HL incident on 2023-09-13 — TX

Operator
Dixie Pipeline Company Llc
Cause
Other Outside Force Damage
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$2,000,000
Incident datetime
2023-09-13 00:00 UTC
Report number
Location
TX
Narrative
On august 15, 2023 at 09:26, the controller received a call from a contractor stating the crew working in the area may have hit the pipeline. Immediately, hcc dispatched field personnel to investigate. At 09:32, the controller received a leak detection alarm and initiated shut down of the pipeline. Additional operations personnel were dispatched to close manual valves closer to the leak site. At 10:05, field personnel arrived near the site and observed bubbling in the water. At 11:15, enterprise determined that, due to the anticipated repair cost exceeding $50k, the nrc was notified. Review of scada data indicates the initial pressure loss occurred at 09:15. The damaged pipeline was cut-out, replaced, pressure tested and returned to service on september 19, 2023 at 07:49.
Detailed record list
Report Received Date
2023-09-13 00:00:00
Iyear
2023
Report Number
20230212
Supplemental Number
38625
Report Type
Supplemental Final
Operator Id
Name
Dixie Pipeline Company Llc
Operator Street Address
1100 Louisiana St.
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Propane
Unintentional Release Bbls
900
Intentional Release Bbls
2818
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Third Party That Caused The Accident
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Nrc Rpt Num
Additional Nrc Report Numbers
1376424
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Type Ind
Remotely Controlled
Downstream Action Taken
Valve Closure
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Mont Belvieu To Apex (Main Line)
Segment Name
120
Onshore State Abbreviation
La
Onshore Postal Code
70517
Onshore City Name
Henderson
Onshore County Name
St Landry
Designated Location
Milepost
Designated Name
199.5
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
16
Crossing
Yes
Water Crossing Ind
Yes
Water Type
Uncased
Water Name
Atchafalaya Basin
Water Depth
2
Water Subtype
Below Water, Pipe Buried Below Bottom (Not In Bored/drilled Crossing)
Crossing 100 Feet
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
10
Pipe Wall Thickness
0.219
Pipe Smys
52000
Pipe Specification
Api-5l
Pipe Seam Type
Erw - Low Frequency
Pipe Manufacturer
J&l Steel
Pipe Coating Type
Other
Pipe Coating Details
Somastic Coating
Coating Applied Ind
Unknown
Installation Year
1962
Manufactured Year
1962
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
1.4
Puncture Circum
1
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
26000
Est Cost Prop Damage
2000000
Est Cost Emergency
90000
Est Cost Environmental
0
Est Cost Other
0
Prpty
2116000
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
280
Mop Psig
1440
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2021-05-29 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
57499
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Outside Force Damage
Cause Details
Other Outside Force Damage
Outside Force Type
Other Outside Force Damage
Osf Other Details
A Marsh Excavator Was Performing Work Related To A Spoil Bank Gapping Project And, While Attempting To Exit The Canal, The Excavator Slid Backwards Down The Bank And Struck The Pipeline With The Tracks Of The Excavator. The Equipment Was Not Performing Excavation At The Time Of The Accident.
Preparer Name
N***** G***
Preparer Title
Senior Pipeline Compliance Specialist
Preparer Email
N****@e****.com
Preparer Telephone
985-493-4629
Prepared Date
2023-10-05 00:00:00
Local Contact Name
N***** G***
Local Contact Email
N****@e****.com
Local Contact Telephone
985-493-4629
Authorizer Name
N*** T*****
Authorizer Telephone
713-381-2493
Authorizer Title
Senior Manager Compliance
Authorizer Email
N*******@e****.com
Narrative
On august 15, 2023 at 09:26, the controller received a call from a contractor stating the crew working in the area may have hit the pipeline. Immediately, hcc dispatched field personnel to investigate. At 09:32, the controller received a leak detection alarm and initiated shut down of the pipeline. Additional operations personnel were dispatched to close manual valves closer to the leak site. At 10:05, field personnel arrived near the site and observed bubbling in the water. At 11:15, enterprise determined that, due to the anticipated repair cost exceeding $50k, the nrc was notified. Review of scada data indicates the initial pressure loss occurred at 09:15. The damaged pipeline was cut-out, replaced, pressure tested and returned to service on september 19, 2023 at 07:49.
Report Received Date 2023-09-13 00:00:00
Iyear 2023
Report Number 20230212
Supplemental Number 38625
Report Type Supplemental Final
Operator Id 3445 PHMSA Enforcement
Name Dixie Pipeline Company Llc
Operator Street Address 1100 Louisiana St.
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 30.39516 Google Maps OpenStreetMap
Location Longitude -91.77217 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Other Hvl
Commodity Details Propane
Unintentional Release Bbls 900
Intentional Release Bbls 2818
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Notification From Third Party That Caused The Accident
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Communication State Fed Ind Yes
Party Initiated Communication Operator
Nrc Rpt Num 1376250 NRC Report How to search
Additional Nrc Report Numbers 1376424
Ignite Ind No
Upstream Action Taken Valve Closure
Upstream Valve Type Ind Remotely Controlled
Downstream Action Taken Valve Closure
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name Mont Belvieu To Apex (Main Line)
Segment Name 120
Onshore State Abbreviation La
Onshore Postal Code 70517
Onshore City Name Henderson
Onshore County Name St Landry
Designated Location Milepost
Designated Name 199.5
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 16
Crossing Yes
Water Crossing Ind Yes
Water Type Uncased
Water Name Atchafalaya Basin
Water Depth 2
Water Subtype Below Water, Pipe Buried Below Bottom (Not In Bored/drilled Crossing)
Crossing 100 Feet No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Puddle Weld Ind No
Pipe Diameter 10
Pipe Wall Thickness 0.219
Pipe Smys 52000
Pipe Specification Api-5l
Pipe Seam Type Erw - Low Frequency
Pipe Manufacturer J&l Steel
Pipe Coating Type Other
Pipe Coating Details Somastic Coating
Coating Applied Ind Unknown
Installation Year 1962
Manufactured Year 1962
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 1.4
Puncture Circum 1
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 26000
Est Cost Prop Damage 2000000
Est Cost Emergency 90000
Est Cost Environmental 0
Est Cost Other 0
Prpty 2116000
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 280
Mop Psig 1440
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 2021-05-29 00:00:00
Maop Reversal Flow Ind Bi-Directional
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 57499
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind Yes
Cpm Conf Ind Yes
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Other Outside Force Damage
Cause Details Other Outside Force Damage
Outside Force Type Other Outside Force Damage
Osf Other Details A Marsh Excavator Was Performing Work Related To A Spoil Bank Gapping Project And, While Attempting To Exit The Canal, The Excavator Slid Backwards Down The Bank And Struck The Pipeline With The Tracks Of The Excavator. The Equipment Was Not Performing Excavation At The Time Of The Accident.
Preparer Name N***** G***
Preparer Title Senior Pipeline Compliance Specialist
Preparer Email N****@e****.com
Preparer Telephone 985-493-4629
Prepared Date 2023-10-05 00:00:00
Local Contact Name N***** G***
Local Contact Email N****@e****.com
Local Contact Telephone 985-493-4629
Authorizer Name N*** T*****
Authorizer Telephone 713-381-2493
Authorizer Title Senior Manager Compliance
Authorizer Email N*******@e****.com
Narrative On august 15, 2023 at 09:26, the controller received a call from a contractor stating the crew working in the area may have hit the pipeline. Immediately, hcc dispatched field personnel to investigate. At 09:32, the controller received a leak detection alarm and initiated shut down of the pipeline. Additional operations personnel were dispatched to close manual valves closer to the leak site. At 10:05, field personnel arrived near the site and observed bubbling in the water. At 11:15, enterprise determined that, due to the anticipated repair cost exceeding $50k, the nrc was notified. Review of scada data indicates the initial pressure loss occurred at 09:15. The damaged pipeline was cut-out, replaced, pressure tested and returned to service on september 19, 2023 at 07:49.