Zone
Pipe Diameter
8.63
Pipe Wall Thickness
0.25
Pipe Smys
42000
Pipe Specification
Api5l
Pipe Seam Type
Seamless
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Coating Applied Ind
No
Weld Subtype
Pipe Girth Weld
Different Girth Weld Ind
No
Installation Year
1958
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
23
Est Cost Prop Damage
120000
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
120023
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
540
Mop Psig
1461
Mop Cfr Section
Internal Design Pressure �195.406(A)(1)
Maop Established Date
2016-10-05 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The pipeline was in an idle state and the leak was too small to detect by control room
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Design-, Construction-, Installation-, Or Fabrication-Related
Other Analysis Ind
Yes
Other Analysis Details
Vt&rt By Ndt/destructive Testing By Lab
Failure Type
Design-, Construction-, Installation-, Or Fabrication-Related
Pwf Additional Other Ind
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Axial Recent Year
2020
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Metal Loss
Axial Rcnt Atnd Dtct Metal
High Resolution
Axial Previous Year
2016
Axial Prev Propul Method
Free Swimming
Axial Prev Attuned Detect
Metal Loss
Axial Prev Atnd Dtct Metal
High Resolution
Geometry Recent Year
2020
Geometry Rcnt Propul Method
Free Swimming
Geometry Rcnt Resolution
High Resolution
Geometrt Rcnt Measur Cups
Inside Ili Cups
Geometry Previous Year
2016
Geometry Prev Propul Method
Free Swimming
Geometry Prev Resolution
High Resolution
Geometrt Prev Measur Cups
Inside Ili Cups
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2016
Hydrtst Most Rcnt Pressure
1942
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Extrnl Cor Microbiologic Ind
Yes
Preparer Name
C*** M*******
Preparer Title
Regulatory Compliance Specialist
Preparer Email
C************@c******.com
Prepared Date
2023-11-16 00:00:00
Authorizer Name
C*** M*******
Authorizer Telephone
8323649116
Authorizer Title
Regulatory Compliance Specialist
Authorizer Email
C************@c******.com
Narrative
At approx. 1350 cdt on 14aug23, while k9 patrol leak detection services were conducting routine inspections of the frio pipeline row, a release of ppmix was detected coming from below ground near the txl0028 pipeline, which was later confirmed by a gas analyzer. The pipeline was already shut-in at the time the leak was detected for other unrelated operational efforts. At 1525 the pipeline pressure was brought down to 330psig. The pipeline has been repaired and remains down until further investigation efforts can be completed as of 14sep23.
Report Received Date 2023-09-14 00:00:00
Iyear 2023
Report Number 20230213
Supplemental Number 38810
Report Type Supplemental Final
Operator Id 2731 PHMSA Enforcement
Name Chevron Pipe Line Co
Operator Street Address 1400 Smith Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 29.91659 Google Maps OpenStreetMap
Location Longitude -94.0231 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Other Hvl
Commodity Details Propylene-Propane Mix (Pp Mix)
Unintentional Release Bbls 0.35
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Ground Patrol By Operator Or Its Contractor
Operator Type Contractor Working For The Operator
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Idle
Communication State Fed Ind No
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Upstream Action Taken Operational Control
Upstream Oprtnl Cntrl Detail Pipeline Was Shut-In And Time Of Accident Control Center Brought Line Down To 330psig
Downstream Action Taken Operational Control
Downstream Oprtnl Cntrl Detail Pipeline Was Shut-In And Time Of Accident Control Center Brought Line Down To 330psig
Num Pub Evacuated 0
Pipe Fac Name 8"/10" Fannett To Port Acres
Segment Name Txl0028
Onshore State Abbreviation Tx
Onshore Postal Code 77640
Onshore City Name Port Acres
Onshore County Name Jefferson County
Designated Location Milepost
Designated Name 16.4
Federal Yes
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 42
Crossing No
Pipe Facility Type Intrastate
Item Involved Weld, Including Heat-Affected Zone
Pipe Diameter 8.63
Pipe Wall Thickness 0.25
Pipe Smys 42000
Pipe Specification Api5l
Pipe Seam Type Seamless
Pipe Manufacturer Unknown
Pipe Coating Type Coal Tar
Coating Applied Ind No
Weld Subtype Pipe Girth Weld
Different Girth Weld Ind No
Installation Year 1958
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 23
Est Cost Prop Damage 120000
Est Cost Emergency 0
Est Cost Environmental 0
Est Cost Other 0
Prpty 120023
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 540
Mop Psig 1461
Mop Cfr Section Internal Design Pressure �195.406(A)(1) View CFR 49 §192
Maop Established Date 2016-10-05 00:00:00
Maop Reversal Flow Ind Bi-Directional
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The pipeline was in an idle state and the leak was too small to detect by control room
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Design-, Construction-, Installation-, Or Fabrication-Related
Other Analysis Ind Yes
Other Analysis Details Vt&rt By Ndt/destructive Testing By Lab
Failure Type Design-, Construction-, Installation-, Or Fabrication-Related
Pwf Additional Other Ind Yes
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Geometry Deformation Ind Yes
Axial Recent Year 2020
Axial Rcnt Propul Method Free Swimming
Axial Rcnt Attuned Detect Metal Loss
Axial Rcnt Atnd Dtct Metal High Resolution
Axial Previous Year 2016
Axial Prev Propul Method Free Swimming
Axial Prev Attuned Detect Metal Loss
Axial Prev Atnd Dtct Metal High Resolution
Geometry Recent Year 2020
Geometry Rcnt Propul Method Free Swimming
Geometry Rcnt Resolution High Resolution
Geometrt Rcnt Measur Cups Inside Ili Cups
Geometry Previous Year 2016
Geometry Prev Propul Method Free Swimming
Geometry Prev Resolution High Resolution
Geometrt Prev Measur Cups Inside Ili Cups
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 2016
Hydrtst Most Rcnt Pressure 1942
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Extrnl Cor Microbiologic Ind Yes
Preparer Name C*** M*******
Preparer Title Regulatory Compliance Specialist
Preparer Email C************@c******.com
Prepared Date 2023-11-16 00:00:00
Authorizer Name C*** M*******
Authorizer Telephone 8323649116
Authorizer Title Regulatory Compliance Specialist
Authorizer Email C************@c******.com
Narrative At approx. 1350 cdt on 14aug23, while k9 patrol leak detection services were conducting routine inspections of the frio pipeline row, a release of ppmix was detected coming from below ground near the txl0028 pipeline, which was later confirmed by a gas analyzer. The pipeline was already shut-in at the time the leak was detected for other unrelated operational efforts. At 1525 the pipeline pressure was brought down to 330psig. The pipeline has been repaired and remains down until further investigation efforts can be completed as of 14sep23.