Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2023-09-14 — TX
Operator
Chevron Pipe Line Co
Cause
Material Failure Of Pipe Or Weld
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$120,000
Incident datetime
2023-09-14 00:00 UTC
Report number
Location
TX
Narrative
At approx. 1350 cdt on 14aug23, while k9 patrol leak detection services were conducting routine inspections of the frio pipeline row, a release of ppmix was detected coming from below ground near the txl0028 pipeline, which was later confirmed by a gas analyzer. The pipeline was already shut-in at the time the leak was detected for other unrelated operational efforts. At 1525 the pipeline pressure was brought down to 330psig. The pipeline has been repaired and remains down until further investigation efforts can be completed as of 14sep23.
Detailed record list
Report Received Date
2023-09-14 00:00:00
Iyear
2023
Report Number
20230213
Supplemental Number
38810
Report Type
Supplemental Final
Operator Id
2731
Name
Chevron Pipe Line Co
Operator Street Address
1400 Smith Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
29.91659
Location Longitude
-94.0231
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Propylene-Propane Mix (Pp Mix)
Unintentional Release Bbls
0.35
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Ground Patrol By Operator Or Its Contractor
Operator Type
Contractor Working For The Operator
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Idle
Communication State Fed Ind
No
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Upstream Action Taken
Operational Control
Upstream Oprtnl Cntrl Detail
Pipeline Was Shut-In And Time Of Accident Control Center Brought Line Down To 330psig
Downstream Action Taken
Operational Control
Downstream Oprtnl Cntrl Detail
Pipeline Was Shut-In And Time Of Accident Control Center Brought Line Down To 330psig
Num Pub Evacuated
0
Pipe Fac Name
8"/10" Fannett To Port Acres
Segment Name
Txl0028
Onshore State Abbreviation
Tx
Onshore Postal Code
77640
Onshore City Name
Port Acres
Onshore County Name
Jefferson County
Designated Location
Milepost
Designated Name
16.4
Federal
Yes
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
42
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Weld, Including Heat-Affected Zone
Pipe Diameter
8.63
Pipe Wall Thickness
0.25
Pipe Smys
42000
Pipe Specification
Api5l
Pipe Seam Type
Seamless
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Coating Applied Ind
No
Weld Subtype
Pipe Girth Weld
Different Girth Weld Ind
No
Installation Year
1958
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
23
Est Cost Prop Damage
120000
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
120023
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
540
Mop Psig
1461
Mop Cfr Section
Internal Design Pressure �195.406(A)(1)
Maop Established Date
2016-10-05 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The pipeline was in an idle state and the leak was too small to detect by control room
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Design-, Construction-, Installation-, Or Fabrication-Related
Other Analysis Ind
Yes
Other Analysis Details
Vt&rt By Ndt/destructive Testing By Lab
Failure Type
Design-, Construction-, Installation-, Or Fabrication-Related
Pwf Additional Other Ind
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Axial Recent Year
2020
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Metal Loss
Axial Rcnt Atnd Dtct Metal
High Resolution
Axial Previous Year
2016
Axial Prev Propul Method
Free Swimming
Axial Prev Attuned Detect
Metal Loss
Axial Prev Atnd Dtct Metal
High Resolution
Geometry Recent Year
2020
Geometry Rcnt Propul Method
Free Swimming
Geometry Rcnt Resolution
High Resolution
Geometrt Rcnt Measur Cups
Inside Ili Cups
Geometry Previous Year
2016
Geometry Prev Propul Method
Free Swimming
Geometry Prev Resolution
High Resolution
Geometrt Prev Measur Cups
Inside Ili Cups
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2016
Hydrtst Most Rcnt Pressure
1942
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Extrnl Cor Microbiologic Ind
Yes
Preparer Name
C*** M*******
Preparer Title
Regulatory Compliance Specialist
Preparer Email
C************@c******.com
Prepared Date
2023-11-16 00:00:00
Authorizer Name
C*** M*******
Authorizer Telephone
8323649116
Authorizer Title
Regulatory Compliance Specialist
Authorizer Email
C************@c******.com
Narrative
At approx. 1350 cdt on 14aug23, while k9 patrol leak detection services were conducting routine inspections of the frio pipeline row, a release of ppmix was detected coming from below ground near the txl0028 pipeline, which was later confirmed by a gas analyzer. The pipeline was already shut-in at the time the leak was detected for other unrelated operational efforts. At 1525 the pipeline pressure was brought down to 330psig. The pipeline has been repaired and remains down until further investigation efforts can be completed as of 14sep23.
Report Received Date | 2023-09-14 00:00:00 |
---|---|
Iyear | 2023 |
Report Number | 20230213 |
Supplemental Number | 38810 |
Report Type | Supplemental Final |
Operator Id | 2731 PHMSA Enforcement |
Name | Chevron Pipe Line Co |
Operator Street Address | 1400 Smith Street |
Operator City Name | Houston |
Operator State Abbreviation | TX |
Operator Postal Code | 77002 |
Time Zone | Central |
Daylight Savings Ind | Yes |
Location Latitude | 29.91659 Google Maps OpenStreetMap |
Location Longitude | -94.0231 Google Maps OpenStreetMap |
Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
Commodity Subtype | Other Hvl |
Commodity Details | Propylene-Propane Mix (Pp Mix) |
Unintentional Release Bbls | 0.35 |
Intentional Release Bbls | 0 |
Recovered Bbls | 0 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Ground Patrol By Operator Or Its Contractor |
Operator Type | Contractor Working For The Operator |
System Part Involved | Onshore Pipeline, Including Valve Sites |
On Off Shore | Onshore |
Status When Identified | Idle |
Communication State Fed Ind | No |
Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
Ignite Ind | No |
Upstream Action Taken | Operational Control |
Upstream Oprtnl Cntrl Detail | Pipeline Was Shut-In And Time Of Accident Control Center Brought Line Down To 330psig |
Downstream Action Taken | Operational Control |
Downstream Oprtnl Cntrl Detail | Pipeline Was Shut-In And Time Of Accident Control Center Brought Line Down To 330psig |
Num Pub Evacuated | 0 |
Pipe Fac Name | 8"/10" Fannett To Port Acres |
Segment Name | Txl0028 |
Onshore State Abbreviation | Tx |
Onshore Postal Code | 77640 |
Onshore City Name | Port Acres |
Onshore County Name | Jefferson County |
Designated Location | Milepost |
Designated Name | 16.4 |
Federal | Yes |
Location Type | Pipeline Right-Of-Way |
Incident Area Type | Underground |
Incident Area Subtype | Under Soil |
Depth Of Cover | 42 |
Crossing | No |
Pipe Facility Type | Intrastate |
Item Involved | Weld, Including Heat-Affected Zone |
Pipe Diameter | 8.63 |
Pipe Wall Thickness | 0.25 |
Pipe Smys | 42000 |
Pipe Specification | Api5l |
Pipe Seam Type | Seamless |
Pipe Manufacturer | Unknown |
Pipe Coating Type | Coal Tar |
Coating Applied Ind | No |
Weld Subtype | Pipe Girth Weld |
Different Girth Weld Ind | No |
Installation Year | 1958 |
Manufactured Year | Unknown |
Material Involved | Carbon Steel |
Release Type | Leak |
Leak Type | Pinhole |
Wildlife Impact Ind | No |
Soil Contamination | No |
Long Term Assessment | No |
Remediation Ind | No |
Water Contam Ind | No |
Could Be Hca | No |
Commodity Reached Hca | No |
Est Cost Oper Paid | 0 |
Est Cost Gas Released | 23 |
Est Cost Prop Damage | 120000 |
Est Cost Emergency | 0 |
Est Cost Environmental | 0 |
Est Cost Other | 0 |
Prpty | 120023 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 540 |
Mop Psig | 1461 |
Mop Cfr Section | Internal Design Pressure �195.406(A)(1) View CFR 49 §192 |
Maop Established Date | 2016-10-05 00:00:00 |
Maop Reversal Flow Ind | Bi-Directional |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Internal Inspection Ind | Yes |
Operation Complications Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Cpm In Place Ind | Yes |
Cpm Operating Ind | Yes |
Cpm Functional Ind | Yes |
Cpm Detection Ind | No |
Cpm Conf Ind | No |
Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
Investigation Status Details | The pipeline was in an idle state and the leak was too small to detect by control room |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Material Failure Of Pipe Or Weld |
Cause Details | Design-, Construction-, Installation-, Or Fabrication-Related |
Other Analysis Ind | Yes |
Other Analysis Details | Vt&rt By Ndt/destructive Testing By Lab |
Failure Type | Design-, Construction-, Installation-, Or Fabrication-Related |
Pwf Additional Other Ind | Yes |
Collected Data Ind | Yes |
Axial Magnetic Flx Lkg Ind | Yes |
Geometry Deformation Ind | Yes |
Axial Recent Year | 2020 |
Axial Rcnt Propul Method | Free Swimming |
Axial Rcnt Attuned Detect | Metal Loss |
Axial Rcnt Atnd Dtct Metal | High Resolution |
Axial Previous Year | 2016 |
Axial Prev Propul Method | Free Swimming |
Axial Prev Attuned Detect | Metal Loss |
Axial Prev Atnd Dtct Metal | High Resolution |
Geometry Recent Year | 2020 |
Geometry Rcnt Propul Method | Free Swimming |
Geometry Rcnt Resolution | High Resolution |
Geometrt Rcnt Measur Cups | Inside Ili Cups |
Geometry Previous Year | 2016 |
Geometry Prev Propul Method | Free Swimming |
Geometry Prev Resolution | High Resolution |
Geometrt Prev Measur Cups | Inside Ili Cups |
Has Hydrtst Conduc Before Ind | Yes |
Hydrtst Most Rcnt Year | 2016 |
Hydrtst Most Rcnt Pressure | 1942 |
Direct Asmnt Conducted | No |
Non Destructive Exam Ind | No |
Extrnl Cor Microbiologic Ind | Yes |
Preparer Name | C*** M******* |
Preparer Title | Regulatory Compliance Specialist |
Preparer Email | C************@c******.com |
Prepared Date | 2023-11-16 00:00:00 |
Authorizer Name | C*** M******* |
Authorizer Telephone | 8323649116 |
Authorizer Title | Regulatory Compliance Specialist |
Authorizer Email | C************@c******.com |
Narrative | At approx. 1350 cdt on 14aug23, while k9 patrol leak detection services were conducting routine inspections of the frio pipeline row, a release of ppmix was detected coming from below ground near the txl0028 pipeline, which was later confirmed by a gas analyzer. The pipeline was already shut-in at the time the leak was detected for other unrelated operational efforts. At 1525 the pipeline pressure was brought down to 330psig. The pipeline has been repaired and remains down until further investigation efforts can be completed as of 14sep23. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA